Progress
Bharat Petroleum Corporation Ltd invites bids for a wide scope of civil and demolition works at KOTA, RAJASTHAN 324001. The procurement covers dismantling existing wall, various excavation depths up to 1.5 m, PCC for footing base 1:4:8, RCC works, brick mason work, plastering, plaster 12-18 mm, two coats of cement primer/paint, slogan lettering, steel reinforcement, concertina fencing removal and refixing, JCB related tasks, brick masonry drains, and plaster finishes. The project includes 17 items in the BOQ with a tentative project footprint requiring precise execution per approved drawings. Estimated value is not disclosed, but EMD ₹100,000 signals high-risk, high-value civil works. A key contractual nuance is the option to increase quantity by up to 25%, with extension calculations linked to original works and delivery windows. The award will hinge on compliance with the buyer's Detailed Design Drawings and the possibility of design modifications within a 5-day approval cycle.
Dismantling existing wall and concertina fencing
Excavation up to 1.5 m depth and below 1.5 m depth
PCC for footing base 1:4:8
RCC for footing, plinth, pillar, beam and RCC above/below plinth
Brick masonry with 18 mm plaster top coat and 12 mm plaster coat
Two coats cement primer and two coats cement paint
Slogan writing letters 300 mm high
Steel reinforcement for RCC components
EMD ₹100,000 required; bid security payment proof
25% quantity variation permitted during contract
5-day submission of Detailed Design Drawings post award
Delivery schedule adjusted if drawings delayed; no LD for buyer delays
Taxes included in Basic Rate; no toll/entry/Octroi extra
Taxes included in Basic Rate; no separate toll/entry/Octroi; payment terms not fully specified in data
Delivery period linked to original delivery order; extension calculated as (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days
Not specified in provided terms; bidders should seek explicit LD terms during clarification
Experience in similar civil construction and dismantling works
Financial capability to sustain project up to the bid value
Compliance with BPCL drawing approvals and site safety standards
Quantity
9823
Category
RCC below plinth footing AND pillar AND beam
Bid Type
Two Packet Bid
Bid Validity
30 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
Yes
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Min. Avg. Annual Turnover
26
OEM Avg. Turnover
26
Past Performance
30 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Dismantling existing wall , Excavation upto 1.5 , Excavation below 1.5 , PCC for footing base 1 IS TO 4 IS TO 8 , RCC below plinth footing AND pillar AND beam , RCC above plinth pillar , Brick mason wall av plinth , PCC on top of BW , Plaster 18mm thick , Two coat cement primer , Two coat cement paint , Slogan writing letters 300 mm , Steel Reinforcement for RCC , Concertina fencing removal and refixing , JCB related work , Brick masonry drain , Plaster 12 mm thick
Advisory Bank
ICICI
ePBG Percentage
5%
ePBG Duration (Months)
18
Payment Timelines
Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
90
Delivery Locations
1
Delivery Cities
Kota
Delivery Pincodes
325201
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Ranjeet Bahadur | 325201,Bharat Petroleum Corporation Ltd, Kota TOP, NH 27, Baran Road, Tathed, Village: Brijeshpura | Kota | Rajasthan | 325201 | 290 | 90 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Extended Deadline
21-Oct-2026, 3:30 pm
Opening Date
22-Oct-2026, 3:30 pm
Dismantling existing wall
All the specification shall be as per scope of work. Refer scope of work
Excavation upto 1.5
All the specification shall be as per scope of work. Refer scope of work
Excavation below 1.5
All the specification shall be as per scope of work. Refer scope of work
PCC for footing base 1 IS TO 4 IS TO 8
All the specification shall be as per scope of work. Refer scope of work
RCC below plinth footing AND pillar AND beam
All the specification shall be as per scope of work. Refer scope of work
RCC above plinth pillar
All the specification shall be as per scope of work. Refer scope of work
Brick mason wall av plinth
All the specification shall be as per scope of work. Refer scope of work
PCC on top of BW
All the specification shall be as per scope of work. Refer scope of work
Plaster 18mm thick
All the specification shall be as per scope of work. Refer scope of work
Two coat cement primer
All the specification shall be as per scope of work. Refer scope of work
Two coat cement paint
All the specification shall be as per scope of work. Refer scope of work
Slogan writing letters 300 mm
All the specification shall be as per scope of work. Refer scope of work
Steel Reinforcement for RCC
All the specification shall be as per scope of work. Refer scope of work
Concertina fencing removal and refixing
All the specification shall be as per scope of work. Refer scope of work
JCB related work
All the specification shall be as per scope of work. Refer scope of work
Brick masonry drain
All the specification shall be as per scope of work. Refer scope of work
Plaster 12 mm thick
All the specification shall be as per scope of work. Refer scope of work
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Dismantling existing wall | All the specification shall be as per scope of work. Refer scope of work | 290 | m3 | bpclranjeet | 90 | |
| 2 | Excavation upto 1.5 | All the specification shall be as per scope of work. Refer scope of work | 454 | m3 | bpclranjeet | 90 | |
| 3 | Excavation below 1.5 | All the specification shall be as per scope of work. Refer scope of work | 71 | m3 | bpclranjeet | 90 | |
| 4 | PCC for footing base 1 IS TO 4 IS TO 8 | All the specification shall be as per scope of work. Refer scope of work | 24 | m3 | bpclranjeet | 90 | |
| 5 | RCC below plinth footing AND pillar AND beam | All the specification shall be as per scope of work. Refer scope of work | 68 | m3 | bpclranjeet | 90 | |
| 6 | RCC above plinth pillar | All the specification shall be as per scope of work. Refer scope of work | 23 | m3 | bpclranjeet | 90 | |
| 7 | Brick mason wall av plinth | All the specification shall be as per scope of work. Refer scope of work | 106 | m3 | bpclranjeet | 90 | |
| 8 | PCC on top of BW | All the specification shall be as per scope of work. Refer scope of work | 3 | m3 | bpclranjeet | 90 | |
| 9 | Plaster 18mm thick | All the specification shall be as per scope of work. Refer scope of work | 740 | m2 | bpclranjeet | 90 | |
| 10 | Two coat cement primer | All the specification shall be as per scope of work. Refer scope of work | 886 | m2 | bpclranjeet | 90 | |
| 11 | Two coat cement paint | All the specification shall be as per scope of work. Refer scope of work | 886 | m2 | bpclranjeet | 90 | |
| 12 | Slogan writing letters 300 mm | All the specification shall be as per scope of work. Refer scope of work | 900 | ea | bpclranjeet | 90 | |
| 13 | Steel Reinforcement for RCC | All the specification shall be as per scope of work. Refer scope of work | 4,665 | kg | bpclranjeet | 90 | |
| 14 | Concertina fencing removal and refixing | All the specification shall be as per scope of work. Refer scope of work | 143 | rm | bpclranjeet | 90 | |
| 15 | JCB related work | All the specification shall be as per scope of work. Refer scope of work | 18 | hr | bpclranjeet | 90 | |
| 16 | Brick masonry drain | All the specification shall be as per scope of work. Refer scope of work | 106 | m3 | bpclranjeet | 90 | |
| 17 | Plaster 12 mm thick | All the specification shall be as per scope of work. Refer scope of work | 440 | m2 | bpclranjeet | 90 |
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates of similar civil works
Financial statements or solvency proof
EMD payment proof (₹100,000)
Technical bid documents and compliance sheets
OEM authorizations (if required by BPCL)
Detailed Design Drawings (within 5 days of award)
Key insights about RAJASTHAN tender market
Bidders must submit GST registration, PAN, experience certificates for similar civil projects, financial statements, EMD ₹100,000, technical bid documents, OEM authorizations if needed, and Detailed Design Drawings within 5 days of contract award; ensure BPCL compliance and site safety certifications.
Prepare a technical bid with scope alignment to dismantling, excavation up to 1.5 m, PCC/RCC works, plastering and slogan letters; attach EMD ₹100,000, ensure 5-day drawing submission post-award, and plan for 25% quantity variation with schedule adjustments as per BPCL terms.
The Earnest Money Deposit is ₹100,000, payable as per BPCL terms; submit proof with bid; EMD signals bid security for performance and to cover potential default; ensure payment method aligns with BPCL guidelines.
Scope includes dismantling, excavation to 1.5 m, PCC 1:4:8, RCC construction, brick masonry drains, plastering, primer and two coats of cement paint, cement-slogan letters; detailed design drawings must be approved within 5 days; explicit BIS/ISO standards are not listed in the data.
Submit Detailed Design Drawings within 5 days of award; BPCL will approve or list modifications within 5 days; delays in approval may extend the delivery period with no LD for buyer-induced delays.
The purchaser may increase/decrease quantity by up to 25% during contract; during currency, the additional time is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days.
Warranty/penalties are not explicitly specified in the data; bidders should seek explicit LD terms and warranty conditions during bid submission and contract finalization, and ensure compliance with site safety and quality standards.