UPPCL 33/11 KV Line Material & Safe Carriage Supply Tender Etah Uttar Pradesh 2026

Bid Publish Date

03-Jul-2026, 7:58 pm

Bid End Date

18-Jul-2026, 8:00 pm

EMD

₹39,000

Value

₹39,00,000

Progress

Issue03-Jul-2026, 7:58 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

21850

Category

Erection of 13 M STP Single Support

Bid Type

Two Packet Bid

Key Highlights

  • Dedicated/toll-free service number for post-sale support and escalation matrix required from bidder/OEM
  • Option clause enabling ±25% quantity adjustment with proportional delivery time adjustments
  • FDR-based performance security accepted alongside PBG; original FDR required within 15 days of award
  • No explicit ISI/IS standards listed in tender data; ensure alignment with standard industry practices and GeM terms
  • Wide scope covering both supply of 33 KV/11 KV line materials and extensive erection and safe carriage tasks
  • 108 BOQ items indicate broad material and labor involvement; ensure coordination for timely delivery
  • Etah, Uttar Pradesh focus with estimated contract value ₹3.9 million and EMD ₹39 thousand

Categories 77

Tender Overview

Organization: Uttar Pradesh Power Corporation Limited (UPPCL) seeks supply, carriage and erection services for a broad range of transmission and distribution line materials in Etah, Uttar Pradesh. The estimated contract value is ₹3,900,000 with an EMD of ₹39,000. Scope includes 33 KV/11 KV line material, LT line material, safe carriage, multiple erection works (including 13 m STP poles, barbed wire, clamps, earthing, painting), and related civil/installation activities. The procurement emphasizes comprehensive material supply plus on-site handling and installation, using the tender’s option clause to adjust quantity up to ±25%. This is a high-volume, multi-item delivery requiring coordinated logistics and field execution. The presence of a formal FDR/PBG path and dedicated service support underscores risk mitigation and post-award performance.

Key Specifications

  • Scope includes: 33 KV line material, 11 KV line material, LT line material

  • Safe carriage of 33 KV line material, dismantled ST poles, LT cables, XLPE cables

  • Erection works: 13 M STP/11 M STP single/double pole, barbed wire, PG clamps, holding clamps

  • Electrical components: earthing, corrosion protection paints, red oxide/Aluminium paints

  • Installation: cable laying (XLPE, LT AB), GI wires (8 SWG, 10 SWG), GI pipes

  • Delivery: up to ±25% quantity variation; minimum 30 days extension; delivery from last order date

Terms & Conditions

  • Quantity flexibility up to 25% with proportional delivery extension

  • EMD ₹39,000; FDR/PBG both acceptable; original FDR due within 15 days

  • Dedicated service support and escalation matrix required from bidder/OEM

Important Clauses

Payment Terms

Payment terms aligned to GeM GTC; post-delivery payments subject to contract terms and PBG/FDR compliance

Delivery Schedule

Delivery period starts from last date of original delivery order; option clause allows extension with minimum 30 days

Penalties/Liquidated Damages

Penalties/LD to be defined in ATC; service support obligations include escalation and timely delivery

Bidder Eligibility

  • Not under liquidation, court receivership, or bankruptcy; provide undertaking

  • Proven experience in supply and/or erection of 33 KV/11 KV line materials

  • Financial capacity to handle ₹3.9 million contract value and performance security requirements

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Supply of 33 KV Line Material , Supply of 11 KV Line Material , Supply of LT Line Material , Safe Carriage of 33 KV Line Material , Safe Carriage of 13 M STP , Erection of 13 M STP Single Support , Erection of 13 M STP Try Pole , Laying ACSR Dog Conductor , Erection of Barbed Wire , Erection of F Bracket , Erection of Danger Board , Erection of PG Clamp , Erection of Holding Clamp , Erection of Earthing Complete , Erection of Allunimum Paint , Erection of Red Oxiode Paint , Dismentalling of ST Pole etc , Safe Carriage of Dismantilled ST Pole etc , Safe Carriage of 11 KV Line Material , Safe Carriage of 11 M STP , Safe Carriage of 11 KV XLPE , Erection of 11 M STP Single Support , Erection of 11 M STP Section Pole , Erection of 11 M STP Double Pole , Dismentalling old Dog Conductor , Laying of XLPE Cable , Fixing of HDPE Pipe with XLPE Cable , Laying of GI Wire 8 SWG , Laying of GI Wire 10 SWG , Laying of LT Cable , Erection of Cable Jointing Kit Outdoor , Loading and Unloading TF , Erection of Plinth 250 KVATF , Providing and Installation of Fancing , Erection of Pipe earthing , Erection of Number Plate , Erection of GI Pipe , Erection of Allunimum Binding Wire , Erection of Stay Set Complete , Safe Carriage of LT Line Material , Safe Carriage of 9 M STP , Safe Carriage of LT AB Cable , Safe Carriage of LT XLPE Cable , Erection of 9 M STP Single Support , Laying of LT XLPE Cable , Dismentalling of LT AB Cable , Erection of LT AB Cable , Erection of Distribution Box Clamp , Safe carriage of dismantilled Material

Authority Records

ENERGY DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-9542804.pdf

Main Document

Other Documents

OTHER

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 108 Items Sign in for GEM prices

#1

Supply of 33 KV Line Material

Barbed Wire GI

26 kg Delivery: 30 days
#2

Supply of 33 KV Line Material

Danger Board with Clamp and Nut

14 no Delivery: 30 days
#3

Supply of 33 KV Line Material

Top Channel

12 no Delivery: 30 days
#4

Supply of 33 KV Line Material

F Bracket with nut and bolts

22 no Delivery: 30 days
#5

Supply of 33 KV Line Material

PG Clamp

24 no Delivery: 30 days
#6

Supply of 33 KV Line Material

Cross Arm Holding Clamp with Nut and Bolts

10 no Delivery: 30 days
#7

Supply of 33 KV Line Material

MS Angle iron for Bracing

12 no Delivery: 30 days
#8

Supply of 33 KV Line Material

Nut and Bolts with Washer

22 kg Delivery: 30 days
#9

Supply of 33 KV Line Material

Number Plate with Clamp and Nut Bolts

14 no Delivery: 30 days
#10

Supply of 33 KV Line Material

MS Angle for Cross Arm with Clamp

10 no Delivery: 30 days
#11

Supply of 33 KV Line Material

Allunimum Paint

18 l Delivery: 30 days
#12

Supply of 33 KV Line Material

Red Oxide Paint

18 l Delivery: 30 days
#13

Supply of 33 KV Line Material

Allunimum Binding wire 6 mm Dia

22 kg Delivery: 30 days
#14

Supply of 33 KV Line Material

Clamp with Nut and Bolts for Top Channel

24 no Delivery: 30 days
#15

Supply of 11 KV Line Material

Danger Board with Clamp and Nut

48 no Delivery: 30 days
#16

Supply of 11 KV Line Material

Number Plate with Clamp and Nut Bolts

32 no Delivery: 30 days
#17

Supply of 11 KV Line Material

Allunimum Paint

10 l Delivery: 30 days
#18

Supply of 11 KV Line Material

Barbed Wire GI

122 kg Delivery: 30 days
#19

Supply of 11 KV Line Material

T off Channel

9 no Delivery: 30 days
#20

Supply of 11 KV Line Material

T off Channel Clamp

9 no Delivery: 30 days
#21

Supply of 11 KV Line Material

Guarding Angle with Clamp

50 no Delivery: 30 days
#22

Supply of 11 KV Line Material

GI wire 10 SWG

86 kg Delivery: 30 days
#23

Supply of 11 KV Line Material

MS Top Channel

16 no Delivery: 30 days
#24

Supply of 11 KV Line Material

MS Angle Iron 2700 mm Long with 4 Clamp

2 no Delivery: 30 days
#25

Supply of 11 KV Line Material

Clamp with Nut and Bolts for Top Channel

92 no Delivery: 30 days
#26

Supply of 11 KV Line Material

E Bracket with Nut and Bolts

48 no Delivery: 30 days
#27

Supply of 11 KV Line Material

PG Clamp

84 no Delivery: 30 days
#28

Supply of 11 KV Line Material

MS Dropper Channel

10 no Delivery: 30 days
#29

Supply of 11 KV Line Material

MS Base Angle for TF

14 no Delivery: 30 days
#30

Supply of 11 KV Line Material

MS Angle for Cable Support

8 no Delivery: 30 days
#31

Supply of 11 KV Line Material

GI Pipe 6 inch Dia

48 m Delivery: 30 days
#32

Supply of 11 KV Line Material

HDPE Pipe 120 mm

120 m Delivery: 30 days
#33

Supply of 11 KV Line Material

Allunimum Jointing Sleev for ACSR Dog Conductor

27 no Delivery: 30 days
#34

Supply of 11 KV Line Material

Allunimum Binding wire 6 mm Dia

4 kg Delivery: 30 days
#35

Supply of 11 KV Line Material

F Bracket for Fitting top Insulator with Nut and Bolts

28 no Delivery: 30 days
#36

Supply of 11 KV Line Material

Cross Arm Holding Clamp with Nut and Bolts

28 no Delivery: 30 days
#37

Supply of LT Line Material

Suspension Clamp

99 no Delivery: 30 days
#38

Supply of LT Line Material

Dead End Clamp

47 no Delivery: 30 days
#39

Supply of LT Line Material

I Hook

146 no Delivery: 30 days
#40

Supply of LT Line Material

3 Ph Distribution Box Clamp

118 no Delivery: 30 days
#41

Supply of LT Line Material

PRC Connector

236 no Delivery: 30 days
#42

Supply of LT Line Material

LT Pin Clamp

140 no Delivery: 30 days
#43

Supply of LT Line Material

MS Angle for Cable Support

4 no Delivery: 30 days
#44

Supply of LT Line Material

Top Channle

4 no Delivery: 30 days
#45

Supply of LT Line Material

GI Pipe inch Dia

30 m Delivery: 30 days
#46

Supply of LT Line Material

HDPE Pipe 120 mm

125 m Delivery: 30 days
#47

Supply of LT Line Material

Clamp with Nut and Bolts for Top Channel

8 no Delivery: 30 days
#48

Supply of LT Line Material

Nut and Bolts with Washer

4 kg Delivery: 30 days
#49

Safe Carriage of 33 KV Line Material

Safe carriage of line material from store center Etah / nearest 33/11 KV S/S to direct pit site in distance range 0 to 60 Km. including loading and unloading at both side.

5 qtl Delivery: 30 days
#50

Safe Carriage of 13 M STP

Safe carriage of 13 Mtr Long ST pole from store center Etah / nearest 33/11 KV S/S to direct pit site in distance range 0 to 60 Km. including loading and unloading at both side.

22 no Delivery: 30 days
#51

Erection of 13 M STP Single Support

Erection of 13 mtr long STP as single support including fixing of HT/LT accessories etc complete, pole should be gruted properly as per DVVNL/Respo norms.

10 no Delivery: 30 days
#52

Erection of 13 M STP Try Pole

Erection of 13 mtr Long ST Pole as Try Pole including fixing of all HT/LT accessories etc. complete, pole should be grouted properly as per DVVNL/RESPO norms.

4 no Delivery: 30 days
#53

Laying ACSR Dog Conductor

Laying, sagging stringing, binding, jumpering & fixing of all accessories etc of ACSR Dog Conductor on the newly/old erected pole as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc required for proper completion of work.

1,484 m Delivery: 30 days
#54

Erection of Barbed Wire

Fixing of Barbed Wire GI

26 kg Delivery: 30 days
#55

Erection of F Bracket

Fixing of F Bracket with Nut & Bolts

22 no Delivery: 30 days
#56

Erection of Danger Board

Fixing of Danger Board with Clamp and Bolts

14 no Delivery: 30 days
#57

Erection of PG Clamp

PG Clamp

24 no Delivery: 30 days
#58

Erection of Holding Clamp

Fixing of Cross Arm Holding Clamp with Nut and Bolts

10 no Delivery: 30 days
#59

Erection of Earthing Complete

Erection of Earthing Complete

22 no Delivery: 30 days
#60

Erection of Allunimum Paint

Fixing of Allunimum Paint

18 l Delivery: 30 days
#61

Erection of Red Oxiode Paint

Fixing of Red Oxide Paint

18 l Delivery: 30 days
#62

Dismentalling of ST Pole etc

Dismentalling of ST Pole/Guarter & Rail Pole stacking of proper place.

2 no Delivery: 30 days
#63

Safe Carriage of Dismantilled ST Pole etc

Safe Carriage of Dismantiled ST Pole/Gattere & Rail Pole from the pit side to store in distance 0 to 60 km with loading and unloading at both ends proper stacking in store.

4 qtl Delivery: 30 days
#64

Safe Carriage of 11 KV Line Material

Safe carriage of line material from store center Etah / nearest 33/11 KV S/S to direct pit site in distance range 0 to 60 Km. including loading and unloading at both side.

25 qtl Delivery: 30 days
#65

Safe Carriage of 11 M STP

Safe carriage of 11 Mtr Long ST pole from store center Etah / nearest 33/11 KV S/S to direct pit site in distance range 0 to 60 Km. including loading and unloading at both side.

64 no Delivery: 30 days
#66

Safe Carriage of 11 KV XLPE

Safe carriage of 11 KV XLPE Cable 3x120 sq. mm from store center Etah / nearest 33/11 KV S/S to direct pit site in distance range 0 to 60 Km. including loading and unloading at both side.

180 m Delivery: 30 days
#67

Erection of 11 M STP Single Support

Erection of 11 mtr ST Pole as single support including fixing of all HT/LT accessories etc. complet, pole should be grouted properly as per DVVNL/RESPO norms.

40 no Delivery: 30 days
#68

Erection of 11 M STP Section Pole

Erection of 11 mtr Long ST Pole as Section Pole including fixing of all HT/LT accessories etc. complete. Pole should be grouted properly as per DVVNL/RESPO norms.

2 no Delivery: 30 days
#69

Erection of 11 M STP Double Pole

Erection of 11 mtr Long ST Pole as Double Pole including fixing of all HT/LT accessories etc. complete with TPMO, pole should be grouted properly as per DVVNL/RESPO norms.

10 no Delivery: 30 days
#70

Dismentalling old Dog Conductor

Dismentalling of old ACSR Dog/Rabbit Conductor stacking of proper place.

2,975 m Delivery: 30 days
#71

Laying ACSR Dog Conductor

Laying, sagging stringing, binding, jumpering & fixing of all accessories etc of ACSR Dog Conductor on the newly/old erected pole as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc required for proper completion of work.

4,079 m Delivery: 30 days
#72

Laying of XLPE Cable

Laying of XLPE Cable 3x120sq. mm on the newly/old erected pole as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc required for proper completion of work.

60 m Delivery: 30 days
#73

Fixing of HDPE Pipe with XLPE Cable

Fixing of HDPE Pipe 120 mm Dia for U/G laying of 11 KV XLPE Cable 3x120 sq mm with laid by HDD method including cable laying

120 m Delivery: 30 days
#74

Laying of GI Wire 8 SWG

Laying of GI Wire 8 SWG

272 kg Delivery: 30 days
#75

Laying of GI Wire 10 SWG

Laying of GI Wire 10 SWG

86 kg Delivery: 30 days
#76

Laying of LT Cable

Laying of LT Cable 1x120 sq. mm

40 m Delivery: 30 days
#77

Laying of LT Cable

Laying of LT Cable 1x400 sq. mm

40 m Delivery: 30 days
#78

Erection of Cable Jointing Kit Outdoor

Erection of 11 KV Cable Jointing Kit Outdoor for 3x120 sq. mm XLPE Cable

8 no Delivery: 30 days
#79

Loading and Unloading TF

Loading and Unloading 10/25/63/100/250/400 KVA TF with HT/LT Connection etc complete

10 no Delivery: 30 days
#80

Erection of Plinth 250 KVATF

Construction and installation of plinth of 250/400 Kva TF, complete in all respect.

3 no Delivery: 30 days
#81

Providing and Installation of Fancing

construction and installation of 6 feet height welded wire mech fancing 4M X 4M area, for 250/400 KVA TF, complete in all respect.

3 no Delivery: 30 days
#82

Erection of Pipe earthing

Pipe earthing up to water level of 250/400 KVA medium Power Transformers. All material shall be provided by the contractor.

3 no Delivery: 30 days
#83

Erection of Barbed Wire

Fixing of Barbed Wire

122 kg Delivery: 30 days
#84

Erection of F Bracket

Fixing of F Bracket for Fitting Top Insulator with Nut and Bolts

28 no Delivery: 30 days
#85

Erection of Danger Board

Fixing of Danger Board with Clamp and Bolts

48 no Delivery: 30 days
#86

Erection of PG Clamp

Fixing of PG Clamp

84 no Delivery: 30 days
#87

Erection of Holding Clamp

Fixing of Cross Arm Holding Clamp with Nut and Bolts

28 no Delivery: 30 days
#88

Erection of Number Plate

Fixing of Number Plate with Clamp and Bolts

32 no Delivery: 30 days
#89

Erection of Allunimum Paint

Fixing of Allunimum Paint

10 l Delivery: 30 days
#90

Erection of GI Pipe

Fixing of GI Pipe 6 inch Dia

48 m Delivery: 30 days
#91

Erection of Allunimum Binding Wire

Fixing of Allunimum Binding wire 6 mm Dia

4 kg Delivery: 30 days
#92

Erection of Earthing Complete

Erection of Earthing Complete

64 no Delivery: 30 days
#93

Erection of Stay Set Complete

Fixing of Stay set complete including the work of nozzling etc.

16 no Delivery: 30 days
#94

Dismentalling of ST Pole etc

Dismentalling of ST Pole/Guarter & Rail Pole stacking of proper place.

22 no Delivery: 30 days
#95

Safe Carriage of Dismantilled ST Pole etc

Safe Carriage of Dismantiled ST Pole/Gattere & Rail Pole from the pit side to store in distance 0 to 60 km with loading and unloading at both ends proper stacking in store.

35 qtl Delivery: 30 days
#96

Safe Carriage of LT Line Material

Safe carriage of line material from store center Etah / nearest 33/11 KV S/S to direct pit site in distance range 0 to 60 Km. including loading and unloading at both side.

3 qtl Delivery: 30 days
#97

Safe Carriage of 9 M STP

Safe carriage of 9 Mtr Long ST pole from store center Etah / nearest 33/11 KV S/S to direct pit site in distance range 0 to 60 Km. including loading and unloading at both side.

23 no Delivery: 30 days
#98

Safe Carriage of LT AB Cable

Safe carriage of LT AB cable 3x120 sq. mm from store center Etah / nearest 33/11 KV S/S to direct pit site in distance range 0 to 60 Km. including loading and unloading at both side.

3,707 m Delivery: 30 days
#99

Safe Carriage of LT XLPE Cable

Safe carriage of LT XLPE cable 3.5x150 sq. mm from store center Etah / nearest 33/11 KV S/S to direct pit site in distance range 0 to 60 Km. including loading and unloading at both side.

150 m Delivery: 30 days
#100

Erection of 9 M STP Single Support

Erection of 9 mtr ST Pole as single support including fixing of all HT/LT accessories etc. complet, pole should be grouted properly as per DVVNL/RESPO norms.

