Bid Publish Date
30-Jul-2026, 12:43 pm
Bid End Date
03-Aug-2026, 1:00 pm
Progress
Quantity
3
Bid Type
Two Packet Bid
The prospective procurement is issued by the Central Water Commission for Split Air Conditioners, Wall Mount Type (ISI Marked to IS 1391 Part 2), categorized under Q2. The scope explicitly includes Supply, Installation, Testing and Commissioning of the cooling units. The contract contemplates a flexible quantity approach, with an option to increase up to 25% of bid quantity during and after award, at the contracted rates. The delivery timeline aligns with original orders, with potential extensions calculated as a function of increased quantity, ensuring a minimum extension period of 30 days. The ATC terms are embedded in the buyer-added terms, and an ATC document is referenced for bidder compliance. This tender emphasizes compliance with ISI marking and IS 1391 Part 2 standards for wall-mounted split AC units and includes an ATC-based scope adjustments. The absence of BOQ items suggests a framed procurement scope rather than itemized quantities. The opportunity requires bidders to conform to the specified ISI standard and to deliver complete SITC services.
Wall mount split air conditioner units
ISI Marked to IS 1391 Part 2
Scope: Supply, Installation, Testing and Commissioning
Option clause: +25% quantity, adjust delivery as described
Minimum extension period: 30 days
ATC terms document governs additional conditions
No BOQ items in tender data
Option clause allows quantity increase up to 25% at contracted rates
Delivery extensions depend on increased quantity and original delivery period
Scope includes SITC, with ISI IS 1391 Part 2 compliance
Details not explicitly provided; ATC to specify milestone-based payment or LC terms
Delivery begins from the last date of original delivery order; extended delivery time calculated per option clause with minimum 30 days
Not specified in data; refer to ATC document for LD and penalties
Must comply with ISI marking requirements and IS 1391 Part 2
Experience in SITC of wall-mounted split AC systems
Financial robustness as per bidder documentation (audited statements)
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Split Air Conditioner, Wall Mount Type (V3) ISI Marked to IS 1391 (Part 2) (Q2)
Pre-Bid Date
01-08-2026 12:00:00
Pre-Bid Venue
O/o EE DD CWC Asansol
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
Paschim Bardhaman
Delivery Pincodes
713302
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Nishant Kumar | 713302,DAMODAR DIVISION, CENTRAL WATER COMMISSION, KALYANPUR ASANSOL | Paschim Bardhaman | West Bengal | 713302 | 3 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST certificate
PAN card
Experience certificates
Financial statements
EMD documents (as per ATC)
Technical bid documents
OEM authorizations (if required by ATC)
ISI Mark Certification proof (IS 1391 Part 2 compliance)
Any other bidder compliance certificates specified in ATC
Bidders should submit GST, PAN, experience certificates, financials, EMD per ATC, technical bid, and OEM authorizations. Ensure IS 1391 Part 2 conformity and ISI certification. The scope includes Supply, Installation, Testing and Commissioning, with a 25% quantity option during contract.
Required documents include GST registration, PAN, company financial statements, experience certificates for SITC of ACs, EMD copy per ATC, technical compliance certificates, OEM authorization, and ISI/IS 1391 Part 2 proof. Prepare bid price covering SITC components.
Units must be ISI marked and comply with IS 1391 Part 2 for wall-mounted split air conditioners. Submit ISI certificate and IS 1391 Part 2 compliance data from the OEM. Ensure testing and commissioning manuals conform to those standards.
Delivery starts from the last date of the original delivery order. If the option clause is invoked, extended delivery time is calculated as (increased quantity/original quantity) × original delivery period, with a minimum extension of 30 days.
The scope includes Supply, Installation, Testing and Commissioning of wall-mounted split air conditioners. OEM support, on-site testing, and final acceptance may be required as per ATC terms. Ensure installation meets space and electrical load specifications.
Eligibility requires ISO/ISI compliance where applicable, demonstrated experience in SITC of similar ACs, financial stability evidenced by audits, and compliance with ATC terms. Ensure bid includes OEM authorization and relevant warranties as per ATC.
The purchaser may increase/decrease quantity up to 25% of bid/contract quantity. Adjustments apply at contracted rates, with extension calculations based on the original delivery period and minimum 30 days extension when applicable.
Sign up now to access all documents
Main Document
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS