Progress
RAIndian Army announces a tender for Portable Emergency LED Lighting Tower System with AC Generator Set (Q3) in GURDASPUR, PUNJAB. Quantity: 5. Submission Deadline: 17-08-2026 14: 00: 00. Last date to apply is approaching fast!
These are the final prices after the reverse auction event. Prices may be lower than initial bids.
| Rank | Seller | Final Price | Item |
|---|---|---|---|
| L1 | PREMANAND ENTERPRISES(MII) Under PMA Winner | ₹7,16,500 | Item Categories : Portable Emergency LED Lighting Tower System with AC Generator Set |
| L2 | M/S ARISE CONSTRUCTION EQUIPMENTS (MSE,MII) Under PMA | ₹7,17,250 | Item Categories : Portable Emergency LED Lighting Tower System with AC Generator Set |
| L3 | BHARDWAJ TRADERS (MII) Under PMA | ₹8,90,000 | Item Categories : Portable Emergency LED Lighting Tower System with AC Generator Set |
🎉 L1 Winner
PREMANAND ENTERPRISES(MII) Under PMA
Final Price: ₹7,16,500
Start
26-Sep-2026, 12:00 pm
End
28-Sep-2026, 12:00 pm
Duration: 48 hours
Reverse Auction Document
✅ RA concluded. Check financial results for final rankings.
Quantity
5
Bid Type
Two Packet Bid
Bid Validity
90 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
50% Lowest Priced Technically Qualified Bidders
Tech Clarification Time
3 Days
EMD Required
Yes
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
Bid Splitting Applied
No
Min. Avg. Annual Turnover
2
OEM Avg. Turnover
2
Past Performance
20 %
Experience Required
1 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Portable Emergency LED Lighting Tower System with AC Generator Set (Q3)
Advisory Bank
State Bank of India
ePBG Percentage
3%
ePBG Duration (Months)
12
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
Gurdaspur
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Gurdaspur | Gurdaspur | - | - | 5 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
CATALOG Specification
GEM_GENERAL_TERMS_AND_CONDITIONS
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover
Additional Doc 1 (Requested in ATC)
Additional Doc 2 (Requested in ATC)
Additional Doc 3 (Requested in ATC)
Additional Doc 4 (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
| Category | Specification | Requirement |
|---|---|---|
| GENERIC | Minimum Operating Time (in Hours) | 8 hours |
| GENERATOR SET CONSTRUCTION | Minimum Generator Set Rating | 1.0 KVA |
| GENERATOR SET CONSTRUCTION | Number of Cylinders in Engine | 1 Cylinder |
| GENERATOR SET CONSTRUCTION | Fuel Type | Petrol |
| GENERATOR SET CONSTRUCTION | Minimum Generator Set Fuel Tank Capacity | 5 litres |
| GENERATOR SET CONSTRUCTION | Mounting Type | With trolley |
| TOWER CONSTRUCTION | Material of Mast | Mild steel |
| TOWER CONSTRUCTION | Minimum Height of Telescopic/Collapsible/Vertical Mast with Light Source (Measured from Ground Level) (in meter) | 5 |
| TOWER CONSTRUCTION | Minimum Wall Thickness of Telescopic/Collapsible/Vertical Mast | 5 mm, >5 mm |
| LED LUMINAIRE CONSTRUCTION | Minimum System Light Output (in Lumens) | 60000 |
| LED LUMINAIRE CONSTRUCTION | Ingress Protection Rating of Luminaire | IP66 |