23 no Delivery: 30 days
#101

Laying of LT XLPE Cable

Laying of LT XLPE Cable 3.5x150sq. mm on the newly/old erected pole as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc required for proper completion of work.

25 m Delivery: 30 days
#102

Fixing of HDPE Pipe with XLPE Cable

Fixing of HDPE Pipe 120 mm Dia for U/G laying of 11 KV XLPE Cable 3.5x120 sq mm with laid by HDD method including cable laying

125 m Delivery: 30 days
#103

Dismentalling of LT AB Cable

Dismentalling of LT AB cable 3x95 sq. mm stacking of proper place.

1,613 m Delivery: 30 days
#104

Erection of LT AB Cable

Laying, sagging stringing, binding, jumpering & fixing of all accessories etc of LT AB cable 3x120 sq. mm on the newly/old erected pole as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc required for proper completion of work.

3,707 m Delivery: 30 days
#105

Erection of Distribution Box Clamp

Fixing of 3 Ph Distribution Box Clamp

59 no Delivery: 30 days
#106

Erection of Stay Set Complete

Fixing of Stay set complete including the work of nozzling etc.

2 no Delivery: 30 days
#107

Erection of Earthing Complete

Erection of Earthing Complete

23 no Delivery: 30 days
#108

Safe carriage of dismantilled Material

Safe carriage of dismantilled material (11 KV/33 KV/LT/Cross Arm/F Clamp/Top Channel/Dropper Channel/Conductor etc.) from the pit side to the store distance 0 to 60 Km. with loading & unloading at both ends and proper stacking in store.

40 qtl Delivery: 30 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for similar supply/erection works

4

Financial statements demonstrating financial standing

5

EMD documentation (₹39,000) complying with GeM terms

6

Technical bid documents and compliance statements

7

OEM authorization letters (if bidding as authorized distributor)

8

FDR or PBG arrangements and related endorsements

Frequently Asked Questions

Key insights about UTTAR PRADESH tender market

How to bid for 33 KV/11 KV line material tender in Etah Uttar Pradesh 2026?

Bidders must submit GST, PAN, experience proofs, financial statements, EMD ₹39,000, and ATC-compliant technical documents. The bid supports FDR or PBG as performance security and allows quantity variation up to 25%. Prepare OEM authorizations if acting as distributor and ensure dedicated service contact details.

What documents are required for Etah power line materials tender 2026?

Submit GST certificate, PAN, experience certificates for similar works, financial statements, EMD ₹39,000, technical bid and conformity statements, OEM authorizations, and if applicable, FDR receipt or PBG details. Ensure hard copy FDR delivered within 15 days of award.

What are the delivery terms for the Etah line material contract 2026?

Delivery starts from the last date of original delivery order. The purchaser may increase/decrease quantity by up to 25% and extend delivery time proportionally, with a minimum 30 days extension. Ensure readiness for on-site erection and safe carriage as specified.

Which performance security is acceptable for the Etah tender 2026?

Acceptable forms are PBG or Fixed Deposit Receipt (FDR) in favor of SE EDC Etah. The FDR must indicate withdrawal only on demand or with pledge sanction, and the bidder must deliver the original FDR within 15 days of award.

What scope of works is included in the Etah UP power tender 2026?

Scope includes supply of 33 KV/11 KV line materials, LT materials, safe carriage of multiple components, erection of 13 M/11 M STP poles, cable laying (XLPE, LT AB), GI wire installation, and painting/coatings; coordination with civil works as required.

What is the estimated value and EMD for the Etah tender 2026?

Estimated value is ₹3,900,000 with an EMD of ₹39,000. Bidders must submit the EMD along with the bid as per GeM terms, and ensure compliance with the option clause and delivery terms.

What service support is required from bidders for the Etah tender 2026?

Bidders must provide a dedicated toll-free service number and an escalation matrix for technical support, ensuring prompt response and issue resolution for on-site erection and material handling as per contract terms.