GEM

Contract Bidding Open For Industrial Data Logger,Industrial Data Logger with IoT starter Kit,Boost converter MP 1584,Driver f

Bid Publish Date

09-Jan-2026, 3:23 pm

Bid End Date

30-Jan-2026, 4:00 pm

Value

₹4,00,000

Progress

Issue09-Jan-2026, 3:23 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

148

Category

Industrial Data Logger

Bid Type

Two Packet Bid

Public procurement opportunity for National Innovation Foundation Industrial Data Logger, Industrial Data Logger with IoT starter Kit, Boost converter MP 1584, Driver for NEMA 122kg cm stepper motor DM860H, Absolute Encoder, Shaft Type Absolute Rotary Encoder, Capacitive Proximity Sensor, DC Motor PWM Speed Control Switch Governor, PWM Motor Speed Regulator Controller Switch, Linear Actuator, Adjustable DC Power Supply, Switching Power supply, SMPS power supply. Quantity: 148 issued by. Submission Deadline: 30-01-2026 16: 00: 00. View full details and respond.

Past Similar Tenders (Historical Results)

5 found

LAN trainer kit,Repeater,Router,LAN card,Connecting cables and connectors Different cables,Null Mod

Science And Technology Department

PURNIA, BIHAR

Posted: 13 August 2025
Closed: 28 August 2025
GEM

8085 Training kit,8051 Training Kit,Scanning Techniques illustrating,Stepper Motor and 12 V DC Moto

Science And Technology Department

BEGUSARAI, BIHAR

Posted: 28 July 2025
Closed: 21 August 2025
GEM

Raspberry Pi 4 Model B 8 GB starter kit,RASPBERRY PI ZERO WH V2,OV5647 5MP 1080P IR Cut Camera,Rasp

Centre For Development Of Advanced Computing (c-dac)

CHENNAI, TAMIL NADU

Posted: 11 June 2025
Closed: 2 July 2025
GEM

Data logger,Precipitation Sensor,Snow Depth Sensor,Air Temperature Sensor,Relative Humidity Sensor,

University Of Kashmir

SRINAGAR, JAMMU & KASHMIR

Posted: 25 February 2025
Closed: 17 March 2025
GEM

Raspberry Pi 4 Model B 8 GB starter kit,RASPBERRY-PI ZERO WH V2,OV5647 5MP 1080P IR-Cut Camera,Wave

Centre For Development Of Advanced Computing (c-dac)

CHENNAI, TAMIL NADU

Posted: 18 December 2024
Closed: 8 January 2025
GEM

Bill of Quantities (BOQ) 14 Items

Item # Title Description Quantity Unit Consignee Delivery (Days)
1 Industrial Data Logger RDL 838i kit and specifications as per sheet 1 pieces nifconsignee2 15
2 Industrial Data Logger with IoT starter Kit specifications as per the sheet 1 pieces nifconsignee2 15
3 Boost converter MP 1584 Input Voltage range from 4.5 to 28V and Output Voltage range from 0.8 to 20V 50 pieces nifconsignee2 15
4 Driver for NEMA 122kg cm stepper motor DM860H Input voltage range from 24V to 110VDC and Current range from 2.4 A to 7.2 A 10 pieces nifconsignee2 15
5 Absolute Encoder AS5600 Absolute Encoder 12 Bit Precision Angle Measurement Sensor with Magnet Wheel 10 pieces nifconsignee2 15
6 Shaft Type Absolute Rotary Encoder 360 Pulses Per Revolutionand Shaft Type and shaft diameter 8mm and rated power supply range 12V to 24V and NPN Open Collector Output 10 pieces nifconsignee2 15
7 Capacitive Proximity Sensor PNP and Normally open and 5 mm detection distance 10 pieces nifconsignee2 15
8 Capacitive Proximity Sensor PNP and 10 mm detection distance 10 pieces nifconsignee2 15
9 DC Motor PWM Speed Control Switch Governor Voltage range from DC 12V to 40 V and current 10A 20 pieces nifconsignee2 15
10 PWM Motor Speed Regulator Controller Switch Voltage range from DC 10V to 60V and current 20A 10 pieces nifconsignee2 15
11 Linear Actuator 24 VDC and stroke length 250mm and force 6000N and speed 4mm per second 4 pieces nifconsignee2 15
12 Adjustable DC Power Supply DC output voltage range 0 to 60 V and DC current range 0 to 10 A and power 600W or more 2 pieces nifconsignee2 15
13 Switching Power supply Output power 60V 10A 600W and Input voltage AC 220V 5 pieces nifconsignee2 15
14 SMPS power supply Input power AC supply and Output 60V and 10A and 600W 5 pieces nifconsignee2 15

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Certificate (Requested in ATC)

3

OEM Authorization Certificate

4

Additional Doc 1 (Requested in ATC)

5

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

6

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Explore More Opportunities

Quick Access