Bid Publish Date
04-Nov-2025, 9:37 am
Bid End Date
27-Nov-2025, 2:00 pm
Location
Progress
Quantity
224
Mazagon Dock Shipbuilders Limited invites bids for a security equipment procurement under the Defence Production framework. The tender implements an option clause allowing up to 50% quantity variation at contracted rates and requires GST-compliant invoicing in the consignee’s name. The process enforces vendor code creation documentation, including PAN, GSTIN, cancelled cheque, and EFT mandate. The scope emphasizes GST accuracy, with reimbursement rules based on actuals or prevailing rates, subject to quoted GST. The contract includes payment and delivery risk mitigations and a co-ordination model via a nominated inspection agency. This tender sits within the government procurement channel (GeM) and adheres to standard GST and invoicing protocols. Target bidders should prepare for potential quantity fluctuations and ensure GST compliance across invoicing and portal uploads.
BOQ total items: 154 (no detailed specifications disclosed)
Delivery period governed by original delivery date and option clause calculations
Invoice naming: Consignee with Consignee GSTIN
Inspection: Nominated Inspection Agency
50% quantity variation right during placement and currency of contract
GST reimbursement rules based on actuals or prevailing rates
Invoices must be GST-compliant and in consignee name
GST-based payment terms with invoice raised in consignee name; GST portal payment confirmation required
Delivery timeline calculated from last date of original delivery order; extended delivery time defined by formula
Buyer may terminate for non-delivery or material breach; penalties implied for delayed/rejected materials
Must submit Vendor Code Creation documents (PAN, GSTIN, cancelled cheque, EFT mandate)
GST-compliant invoicing capability and GeM portal readiness
Ability to absorb 50% quantity variation within contract terms
Main Document
OTHER
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | 1.Switchboard for Emergency Diesel Alternator 15KW | Switchboard for Emergency Diesel Alternator (15KW) as per the Single Line Diagram attached at Annexure-01 and as per TSP | 1 | nos | sbk_mdlstores | 90 |
| 2 | 2.Shore Supply Connection Box | Shore Supply Connection Box as per TSP | 2 | nos | sbk_mdlstores | 90 |
| 3 | 3.Hand Changeover Switch 80A as per TSP para 1.2.6-2.6 | Hand Changeover Switch, 80A as per TSP para 1.2.6, 2.6 | 2 | ea | sbk_mdlstores | 90 |
| 4 | 4.Hand Changeover Switch 25A | Hand Changeover Switch, 25A as per TSP | 3 | ea | sbk_mdlstores | 90 |
| 5 | 5.Cable Roller | Cable Roller As per TSP | 2 | nos | sbk_mdlstores | 90 |
| 6 | 6.On Board Spare | On Board Spare As per TSP | 1 | set | sbk_mdlstores | 90 |
| 7 | 7.Documentation and Drawing | Documentation & Drawing, As per TSP | 1 | set | sbk_mdlstores | 90 |
| 8 | 8.Installation Material | Installation Material | 1 | set | sbk_mdlstores | 90 |
| 9 | 9.Services of Engineers HATs for ESB | Services of Engineers HATs for ESB | 1 | au | sbk_mdlstores | 150 |
| 10 | 10.Services of Engineers SATs for ESB | Services of Engineers SATs for ESB | 1 | au | sbk_mdlstores | 180 |
| 11 | 11.Services of Engineers STW For ESB | Services of Engineers STW For ESB | 1 | au | sbk_mdlstores | 210 |
| 12 | 12.Switchboard for Emergency Diesel Alternator 15KW | Switchboard for Emergency Diesel Alternator 15KW as per the Single Line Diagram attached at Annexure-01 and as per TSP | 1 | nos | sbk_mdlstores | 90 |
| 13 | 13.Shore Supply Connection Box | Shore Supply Connection Box as per TSP | 2 | nos | sbk_mdlstores | 90 |
| 14 | 14.Hand Changeover Switch 80A as per TSP para 1.2.6 -2.6 | Hand Changeover Switch, 80A as per TSP para 1.2.6, 2.6 | 2 | ea | sbk_mdlstores | 90 |
| 15 | 15.Hand Changeover Switch 25A | Hand Changeover Switch, 25A as per TSP | 3 | ea | sbk_mdlstores | 90 |
| 16 | 16.Cable Roller | Cable Roller As per TSP | 2 | nos | sbk_mdlstores | 90 |
| 17 | 17.On Board Spare | On Board Spare As per TSP | 1 | set | sbk_mdlstores | 90 |
| 18 | 18.Documentation and Drawing | Documentation & Drawing, As per TSP | 1 | set | sbk_mdlstores | 90 |
| 19 | 19.Installation Material | Installation Material | 1 | set | sbk_mdlstores | 90 |
| 20 | 20.Services of Engineers HATs for ESB | Services of Engineers HATs for ESB | 1 | au | sbk_mdlstores | 150 |
| 21 | 21.Services of Engineers SATs for ESB | Services of Engineers SATs for ESB | 1 | au | sbk_mdlstores | 180 |
| 22 | 22.Services of Engineers STW For ESB | Services of Engineers STW For ESB | 1 | au | sbk_mdlstores | 210 |
| 23 | 23.Switchboard for Emergency Diesel Alternator 15KW | Switchboard for Emergency Diesel Alternator 15KW as per the Single Line Diagram attached at Annexure-01 and as per TSP | 1 | nos | sbk_mdlstores | 180 |
| 24 | 24.Shore Supply Connection Box | Shore Supply Connection Box as per TSP | 2 | nos | sbk_mdlstores | 180 |
| 25 | 25.Hand Changeover Switch 80A as per TSP para 1.2.6-2.6 | Hand Changeover Switch, 80A as per TSP para 1.2.6, 2.6 | 2 | ea | sbk_mdlstores | 180 |
| 26 | 26.Hand Changeover Switch 25A | Hand Changeover Switch, 25A as per TSP | 3 | ea | sbk_mdlstores | 180 |
| 27 | 27.Cable Roller | Cable Roller As per TSP | 2 | nos | sbk_mdlstores | 180 |
| 28 | 28.On Board Spare | On Board Spare As per TSP | 1 | set | sbk_mdlstores | 180 |
| 29 | 29.Documentation and Drawing | Documentation & Drawing, As per TSP | 1 | set | sbk_mdlstores | 180 |
| 30 | 30.Installation Material | Installation Material | 1 | set | sbk_mdlstores | 180 |
| 31 | 31.Services of Engineers HATs for ESB | Services of Engineers HATs for ESB | 1 | au | sbk_mdlstores | 240 |
| 32 | 32.Services of Engineers SATs for ESB | Services of Engineers SATs for ESB | 1 | au | sbk_mdlstores | 270 |
| 33 | 33.Services of Engineers STW For ESB | Services of Engineers STW For ESB | 1 | au | sbk_mdlstores | 300 |
| 34 | 34.Switchboard for Emergency Diesel Alternator 15KW | Switchboard for Emergency Diesel Alternator 15KW as per the Single Line Diagram attached at Annexure-01 and as per TSP | 1 | nos | sbk_mdlstores | 180 |
| 35 | 35.Shore Supply Connection Box | Shore Supply Connection Box as per TSP | 2 | nos | sbk_mdlstores | 180 |
| 36 | 36.Hand Changeover Switch 80A as per TSP para 1.2.6-2.6 | Hand Changeover Switch, 80A as per TSP para 1.2.6, 2.6 | 2 | ea | sbk_mdlstores | 180 |
| 37 | 37.Hand Changeover Switch 25A | Hand Changeover Switch, 25A as per TSP | 3 | ea | sbk_mdlstores | 180 |
| 38 | 38.Cable Roller | Cable Roller As per TSP | 2 | nos | sbk_mdlstores | 180 |
| 39 | 39.On Board Spare | On Board Spare As per TSP | 1 | set | sbk_mdlstores | 180 |
| 40 | 40.Documentation and Drawing | Documentation & Drawing, As per TSP | 1 | set | sbk_mdlstores | 180 |
| 41 | 41.Installation Material | Installation Material | 1 | set | sbk_mdlstores | 180 |
| 42 | 42.Services of Engineers HATs for ESB | Services of Engineers HATs for ESB | 1 | au | sbk_mdlstores | 240 |
| 43 | 43.Services of Engineers SATs for ESB | Services of Engineers SATs for ESB | 1 | au | sbk_mdlstores | 270 |
| 44 | 44.Services of Engineers STW For ESB | Services of Engineers STW For ESB | 1 | au | sbk_mdlstores | 300 |
| 45 | 45.Switchboard for Emergency Diesel Alternator 15KW | Switchboard for Emergency Diesel Alternator 15KW as per the Single Line Diagram attached at Annexure-01 and as per TSP | 1 | nos | sbk_mdlstores | 240 |
| 46 | 46.Shore Supply Connection Box | Shore Supply Connection Box as per TSP | 2 | nos | sbk_mdlstores | 240 |
| 47 | 47.Hand Changeover Switch 80A as per TSP para 1.2.6-2.6 | Hand Changeover Switch, 80A as per TSP para 1.2.6, 2.6 | 2 | ea | sbk_mdlstores | 240 |
| 48 | 48.Hand Changeover Switch 25A | Hand Changeover Switch, 25A as per TSP | 3 | ea | sbk_mdlstores | 240 |
| 49 | 49.Cable Roller | Cable Roller As per TSP | 2 | nos | sbk_mdlstores | 240 |
| 50 | 50.On Board Spare | On Board Spare As per TSP | 1 | set | sbk_mdlstores | 240 |
| 51 | 51.Documentation and Drawing | Documentation & Drawing, As per TSP | 1 | set | sbk_mdlstores | 240 |
| 52 | 52.Installation Material | Installation Material | 1 | set | sbk_mdlstores | 240 |
| 53 | 53.Services of Engineers HATs for ESB | Services of Engineers HATs for ESB | 1 | au | sbk_mdlstores | 270 |
| 54 | 54.Services of Engineers SATs for ESB | Services of Engineers SATs for ESB | 1 | au | sbk_mdlstores | 300 |
| 55 | 55.Services of Engineers STW For ESB | Services of Engineers STW For ESB | 1 | au | sbk_mdlstores | 330 |
| 56 | 56.Switchboard for Emergency Diesel Alternator 15KW | Switchboard for Emergency Diesel Alternator 15KW as per the Single Line Diagram attached at Annexure-01 and as per TSP | 1 | nos | sbk_mdlstores | 360 |
| 57 | 57.Shore Supply Connection Box | Shore Supply Connection Box as per TSP | 2 | nos | sbk_mdlstores | 360 |
| 58 | 58.Hand Changeover Switch 80A as per TSP para 1.2.6-2.6 | Hand Changeover Switch, 80A as per TSP para 1.2.6, 2.6 | 2 | ea | sbk_mdlstores | 360 |
| 59 | 59.Hand Changeover Switch 25A | Hand Changeover Switch, 25A as per TSP | 3 | ea | sbk_mdlstores | 360 |
| 60 | 60.Cable Roller | Cable Roller As per TSP | 2 | nos | sbk_mdlstores | 360 |
| 61 | 61.On Board Spare | On Board Spare As per TSP | 1 | set | sbk_mdlstores | 360 |
| 62 | 62.Documentation and Drawing | Documentation & Drawing, As per TSP | 1 | set | sbk_mdlstores | 360 |
| 63 | 63.Installation Material | Installation Material | 1 | set | sbk_mdlstores | 360 |
| 64 | 64.Services of Engineers HATs for ESB | Services of Engineers HATs for ESB | 1 | au | sbk_mdlstores | 390 |
| 65 | 65.Services of Engineers SATs for ESB | Services of Engineers SATs for ESB | 1 | au | sbk_mdlstores | 420 |
| 66 | 66.Services of Engineers STW For ESB | Services of Engineers STW For ESB | 1 | au | sbk_mdlstores | 450 |
| 67 | 67.Switchboard for Emergency Diesel Alternator 15KW | Switchboard for Emergency Diesel Alternator 15KW as per the Single Line Diagram attached at Annexure-01 and as per TSP | 1 | nos | sbk_mdlstores | 420 |
| 68 | 68.Shore Supply Connection Box | Shore Supply Connection Box as per TSP | 2 | nos | sbk_mdlstores | 420 |
| 69 | 69.Hand Changeover Switch 80A as per TSP para 1.2.6-2.6 | Hand Changeover Switch, 80A as per TSP para 1.2.6, 2.6 | 2 | ea | sbk_mdlstores | 420 |
| 70 | 70.Hand Changeover Switch 25A | Hand Changeover Switch, 25A as per TSP | 3 | ea | sbk_mdlstores | 420 |
| 71 | 71.Cable Roller | Cable Roller As per TSP | 2 | nos | sbk_mdlstores | 420 |
| 72 | 72.On Board Spare | On Board Spare As per TSP | 1 | set | sbk_mdlstores | 420 |
| 73 | 73.Documentation and Drawing | Documentation & Drawing, As per TSP | 1 | set | sbk_mdlstores | 420 |
| 74 | 74.Installation Material | Installation Material | 1 | set | sbk_mdlstores | 420 |
| 75 | 75.Services of Engineers HATs for ESB | Services of Engineers HATs for ESB | 1 | au | sbk_mdlstores | 450 |
| 76 | 76.Services of Engineers SATs for ESB | Services of Engineers SATs for ESB | 1 | au | sbk_mdlstores | 480 |
| 77 | 77.Services of Engineers STW For ESB | Services of Engineers STW For ESB | 1 | au | sbk_mdlstores | 510 |
| 78 | 78.Switchboard for Emergency Diesel Alternator 15KW | Switchboard for Emergency Diesel Alternator 15KW as per the Single Line Diagram attached at Annexure-01 and as per TSP | 1 | nos | sbk_mdlstores | 450 |
| 79 | 79.Shore Supply Connection Box | Shore Supply Connection Box as per TSP | 2 | nos | sbk_mdlstores | 450 |
| 80 | 80.Hand Changeover Switch 80A as per TSP para 1.2.6-2.6 | Hand Changeover Switch, 80A as per TSP para 1.2.6, 2.6 | 2 | ea | sbk_mdlstores | 450 |
| 81 | 81.Hand Changeover Switch 25A | Hand Changeover Switch, 25A as per TSP | 3 | ea | sbk_mdlstores | 450 |
| 82 | 82.Cable Roller | Cable Roller As per TSP | 2 | nos | sbk_mdlstores | 450 |
| 83 | 83.On Board Spare | On Board Spare As per TSP | 1 | set | sbk_mdlstores | 450 |
| 84 | 84.Documentation and Drawing | Documentation & Drawing, As per TSP | 1 | set | sbk_mdlstores | 450 |
| 85 | 85.Installation Material | Installation Material | 1 | set | sbk_mdlstores | 450 |
| 86 | 86.Services of Engineers HATs for ESB | Services of Engineers HATs for ESB | 1 | au | sbk_mdlstores | 480 |
| 87 | 87.Services of Engineers SATs for ESB | Services of Engineers SATs for ESB | 1 | au | sbk_mdlstores | 510 |
| 88 | 88.Services of Engineers STW For ESB | Services of Engineers STW For ESB | 1 | au | sbk_mdlstores | 540 |
| 89 | 89.Switchboard for Emergency Diesel Alternator 15KW | Switchboard for Emergency Diesel Alternator 15KW as per the Single Line Diagram attached at Annexure-01 and as per TSP | 1 | nos | sbk_mdlstores | 570 |
| 90 | 90.Shore Supply Connection Box | Shore Supply Connection Box as per TSP | 2 | nos | sbk_mdlstores | 570 |
| 91 | 91.Hand Changeover Switch 80A as per TSP para 1.2.6-2.6 | Hand Changeover Switch, 80A as per TSP para 1.2.6, 2.6 | 2 | ea | sbk_mdlstores | 570 |
| 92 | 92.Hand Changeover Switch 25A | Hand Changeover Switch, 25A as per TSP | 3 | ea | sbk_mdlstores | 570 |
| 93 | 93.Cable Roller | Cable Roller As per TSP | 2 | nos | sbk_mdlstores | 570 |
| 94 | 94.On Board Spare | On Board Spare As per TSP | 1 | set | sbk_mdlstores | 570 |
| 95 | 95.Documentation and Drawing | Documentation & Drawing, As per TSP | 1 | set | sbk_mdlstores | 570 |
| 96 | 96.Installation Material | Installation Material | 1 | set | sbk_mdlstores | 570 |
| 97 | 97.Services of Engineers HATs for ESB | Services of Engineers HATs for ESB | 1 | au | sbk_mdlstores | 600 |
| 98 | 98.Services of Engineers SATs for ESB | Services of Engineers SATs for ESB | 1 | au | sbk_mdlstores | 630 |
| 99 | 99.Services of Engineers STW For ESB | Services of Engineers STW For ESB | 1 | au | sbk_mdlstores | 660 |
| 100 | 100.Switchboard for Emergency Diesel Alternator 15KW | Switchboard for Emergency Diesel Alternator 15KW as per the Single Line Diagram attached at Annexure-01 and as per TSP | 1 | nos | sbk_mdlstores | 660 |
| 101 | 101.Shore Supply Connection Box | Shore Supply Connection Box as per TSP | 2 | nos | sbk_mdlstores | 660 |
| 102 | 102.Hand Changeover Switch 80A as per TSP para 1.2.6-2.6 | Hand Changeover Switch, 80A as per TSP para 1.2.6, 2.6 | 2 | ea | sbk_mdlstores | 660 |
| 103 | 103.Hand Changeover Switch 25A | Hand Changeover Switch, 25A as per TSP | 3 | ea | sbk_mdlstores | 660 |
| 104 | 104.Cable Roller | Cable Roller As per TSP | 2 | nos | sbk_mdlstores | 660 |
| 105 | 105.On Board Spare | On Board Spare As per TSP | 1 | set | sbk_mdlstores | 660 |
| 106 | 106.Documentation and Drawing | Documentation & Drawing, As per TSP | 1 | set | sbk_mdlstores | 660 |
| 107 | 107.Installation Material | Installation Material | 1 | set | sbk_mdlstores | 660 |
| 108 | 108.Services of Engineers HATs for ESB | Services of Engineers HATs for ESB | 1 | au | sbk_mdlstores | 690 |
| 109 | 109.Services of Engineers SATs for ESB | Services of Engineers SATs for ESB | 1 | au | sbk_mdlstores | 720 |
| 110 | 110.Services of Engineers STW For ESB | Services of Engineers STW For ESB | 1 | au | sbk_mdlstores | 750 |
| 111 | 111.Switchboard for Emergency Diesel Alternator 15KW | Switchboard for Emergency Diesel Alternator 15KW as per the Single Line Diagram attached at Annexure-01 and as per TSP | 1 | nos | sbk_mdlstores | 750 |
| 112 | 112.Shore Supply Connection Box | Shore Supply Connection Box as per TSP | 2 | nos | sbk_mdlstores | 750 |
| 113 | 113.Hand Changeover Switch 80A as per TSP para 1.2.6-2.6 | Hand Changeover Switch, 80A as per TSP para 1.2.6, 2.6 | 2 | ea | sbk_mdlstores | 750 |
| 114 | 114.Hand Changeover Switch 25A | Hand Changeover Switch, 25A as per TSP | 3 | ea | sbk_mdlstores | 750 |
| 115 | 115.Cable Roller | Cable Roller As per TSP | 2 | nos | sbk_mdlstores | 750 |
| 116 | 116.On Board Spare | On Board Spare As per TSP | 1 | set | sbk_mdlstores | 750 |
| 117 | 117.Documentation and Drawing | Documentation & Drawing, As per TSP | 1 | set | sbk_mdlstores | 750 |
| 118 | 118.Installation Material | Installation Material | 1 | set | sbk_mdlstores | 750 |
| 119 | 119.Services of Engineers HATs for ESB | Services of Engineers HATs for ESB | 1 | au | sbk_mdlstores | 780 |
| 120 | 120.Services of Engineers SATs for ESB | Services of Engineers SATs for ESB | 1 | au | sbk_mdlstores | 810 |
| 121 | 121.Services of Engineers STW For ESB | Services of Engineers STW For ESB | 1 | au | sbk_mdlstores | 840 |
| 122 | 122.Switchboard for Emergency Diesel Alternator 15KW | Switchboard for Emergency Diesel Alternator 15KW as per the Single Line Diagram attached at Annexure-01 and as per TSP | 1 | nos | sbk_mdlstores | 840 |
