TenderDekho Logo
Active GEM

Government Tender Published for RMH0000700015P001,RMH0000700015P002,RMH0000700015P003,RMH0000700015P004,RMH0000700015P005,RMH000070 in KARIM NAGAR, TELANGANA

Bid Publish Date

23-Jul-2026, 2:57 pm

Bid End Date

13-Aug-2026, 3:00 pm

Value

₹2,24,721

Location

KARIMNAGAR , TELANGANA

Progress

Issue23-Jul-2026, 2:57 pm
AwardPending
Explore all 6 tabs to view complete tender details

Quantity

342

Category

RMH0000700015P073

Bid Type

Single Packet Bid

Categories 85

A tender has been published for Ramagundam Fertilizers And Chemicals Ltd RMH0000700015P001, RMH0000700015P002, RMH0000700015P003, RMH0000700015P004, RMH0000700015P005, RMH000070 in KARIM NAGAR, TELANGANA. Quantity: 342 by. Submission Deadline: 13-08-2026 15: 00: 00. Check eligibility and apply.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Payment Timelines

Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

60

Delivery Locations

1

Delivery Cities

Peddapalli

Delivery Pincodes

505210

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Ritesh Kumar Thakur505210,Ramagundam Fertilizers , RFCL Fertilizers City, RFCL Plant, Ramagundam, Peddapalli, TelanganaPeddapalliTelangana505210260-

Authority Records

MINISTRY OF CHEMICALS AND FERTILIZERSFERTILIZERS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9621315.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 125 Items Sign in for GEM prices

#1

RMH0000700015P001

Fuel filter asmbly as per Technical Specs and ATC Docs

2 pieces Delivery: 60 days
#2

RMH0000700015P002

Filter Element as per Technical Specs and ATC Docs

6 pieces Delivery: 60 days
#3

RMH0000700015P003

Sealing Ring as per Technical Specs and ATC Docs

8 pieces Delivery: 60 days
#4

RMH0000700015P004

Centre bolt for housing as per Technical Specs and ATC Docs

4 pieces Delivery: 60 days
#5

RMH0000700015P005

Copper washer for centre bolt as per Technical Specs and ATC Docs

4 pieces Delivery: 60 days
#6

RMH0000700015P006

Air vent screw as per Technical Specs and ATC Docs

4 pieces Delivery: 60 days
#7

RMH0000700015P007

Copper washer as per Technical Specs and ATC Docs

4 pieces Delivery: 60 days
#8

RMH0000700015P008

Fuel pipe as per Technical Specs and ATC Docs

2 pieces Delivery: 60 days
#9

RMH0000700015P009

Water seperator as per Technical Specs and ATC Docs

2 pieces Delivery: 60 days
#10

RMH0000700015P010

Hex hd screw as per Technical Specs and ATC Docs

4 pieces Delivery: 60 days
#11

RMH0000700015P011

Machined Washer as per Technical Specs and ATC Docs

4 pieces Delivery: 60 days
#12

RMH0000700015P012

Fuel pipe as per Technical Specs and ATC Docs

2 pieces Delivery: 60 days
#13

RMH0000700015P013

Set Screw as per Technical Specs and ATC Docs

4 pieces Delivery: 60 days
#14

RMH0000700015P014

Plain washer as per Technical Specs and ATC Docs

4 pieces Delivery: 60 days
#15

RMH0000700015P015

Fuel pipe as per Technical Specs and ATC Docs

3 pieces Delivery: 60 days
#16

RMH0000700015P016

Copper Washer as per Technical Specs and ATC Docs

12 pieces Delivery: 60 days
#17

RMH0000700015P017

Aluminium Washer as per Technical Specs and ATC Docs

8 pieces Delivery: 60 days
#18

RMH0000700015P018

Banjo Bolt as per Technical Specs and ATC Docs

10 pieces Delivery: 60 days
#19

RMH0000700015P019

Sensor unit water temp as per Technical Specs and ATC Docs

2 pieces Delivery: 60 days
#20

RMH0000700015P020

Sealing ring for bowl as per Technical Specs and ATC Docs

2 pieces Delivery: 60 days
#21

RMH0000700015P021

Set screw M6x10 as per Technical Specs and ATC Docs

4 pieces Delivery: 60 days
#22

RMH0000700015P022

Filter flange as per Technical Specs and ATC Docs

2 pieces Delivery: 60 days
#23

RMH0000700015P023

Sealing ring as per Technical Specs and ATC Docs

2 pieces Delivery: 60 days
#24

RMH0000700015P024

Relief valve assy as per Technical Specs and ATC Docs

2 pieces Delivery: 60 days
#25

RMH0000700015P025

Rubber washer as per Technical Specs and ATC Docs

2 pieces Delivery: 60 days
#26

RMH0000700015P026

Adaptor for Filter as per Technical Specs and ATC Docs

2 pieces Delivery: 60 days
#27

RMH0000700015P027

Lub. oil filter assembly as per Technical Specs and ATC Docs

2 pieces Delivery: 60 days
#28

RMH0000700015P028

Rubber Pad as per Technical Specs and ATC Docs

4 pieces Delivery: 60 days
#29

RMH0000700015P029

Washer as per Technical Specs and ATC Docs

2 pieces Delivery: 60 days
#30

RMH0000700015P030

Rubber Pad as per Technical Specs and ATC Docs

2 pieces Delivery: 60 days
#31

RMH0000700015P031

Metal Pad Round as per Technical Specs and ATC Docs

2 pieces Delivery: 60 days
#32

RMH0000700015P032

Nyloc Nut M10 as per Technical Specs and ATC Docs

2 pieces Delivery: 60 days
#33

RMH0000700015P033

Hose worm clip as per Technical Specs and ATC Docs

3 pieces Delivery: 60 days
#34

RMH0000700015P034

Hose worm clip as per Technical Specs and ATC Docs

2 pieces Delivery: 60 days
#35

RMH0000700015P035

Hose pipe as per Technical Specs and ATC Docs

1 pieces Delivery: 60 days
#36

RMH0000700015P036

Plastic Fan as per Technical Specs and ATC Docs

1 pieces Delivery: 60 days
#37

RMH0000700015P037

Machined Washer M6 as per Technical Specs and ATC Docs

3 pieces Delivery: 60 days
#38

RMH0000700015P038

Hose worm clip as per Technical Specs and ATC Docs

2 pieces Delivery: 60 days
#39

RMH0000700015P039

Hose Upper as per Technical Specs and ATC Docs

1 pieces Delivery: 60 days
#40

RMH0000700015P040

Cap Assy as per Technical Specs and ATC Docs

1 pieces Delivery: 60 days
#41

RMH0000700015P041

Air Filter Element as per Technical Specs and ATC Docs

2 pieces Delivery: 60 days
#42

RMH0000700015P042

Rubber Ring as per Technical Specs and ATC Docs

2 pieces Delivery: 60 days
#43

RMH0000700015P043

Rubber Ring as per Technical Specs and ATC Docs

1 pieces Delivery: 60 days
#44

RMH0000700015P044

Hose clip as per Technical Specs and ATC Docs

2 pieces Delivery: 60 days
#45

RMH0000700015P045

Hose pipe as per Technical Specs and ATC Docs

2 pieces Delivery: 60 days
#46

RMH0000700015P046

Head Lamp Assy as per Technical Specs and ATC Docs

2 pieces Delivery: 60 days
#47

RMH0000700015P047

Transmitter as per Technical Specs and ATC Docs

1 pieces Delivery: 60 days
#48

RMH0000700015P048

Hex. Nut M6 as per Technical Specs and ATC Docs

8 pieces Delivery: 60 days
#49

RMH0000700015P049

Multi Tooth Lock Washer M6 as per Technical Specs and ATC Docs

5 pieces Delivery: 60 days
#50

RMH0000700015P050

Cup washer as per Technical Specs and ATC Docs

4 pieces Delivery: 60 days
#51

RMH0000700015P051

Slotted CSK Head Screw M4X10 as per Technical Specs and ATC Docs

4 pieces Delivery: 60 days
#52

RMH0000700015P052

Fuse Box as per Technical Specs and ATC Docs

1 pieces Delivery: 60 days
#53

RMH0000700015P053

Brake light switch as per Technical Specs and ATC Docs

2 pieces Delivery: 60 days
#54

RMH0000700015P054

Socket Assembly Trailer as per Technical Specs and ATC Docs

1 pieces Delivery: 60 days
#55

RMH0000700015P055

Hex. Nut M8 as per Technical Specs and ATC Docs

2 pieces Delivery: 60 days
#56

RMH0000700015P056

Hazard Switch Assy as per Technical Specs and ATC Docs

2 pieces Delivery: 60 days
#57

RMH0000700015P057

Flasher Unit Assy as per Technical Specs and ATC Docs

3 pieces Delivery: 60 days
#58

RMH0000700015P058

Indicator Switch Assy as per Technical Specs and ATC Docs

2 pieces Delivery: 60 days
#59

RMH0000700015P059

Light Switch Assy as per Technical Specs and ATC Docs

2 pieces Delivery: 60 days
#60

RMH0000700015P060

Ammeter as per Technical Specs and ATC Docs

1 pieces Delivery: 60 days
#61

RMH0000700015P061

Multi Tooth Lock Washer M8 as per Technical Specs and ATC Docs

1 pieces Delivery: 60 days
#62

RMH0000700015P062

Spring Washer M8 as per Technical Specs and ATC Docs

3 pieces Delivery: 60 days
#63

RMH0000700015P063

Horn Assy as per Technical Specs and ATC Docs

1 pieces Delivery: 60 days
#64

RMH0000700015P064

Meter Bulb as per Technical Specs and ATC Docs

7 pieces Delivery: 60 days
#65

RMH0000700015P065

Electrical Temperature gauge as per Technical Specs and ATC Docs

1 pieces Delivery: 60 days
#66

RMH0000700015P066

Electrical Temperature gauge as per Technical Specs and ATC Docs

1 pieces Delivery: 60 days
#67

RMH0000700015P067

Oil pressure indicator as per Technical Specs and ATC Docs

1 pieces Delivery: 60 days
#68

RMH0000700015P068

Oil pressure indicator as per Technical Specs and ATC Docs

1 pieces Delivery: 60 days
#69

RMH0000700015P069

Oil pressure switch as per Technical Specs and ATC Docs

1 pieces Delivery: 60 days
#70

RMH0000700015P070

Oil pressure switch as per Technical Specs and ATC Docs

1 pieces Delivery: 60 days
#71

RMH0000700015P071

Bonded Washer as per Technical Specs and ATC Docs

1 pieces Delivery: 60 days
#72

RMH0000700015P072

Neutral safety as per Technical Specs and ATC Docs

1 pieces Delivery: 60 days
#73

RMH0000700015P073

Battery as per Technical Specs and ATC Docs

1 pieces Delivery: 60 days
#74

RMH0000700015P074

Hour meter as per Technical Specs and ATC Docs

1 pieces Delivery: 60 days
#75

RMH0000700015P075

Hour meter as per Technical Specs and ATC Docs

1 pieces Delivery: 60 days
#76

RMH0000700015P076

Fuel Gauge as per Technical Specs and ATC Docs

1 pieces Delivery: 60 days
#77

RMH0000700015P077

Plough Lamp Assy as per Technical Specs and ATC Docs

1 pieces Delivery: 60 days
#78

RMH0000700015P078

Bulb as per Technical Specs and ATC Docs

1 pieces Delivery: 60 days
#79

RMH0000700015P079

Coller head screw as per Technical Specs and ATC Docs

2 pieces Delivery: 60 days
#80

RMH0000700015P080

Start Switch Assy as per Technical Specs and ATC Docs

1 pieces Delivery: 60 days
#81

RMH0000700015P081

Key Start Switch as per Technical Specs and ATC Docs

1 pieces Delivery: 60 days
#82

RMH0000700015P082

Parking light L as per Technical Specs and ATC Docs

1 pieces Delivery: 60 days
#83

RMH0000700015P083

Parking light R as per Technical Specs and ATC Docs

1 pieces Delivery: 60 days
#84

RMH0000700015P084

Tail light L as per Technical Specs and ATC Docs

1 pieces Delivery: 60 days
#85

RMH0000700015P085

Tail light R as per Technical Specs and ATC Docs

1 pieces Delivery: 60 days
#86

RMH0000700015P086

Starter Motor as per Technical Specs and ATC Docs

1 pieces Delivery: 60 days
#87

RMH0000700015P087

Solenoid Switch as per Technical Specs and ATC Docs

1 pieces Delivery: 60 days
#88

RMH0000700015P088

Alternator Assy as per Technical Specs and ATC Docs

1 pieces Delivery: 60 days
#89

RMH0000700015P089

Fan as per Technical Specs and ATC Docs

1 pieces Delivery: 60 days
#90

RMH0000700015P090

V Belt as per Technical Specs and ATC Docs

1 pieces Delivery: 60 days
#91

RMH0000700015P091

Oil seal as per Technical Specs and ATC Docs

4 pieces Delivery: 60 days
#92

RMH0000700015P092

O ring as per Technical Specs and ATC Docs

2 pieces Delivery: 60 days
#93

RMH0000700015P093

Shim as per Technical Specs and ATC Docs

4 pieces Delivery: 60 days
#94

RMH0000700015P094

Copper washer as per Technical Specs and ATC Docs

10 pieces Delivery: 60 days
#95

RMH0000700015P095

Hex. Head Screw as per Technical Specs and ATC Docs

10 pieces Delivery: 60 days
#96

RMH0000700015P096

O-ring as per Technical Specs and ATC Docs

2 pieces Delivery: 60 days
#97

RMH0000700015P097

Copper washer as per Technical Specs and ATC Docs

2 pieces Delivery: 60 days
#98

RMH0000700015P098

Steel disc as per Technical Specs and ATC Docs

6 pieces Delivery: 60 days
#99

RMH0000700015P099

Brake liner as per Technical Specs and ATC Docs

8 pieces Delivery: 60 days
#100

RMH0000700015P100

Brake actuator assy as per Technical Specs and ATC Docs

2 pieces Delivery: 60 days
#101

RMH0000700015P101

Brake link as per Technical Specs and ATC Docs

4 pieces Delivery: 60 days
#102

RMH0000700015P102

Brake spring as per Technical Specs and ATC Docs

6 pieces Delivery: 60 days
#103

RMH0000700015P103

Tie rod assy as per Technical Specs and ATC Docs

2 pieces Delivery: 60 days
#104

RMH0000700015P104

Banjo Bolt as per Technical Specs and ATC Docs

6 pieces Delivery: 60 days
#105

RMH0000700015P105

Banjo Bolt as per Technical Specs and ATC Docs

1 pieces Delivery: 60 days
#106

RMH0000700015P106

Banjo Bolt as per Technical Specs and ATC Docs

1 pieces Delivery: 60 days
#107

RMH0000700015P107

Aluminium Washer as per Technical Specs and ATC Docs

14 pieces Delivery: 60 days
#108

RMH0000700015P108

Brake pipe Lt as per Technical Specs and ATC Docs

1 pieces Delivery: 60 days
#109

RMH0000700015P109

Brake pipe Rt as per Technical Specs and ATC Docs

1 pieces Delivery: 60 days
#110

RMH0000700015P110

Rubber boot as per Technical Specs and ATC Docs

2 pieces Delivery: 60 days
#111

RMH0000700015P111

Dust cap as per Technical Specs and ATC Docs

2 pieces Delivery: 60 days
#112

RMH0000700015P112

Adjustable nut as per Technical Specs and ATC Docs

2 pieces Delivery: 60 days
#113

RMH0000700015P113

Split Cotter Pin 2X18 as per Technical Specs and ATC Docs

6 pieces Delivery: 60 days
#114

RMH0000700015P114

HYDROLIC PIPE as per Technical Specs and ATC Docs

3 pieces Delivery: 60 days
#115

RMH0000700015P115

CLUTCH PLATE as per Technical Specs and ATC Docs

1 pieces Delivery: 60 days
#116

RMH0000700015P116

PRESSURE PLATE as per Technical Specs and ATC Docs

1 pieces Delivery: 60 days
#117

RMH0000700015P117

HANDEL BONUT LOCK as per Technical Specs and ATC Docs

4 pieces Delivery: 60 days
#118

RMH0000700015P118

FRONT HUB BEARING as per Technical Specs and ATC Docs

2 pieces Delivery: 60 days
#119

RMH0000700015P119

REARE HUB BEARING as per Technical Specs and ATC Docs

2 pieces Delivery: 60 days
#120

RMH0000700015P120

TROLY HUB BEARING as per Technical Specs and ATC Docs

2 pieces Delivery: 60 days
#121

RMH0000700015P121

ENG. STOPER CABLINKROD as per Technical Specs and ATC Docs

1 pieces Delivery: 60 days
#122

RMH0000700015P122

ROAD SPRING (LEFE) PATI CENTER VOL as per Technical Specs and ATC Docs

2 pieces Delivery: 60 days
#123

RMH0000700015P123

AIR FILTER TOP PIPE INLATE COVER as per Technical Specs and ATC Docs

2 pieces Delivery: 60 days
#124

RMH0000700015P124

TIE ROD END as per Technical Specs and ATC Docs

2 pieces Delivery: 60 days
#125

RMH0000700015P125

FUEL TANK LEAD as per Technical Specs and ATC Docs

1 pieces Delivery: 60 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Certificate (Requested in ATC)

2

OEM Authorization Certificate

3

Additional Doc 1 (Requested in ATC)

4

Additional Doc 2 (Requested in ATC)

5

Additional Doc 3 (Requested in ATC)

6

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

7

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer