Indian Army Procurement of Change Over Switch, Voltage Regulator, Motor Capacitor, Fuel Pump, Coupling, Piston Tender PoK 2025
Indian Army
POONCH, JAMMU & KASHMIR
Progress
Quantity
8
Category
Automatic Voltage Regulator
Bid Type
Two Packet Bid
The Indian Army, Department of Military Affairs, invites bids for multiple electrical components including Automatic Voltage Regulator (AVR), Rectifier Bracket, Capacitor, Fuse, Oil Pressure Pipe, Switch Push, and Regulator. Estimated value is around ₹20,000.00 with a potential 25% quantity variation under the option clause. The contract allows bulk quantities at contracted rates and delivery timing linked to the last delivery order date, with a minimum extension window of 30 days. A two-stage process includes advance sample submission within 7 days of award and preliminary approvals or modifications before bulk supply. The tender emphasizes conformity to approved samples and provides guidelines for sample-based rework if needed. This procurement is targeted at ensuring consistent supply for critical army electrical modules and associated fittings. Unique terms include bidder compliance with the option clause and sample-based acceptance.
Product/service names from title: Automatic Voltage Regulator, Rectifier Bracket, Capacitor, Fuse, Oil Pressure Pipe, Switch Push, Regulator
Quantities: not disclosed; potential quantity variation up to 25%
Estimated value: ₹20,000.0
Delivery terms: aligned to last delivery order date; minimum 30 days extension
Sample/approval process: advance sample within 7 days; modifications required per buyer feedback
Option clause allows ±25% quantity change during and after contract at contracted rates
Advance sample submission within 7 days after award; bulk supply only after buyer approves sample
Delivery period may reset if buyer delays sample approval; non-conformance may trigger contract termination
Not specified in tender data; payment terms to be defined in contract
Delivery starts from last date of original delivery order; additional time formula provided with minimum 30 days
Not specified in tender data; penalties may be defined in final contract
Experience in supplying electrical components to government or defense sectors
Valid GST registration and PAN
Financial capability to handle contract fluctuations (25% qty variation)
Indian Army
POONCH, JAMMU & KASHMIR
Indian Army
SONITPUR, ASSAM
Indian Army
EAST SIKKIM, SIKKIM
Indian Army
DARJEELING, WEST BENGAL
Indian Army
PANCHKULA, HARYANA
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | Automatic Voltage Regulator | 6110-72-0479546 | 1 | nos | sur@17czw | 30 |
| 2 | Rectifier Bracket | XP-0616 | 1 | nos | sur@17czw | 30 |
| 3 | Capacitor | MISC-PROTOR-4BBY-A-9620-L-3 | 1 | nos | sur@17czw | 30 |
| 4 | Fuse | MISC-0-5PM3 | 2 | nos | sur@17czw | 30 |
| 5 | Oil Pressure Pipe | ND-IXC-KR-34-185-01-0 | 1 | nos | sur@17czw | 30 |
| 6 | Switch Push | Nd-misc-1200530159 | 1 | nos | sur@17czw | 30 |
| 7 | Regulator | Nd-6115-001203 | 1 | nos | sur@17czw | 30 |
Discover companies most likely to bid on this tender
GST certificate
Permanent Account Number (PAN) card
Experience certificates for similar supply
Financial statements (audited if available)
EMD/Security deposit documentation (if applicable)
Technical bid documents and conformity certificates
OEM authorizations or supplier Certifications (if required)
Any samples/approval documentation (advance sample approval records)
Extended Deadline
17-Jan-2026, 1:00 pm
Opening Date
17-Jan-2026, 1:30 pm
Key insights about ASSAM tender market
To bid for the Indian Army AVR procurement, ensure GST and PAN validity, collect experience certificates for similar electrical component supply, and prepare financials. Submit technical conformity documents, OEM authorizations if required, and EMD as applicable. Follow the advance sample process within 7 days of award and adhere to the option clause for quantity changes.
Required documents include GST certificate, PAN, experience certificates, financial statements, EMD documentation, technical compliance certificates, and OEM authorizations. Also attach sample approval records and any supplier quality certifications. Ensure all documents are current and aligned to government procurement standards.
Delivery commences from the last date of the original delivery order; extended time is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum 30 days. The buyer may extend the period during the option clause if quantities change by up to 25%.
The tender requires adherence to an approved sample and conformity to contract specifications. While explicit standards are not listed, suppliers must ensure the samples approved by the buyer match the final bulk supply, and deviations may trigger contract termination.
Specific payment terms are not provided in the tender data. Final contract will define payment milestones, typically linked to delivery or acceptance of goods, with potential advances or milestone payments upon sample approval and successful delivery as per contract.
Within 7 days of contract award, submit one advance sample for buyer approval. If approvals require modifications, provide modified samples promptly. If the buyer delays, the delivery period may be refixed without liquidated damages for the delay caused by sample approval lag.
Yes. The purchaser reserves the right to increase or decrease quantity up to 25% at the time of contract placement and up to 25% during currency, at contracted rates. Extended delivery time applies as per the option clause calculation.
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS