Hindustan Petroleum Corporation Ltd invites bids for the supply of UL-listed relay boards, prefabricated cables, and related components in Visakhapatnam, Andhra Pradesh. The scope mentions 9 items including 8CH RELAY BOARD, ULEP24D08 2C OB V2 UL, DIFI red/logic boards, and assorted UL cables. Estimated value and EMD are not disclosed; the order quantity may adjust by up to 25% during contract execution. GST considerations are bidder’s responsibility, and invoice must be raised in the consignee’s GSTIN. This procurement emphasizes factory-grade electronics with UL labeling and related accessories, targeting reliable supply for HPCL’s electrical panels and control systems.
Key Term 1: Option clause permits ±25% quantity variation during procurement and currency of contract
Key Term 2: GST payable by bidder; reimbursement based on actuals or lower applicable rate
Key Term 3: Invoicing must be in consignee GSTIN; scope limited to supply of Goods
GST-handling responsibility lies with bidder; payment terms not explicitly defined in data; follow ATC terms and standard HPCL supplier practices
Delivery time is adjustable under the option clause; additional time formula: (increased quantity / original quantity) × original delivery period with minimum 30 days
No explicit LD terms visible; ATC may define penalties, quality clauses, or performance bonds in the uploaded document
Experience in supplying UL-listed electrical boards and related cables
Ability to comply with GST and invoicing in consignee GSTIN
Financial capability to handle procurements with potential ±25% quantity adjustments
Quantity
129
Category
8CH RELAY BOARD,ULEP24D08 2C OB V2,UL
Bid Type
Two Packet Bid
Bid Validity
90 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
8CH RELAY BOARD,ULEP24D08 2C OB V2,UL , DI FI Board,UL16DIFI RED D25 VF CMPT,UL , DO FI Board,UL24D16DORED C D25 S7 V1,UL , Redundancy Relay Board,UL24D16DIRED2CD25 , Redundancy Relay Board, UL24D16DOREDCD25 , Prefab Cable 3mtr,CBL16DID25F1794IB16FO3 , Prefab Cable 4mtr,CBL16DID25F1794IB16FO4 , DO cable 4mtr, CBL16DOD25F1794OB16FO4 , Voltage mA Convertor,UL TX301 H,UL
Advisory Bank
ICICI
ePBG Percentage
5%
ePBG Duration (Months)
14
Payment Timelines
Payments shall be made to the Seller within 28 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
28
Delivery Locations
1
Delivery Cities
Visakhapatanam
Delivery Pincodes
530011
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Devaram Nitish Reddy | 530011,HPCL, Visakh Refinery, Refinery Warehouse, Malkapuram, Visakhapatnam - 530011 | Visakhapatanam | Andhra Pradesh | 530011 | 2 | 28 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
BOQ
BOQ
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Extended Deadline
02-Sep-2026, 9:30 am
Opening Date
02-Sep-2026, 10:00 am
Extended Deadline
26-Aug-2026, 9:30 am
Opening Date
26-Aug-2026, 10:00 am
Extended Deadline
19-Aug-2026, 9:30 am
Opening Date
19-Aug-2026, 10:00 am
8CH RELAY BOARD,ULEP24D08 2C OB V2,UL
As per Tender document and attachments
DI FI Board,UL16DIFI RED D25 VF CMPT,UL
As per Tender document and attachments
DO FI Board,UL24D16DORED C D25 S7 V1,UL
As per Tender document and attachments
Redundancy Relay Board,UL24D16DIRED2CD25
As per Tender document and attachments
Redundancy Relay Board, UL24D16DOREDCD25
As per Tender document and attachments
Prefab Cable 3mtr,CBL16DID25F1794IB16FO3
As per Tender document and attachments
Prefab Cable 4mtr,CBL16DID25F1794IB16FO4
As per Tender document and attachments
DO cable 4mtr, CBL16DOD25F1794OB16FO4
As per Tender document and attachments
Voltage mA Convertor,UL TX301 H,UL
As per Tender document and attachments
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | 8CH RELAY BOARD,ULEP24D08 2C OB V2,UL | As per Tender document and attachments | 2 | ea | vnmpatrudu | 28 | |
| 2 | DI FI Board,UL16DIFI RED D25 VF CMPT,UL | As per Tender document and attachments | 1 | ea | vnmpatrudu | 28 | |
| 3 | DO FI Board,UL24D16DORED C D25 S7 V1,UL | As per Tender document and attachments | 1 | ea | vnmpatrudu | 28 | |
| 4 | Redundancy Relay Board,UL24D16DIRED2CD25 | As per Tender document and attachments | 5 | ea | vnmpatrudu | 28 | |
| 5 | Redundancy Relay Board, UL24D16DOREDCD25 | As per Tender document and attachments | 4 | ea | vnmpatrudu | 28 | |
| 6 | Prefab Cable 3mtr,CBL16DID25F1794IB16FO3 | As per Tender document and attachments | 2 | ea | vnmpatrudu | 28 | |
| 7 | Prefab Cable 4mtr,CBL16DID25F1794IB16FO4 | As per Tender document and attachments | 2 | ea | vnmpatrudu | 28 | |
| 8 | DO cable 4mtr, CBL16DOD25F1794OB16FO4 | As per Tender document and attachments | 2 | ea | vnmpatrudu | 28 | |
| 9 | Voltage mA Convertor,UL TX301 H,UL | As per Tender document and attachments | 110 | ea | vnmpatrudu | 28 |
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for related electrical/electronic component supply
Financial statements (last 3 years preferred)
EMD submission document as per ATC
Technical bid documentation demonstrating compliance with UL-listed components
OEM authorization letters for listed components (where applicable)
Any additional documents specified in the ATC uploaded by buyer
Key insights about ANDHRA PRADESH tender market
Bidders must submit GST registration, PAN, and experience proofs for UL-listed electrical components. Include OEM authorizations for listed boards, financial statements, and technical bid. The ATC may specify EMD requirements and delivery commitments; ensure invoices align with consignee GSTIN and follow option-claused quantity adjustments.
Required documents include GST registration certificate, PAN, 3-year financial statements, experience certificates for UL component supply, OEM authorizations, technical bid, and EMD submission as per ATC. Invoices must be raised to the consignee GSTIN; ensure submission of UL-certified product data sheets.
Technical scope lists items like 8CH RELAY BOARD, ULEP24D08 2C OB V2 UL, DIFI boards, and related UL cables. Emphasize UL listing, and ensure compatibility with HPCL electrical panels. Quantities are not disclosed; bid must demonstrate supply readiness and UL compliance data sheets.
Delivery can extend by the option clause up to 25% of original quantity; additional time is calculated as (increased quantity / original quantity) × original delivery period, with a minimum of 30 days beyond the original schedule. Exact delivery dates are defined in the purchase order.
Bidder bears GST; reimbursement is per actuals or the lower applicable rate. Payment terms follow HPCL ATC; invoices must be raised in the consignee GSTIN. Specific payment milestones are defined in the final contract and ATC document.
Obtain OEM authorization letters for each UL-listed item listed in the BOQ. Submit these alongside technical bids to demonstrate manufacturing authority or valid distribution rights. OEM docs should correspond to 8CH RELAY BOARD and associated UL cables requested by HPCL.
Scope states 'Only supply of Goods' for 9 items; no installation or services. Ensure all listed UL components and cables comply with UL standards and supply is directly to HPCL Visakhapatnam site, with accompanying data sheets and testing certificates.
If quantity changes by up to 25%, the contracted rates remain fixed; delivery timelines adjust using the formula described, with the minimum extra time set to 30 days. Prepare pricing that can absorb modest fluctuations without affecting performance.