| 123 | 123.Shore Supply Connection Box | Shore Supply Connection Box as per TSP | 2 | nos | sbk_mdlstores | 840 |
| 124 | 124.Hand Changeover Switch 80A as per TSP para 1.2.6-2.6 | Hand Changeover Switch, 80A as per TSP para 1.2.6, 2.6 | 2 | ea | sbk_mdlstores | 840 |
| 125 | 125.Hand Changeover Switch 25A | Hand Changeover Switch, 25A as per TSP | 3 | ea | sbk_mdlstores | 840 |
| 126 | 126.Cable Roller | Cable Roller As per TSP | 2 | nos | sbk_mdlstores | 840 |
| 127 | 127.On Board Spare | On Board Spare As per TSP | 1 | set | sbk_mdlstores | 840 |
| 128 | 128.Documentation and Drawing | Documentation & Drawing, As per TSP | 1 | set | sbk_mdlstores | 840 |
| 129 | 129.Installation Material | Installation Material | 1 | set | sbk_mdlstores | 840 |
| 130 | 130.Services of Engineers HATs for ESB | Services of Engineers HATs for ESB | 1 | au | sbk_mdlstores | 870 |
| 131 | 131.Services of Engineers SATs for ESB | Services of Engineers SATs for ESB | 1 | au | sbk_mdlstores | 900 |
| 132 | 132.Services of Engineers STW For ESB | Services of Engineers STW For ESB | 1 | au | sbk_mdlstores | 930 |
| 133 | 133.Switchboard for Emergency Diesel Alternator 15KW | Switchboard for Emergency Diesel Alternator 15KW as per the Single Line Diagram attached at Annexure-01 and as per TSP | 1 | nos | sbk_mdlstores | 930 |
| 134 | 134.Shore Supply Connection Box | Shore Supply Connection Box as per TSP | 2 | nos | sbk_mdlstores | 930 |
| 135 | 135.Hand Changeover Switch 80A as per TSP para 1.2.6-2.6 | Hand Changeover Switch, 80A as per TSP para 1.2.6, 2.6 | 2 | ea | sbk_mdlstores | 930 |
| 136 | 136.Hand Changeover Switch 25A | Hand Changeover Switch, 25A as per TSP | 3 | ea | sbk_mdlstores | 930 |
| 137 | 137.Cable Roller | Cable Roller As per TSP | 2 | nos | sbk_mdlstores | 930 |
| 138 | 138.On Board Spare | On Board Spare As per TSP | 1 | set | sbk_mdlstores | 930 |
| 139 | 139.Documentation and Drawing | Documentation & Drawing, As per TSP | 1 | set | sbk_mdlstores | 930 |
| 140 | 140.Installation Material | Installation Material | 1 | set | sbk_mdlstores | 930 |
| 141 | 141.Services of Engineers HATs for ESB | Services of Engineers HATs for ESB | 1 | au | sbk_mdlstores | 960 |
| 142 | 142.Services of Engineers SATs for ESB | Services of Engineers SATs for ESB | 1 | au | sbk_mdlstores | 990 |
| 143 | 142.Services of Engineers STW For ESB | Services of Engineers STW For ESB | 1 | au | sbk_mdlstores | 1,020 |
| 144 | 144.Switchboard for Emergency Diesel Alternator 15KW | Switchboard for Emergency Diesel Alternator 15KW as per the Single Line Diagram attached at Annexure-01 and as per TSP | 1 | nos | sbk_mdlstores | 1,020 |
| 145 | 145.Shore Supply Connection Box | Shore Supply Connection Box as per TSP | 2 | nos | sbk_mdlstores | 1,020 |
| 146 | 146.Hand Changeover Switch 80A as per TSP para 1.2.6-2.6 | Hand Changeover Switch, 80A as per TSP para 1.2.6, 2.6 | 2 | ea | sbk_mdlstores | 1,020 |
| 147 | 147.Hand Changeover Switch 25A | Hand Changeover Switch, 25A as per TSP | 3 | ea | sbk_mdlstores | 1,020 |
| 148 | 148.Cable Roller | Cable Roller As per TSP | 2 | nos | sbk_mdlstores | 1,020 |
| 149 | 149.On Board Spare | On Board Spare As per TSP | 1 | set | sbk_mdlstores | 1,020 |
| 150 | 150.Documentation and Drawing | Documentation & Drawing, As per TSP | 1 | set | sbk_mdlstores | 1,020 |
| 151 | 151.Installation Material | Installation Material | 1 | set | sbk_mdlstores | 1,020 |
| 152 | 152.Services of Engineers HATs for ESB | Services of Engineers HATs for ESB | 1 | au | sbk_mdlstores | 1,050 |
| 153 | 153.Services of Engineers SATs for ESB | Services of Engineers SATs for ESB | 1 | au | sbk_mdlstores | 1,080 |
| 154 | 154.Services of Engineers STW For ESB | Services of Engineers STW For ESB | 1 | au | sbk_mdlstores | 1,110 |
Discover companies most likely to bid on this tender
PAN Card copy
GSTIN copy
Cancelled Cheque copy
EFT Mandate certified by Bank
GST invoice copy (for GeM portal) and GST portal payment confirmation screenshot
Extended Deadline
27-Nov-2025, 2:00 pm
Opening Date
27-Nov-2025, 2:30 pm
Key insights about MAHARASHTRA tender market
Bidders must submit Vendor Code Creation documents (PAN, GSTIN, cancelled cheque, EFT mandate) and ensure GST-compliant invoicing in the consignee name. The tender permits up to 50% quantity variation and requires GeM portal GST invoice uploads with payment confirmation. Prepare for an inspection by a nominated agency and adhere to delivery timelines per original and extended periods.
Submit PAN Card, GSTIN, Cancelled Cheque, and bank-certified EFT Mandate. These documents enable vendor code creation and participation. Ensure GST details match invoices, and have digital copies ready for upload during bid submission on GeM.
Invoices must be raised in the consignee name with the consignee GSTIN. Additionally, bidders must upload a scanned GST invoice and a GST portal payment confirmation screenshot on GeM to validate GST compliance and trigger payment processing following contract terms.
The buyer may increase or decrease quantity by up to 50% at contract start or during the contract. Delivery time is calculated using the formula: (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days; extended periods are allowed within the original delivery window.
A Nominated Inspection Agency will conduct pre- and post-delivery checks on behalf of the buyer. Compliance with quality and performance requirements observed during inspection can affect acceptance, payment milestones, and potential rework or rejection of non-conforming material.
GST reimbursement will follow actuals or applicable rates (whichever is lower), capped to the quoted GST. Invoices must be GST-compliant and reflect the consignee's GSTIN. Payments are contingent on successful GST portal confirmations and timely delivery per contract terms.
Eligibility hinges on providing PAN, GSTIN, and banking documents for EFT; ability to manage 50% quantity fluctuation; readiness to generate GST-compliant invoices; acceptance of inspection by a nominated agency; pledged delivery within the original or extended delivery period.
Ensure all documents are digitized (PAN, GSTIN, cheque copy, EFT mandate), upload GST invoice copies, and provide GST payment confirmations. Verify consignee details and ensure itemization aligns with the 154 BOQ items, even if detailed specs are not disclosed in the data.
Sign up now to access all documents
Main Document
OTHER
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS