Indian Army CCTV Camera Repair and Overhauling Tender Pathankot Punjab 2026 CP PLUS
Indian Army
Pathankot, PUNJAB
Bid Publish Date
07-Jan-2026, 3:34 pm
Bid End Date
17-Jan-2026, 4:00 pm
Location
Progress
Quantity
1
Bid Type
Two Packet Bid
The Indian Army, Department Of Military Affairs, is seeking procurement of FPV/VR goggles with UHF receiver and camera system. The scope is limited to the supply of Goods, with an emphasis on design finalization post contract award. The tender introduces an option clause allowing quantity adjustments up to 25% during and after the contract period, influencing delivery planning and pricing. Turnover criteria require demonstrated financial stability for both the bidder and OEM over the last three years. This opportunity targets manufacturers capable of delivering integrated goggles with wireless signaling and imaging components, aligned to buyer-approved specifications. The bid emphasizes adherence to delivery timelines and the flexibility to scale orders in line with operational demand, without shifting the contract’s core pricing. Unique aspects include the requirement for Detailed Design Drawings approval before fabrication and the possibility of re-baselining delivery if approval is delayed.
FPV/ VR goggles with UHF receiver and camera system
Scope: supply of goods only
Delivery period adjustable under option clause (minimum 30 days)
Detailed Design Drawings to be approved within 10 days of award
Bidder and OEM turnover: last 3 years, audited or CA-certified
Option clause allows +/- 25% quantity adjustment at contract time and during currency
Detailed Design Drawings approval required within 10 days; delay may adjust delivery without LD
Turnover criteria: bidder and OEM must meet specified average annual turnover over 3 years
Not specified in provided data; bidders should prepare to align with standard government payment practices following delivery and acceptance.
Delivery period begins after approved drawings; option clause allows extension proportionate to quantity changes with minimum 30 days.
Not specified in data; bidders should assume standard LD terms apply for late delivery post drawing approval.
Minimum average annual turnover for bidder in last 3 years must meet specified threshold
OEM turnover on offered product must meet specified threshold
Experience in supplying FPV/VR goggles or similar military-grade imaging gear
Indian Army
Pathankot, PUNJAB
Personnel Information And Management System Central Public Works Department
CENTRAL DELHI, DELHI
Ex-servicemen Contributory Health Scheme (echs)
PANCHKULA, HARYANA
Indian Army
TINSUKIA, ASSAM
Ahmednagar District Panchayats
AHMEDNAGAR, MAHARASHTRA
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST registration
PAN card
Audited financial statements for last 3 years or CA certificate indicating turnover
OEM authorization or manufacturer credentials
Technical bid documents and detailed design drawings (within 10 days of award)
Any existing ISI/ISO certifications or equipment compliance documents (if applicable)
Experience certificates for similar FPV/VR or UAV equipment supply (if required)
Key insights about ARUNACHAL PRADESH tender market
Bidders must meet turnover criteria for both bidder and OEM, provide GST/PAN, and submit audited financials for the last 3 years. Include OEM authorization and technical drawings within 10 days of award. Ensure supply scope covers only goods and adheres to the option clause.
Required submissions include GST registration, PAN, audited financial statements or CA certificate, OEM authorization, technical bid, and Detailed Design Drawings within 10 days of award. Also provide experience certificates for similar equipment and any compliance certificates.
Delivery is governed by the option clause permitting up to 25% quantity changes at contract time and during currency, with minimum 30 days additional time. Delivery starts after Detailed Design Drawings approval by the buyer.
Successful bidder must submit Detailed Design Drawings within 10 days of award. The buyer will approve or list required modifications within 10 days; delays may adjust delivery without liquidation damages, contingent on buyer approvals.
Bidder and OEM must demonstrate minimum average annual turnover over the last 3 years ending 31 March of the previous year, via audited balance sheets or CA certificates; if the bidder is newly formed, turnover is computed on completed years after incorporation.
Exact penalties are not specified in the data; expect standard LD terms post-drawing approval. If buyer delays drawing approval, delivery period may be refixed without LD, emphasizing timely design approvals to avoid schedule slippage.
Yes, the scope is limited to the supply of Goods; no installation or aftersales service is explicitly required. Ensure all components, including UHF receiver and camera system, are delivered as a complete package meeting approved drawings.
N/a
📍 BHOPAL, MADHYA PRADESH
Central Institute Of Plastics Engineering And Technology (cipet)
📍 KRISHNA, ANDHRA PRADESH
Office Of Dg (mss)
Software Technology Parks Of India (stpi)
📍 CHENNAI, TAMIL NADU
National Forensic Sciences University
📍 DHARWARD, KARNATAKA
Sign up now to access all documents
Main Document
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS