Bid Publish Date
21-Jun-2026, 8:26 am
Bid End Date
03-Jul-2026, 9:00 am
EMD
₹75,000
Location
Progress
RAQuantity
1
Bid Type
Two Packet Bid
The Indian Army invites bids for Prefabricated Shelter Buildings (PUF panel) to be installed at Lachung, North Sikkim. The scope includes shelters with specified wall and roof colours, window counts, and foundation considerations, plus compliance with designated test reports. The contract carries an EMD of ₹75,000 and a potential quantity variation of ±25% with the same contracted rates. Successful bidders must obtain design approval before fabrication, and supply must align with approved drawings. A 3-year comprehensive warranty applies post-installation, covering design, workmanship, and material reliability. This procurement targets reliable, government-grade prefabricated housing solutions with verified testing and on-site installation requirements.
Product: Prefabricated Shelter Buildings with PUF panel
Quantities: ±25% variation allowed on bid quantity
EMD: ₹75,000
Standards/Testing: Test reports from AHSP/NABL/ILAC or Central Govt Lab; on-demand provision
Warranty: 3-year comprehensive warranty from installation acceptance
Delivery: Approval-based fabrication and on-site installation at Lachung, North Sikkim
EMD amount and submission method to SBI Lachung
5-day buyer design approval window with 5-day modification response
25% quantity variation rights during contract execution
EMD ₹75,000 via banker's cheque; location SBI Lachung; no explicit milestone payments described in ATC
Delivery period linked to last date of original delivery order; extended time scales defined by option clause
LD details not specified; delays governed by design approval timelines and option-based extensions
1 year of regular govt/PSU supply experience for similar prefabricated shelters or related products
Evidence via contracts with central/state govt organizations
Ability to submit Detailed Design Drawings within 5 days of award and incorporate requested modifications
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
P.F. Huts with PUF Panel (MHA) (Q3)
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
CATALOG Specification
OTHER
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
| Category | Specification | Requirement |
|---|---|---|
| SIZE | Prefabricated Shelter Building sizes | Barrack 9.76 Mtr (32.00 feet) X 5.50 Mtr (18.00 feet) with 1.52 Mtr (5.00 feet) verandah |
| FOUNDATION | Foundation for Prefab Shelter NOTE : if required | Building of Foundation at site shall be the responsibility of the Consignee and the Seller shall Install / Erect and Commission the structure on the foundation constructed up-to plinth level by the Consignee, No foundation required – can be erected on any flat surface |
| COLOURS | Outside colour of wall panel | As per buyer’s requirement |
| COLOURS | Inside colour of Wall panel and Roof | As per buyer’s requirement |
| OTHERS | Number of windows in each shelter | 8 numbers windows for Barrack 19.52 Mtr (64.00 feet) X 5.50 Mtr (18.00 feet), 4 numbers windows for Barrack 9.76 Mtr (32.00 feet) X 5.50 Mtr (18.00 feet) |
| TEST REPORT | Availability of Test Report from Designated AHSP / NABL / ILAC accredited or Central Government Lab to prove conformity of products to the specification | Yes, No |
| TEST REPORT | Test reports to be furnished to buyer on demand, if claimed to be available Hint | Yes, N.A |
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates from prior govt/PSU contracts
Financial statements for the last 2-3 years
EMD submission document (₹75,000) via banker's cheque to Regiment Fund/SBI Lachung
Technical bid documents and compliance with design approvals
OEM authorization or reseller agreements (if applicable)
Start
14-Jul-2026, 6:00 pm
End
15-Jul-2026, 6:00 pm
Duration: 24 hours
Reverse Auction Document
✅ RA concluded. Check financial results for final rankings.
These are the final prices after the reverse auction event. Prices may be lower than initial bids.
| Rank | Seller | Final Price | Item |
|---|---|---|---|
| L1 | KHALSA STORE(MII) Under PMA Winner | ₹14,97,500 | Item Categories : P.F. Huts with PUF Panel (MHA) |
| L2 | M/S CHANA TRADER AND GENERAL ORDER SUPPLIERS JAWALAPUR BUNJAWAH KISHTWAR (MII) Under PMA | ₹14,99,990 | Item Categories : P.F. Huts with PUF Panel (MHA) |
| L3 | AVR COMPANY (MII) Under PMA | ₹15,10,000 | Item Categories : P.F. Huts with PUF Panel (MHA) |
🎉 L1 Winner
KHALSA STORE(MII) Under PMA
Final Price: ₹14,97,500
Key insights about SIKKIM tender market
Bidders must meet eligibility, submit EMD ₹75,000 via banker's cheque to SBI Lachung, provide GST, PAN, experience certificates, financials, OEM authorizations if required, and Technical bid with Detailed Design Drawings within 5 days of award; ensure conformity with AHSP/NABL/ILAC test reports on demand.
Required documents include GST certificate, PAN, 2-3 years financial statements, prior govt/PSU contracts with copies, EMD receipt, technical bid and OEM/reseller authorizations if applicable, plus Detailed Design Drawings ready for buyer approval within 5 days.
Test reports must be from AHSP, NABL, ILAC accredited labs or Central Government Labs proving conformity to specifications; reports must be furnished on demand by the buyer to validate material and build compliance.
EMD is ₹75,000, payable via banker's cheque in favor of Regiment Fund, payable at SBI Lachung, to be submitted at the specified Lachung address as part of bid submission.
The successful bidder must provide a comprehensive warranty for 3 years from the date of successful installation and acceptance, covering design, workmanship, roofing, flooring, and material quality defects.
Yes. The purchaser may increase or decrease the quantity up to 25% of bid quantity at contracted rates during execution, with extension rules applying if required.
Delivery and on-site installation are at Lachung, North Sikkim; final installation must conform to buyer-approved design drawings and may include foundation work if required.
Bidders must demonstrate regular manufacturing and supply of similar shelters to govt/PSU entities for at least 1 year prior to bid opening, with contract copies for each year.
Sign up now to access all documents
Main Document
CATALOG Specification
OTHER
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS