TenderDekho Logo
Closed GEM

Indian Army Department Of Military Affairs Tender Coimbatore Tamil Nadu 641001 – ISI/ISO/Hardware Compliance 2026

Bid Publish Date

20-Sep-2026, 8:14 pm

Bid End Date

30-Sep-2026, 9:00 pm

Progress

Issue20-Sep-2026, 8:14 pm
AwardPending

Key Highlights

  • • OEM-led installation and training requirement with OEM-certified resources
  • • Malicious Code Certificate confirming no embedded malware
  • • 3 years govt/PSU supply experience required
  • • 25% quantity variation permitted during contract and currency

Tender Overview

The Indian Army, Department Of Military Affairs, invites bids for a hardware procurement in COIMBATORE, TAMIL NADU 641001. Project scope references 16 BOQ items with no explicit quantities or values published. Key differentiators include OEM-led installation, mandatory Malicious Code Certificate, and a 3-year Govt/PSU supply history requirement. The tender emphasizes non-obsolescence (2+ years residual market life) and the option clause allowing ±25% quantity changes at contracted rates. No start/end dates are provided.

Technical Specifications & Requirements

  • No technical specifications are published in the tender data.
  • Critical compliance items explicitly stated:
    • OEM installation, commissioning, testing, configuration, and training by OEM-certified resources.
    • Malicious Code Certificate confirming absence of embedded malware with three risk checks.
    • Experience: bidder or OEM must have 3 years of regular supply to Central/State Govt bodies or PSUs prior to bid opening.
    • Documentation: PAN, GSTIN, cancelled cheque, EFT mandate (bank-certified).
    • GST applicability to be calculated by bidders with burden on the bidder; reimbursement as per actuals or applicable rates.

Terms, Conditions & Eligibility

  • Option Clause: quantity may increase/decrease by up to 25% during contract and currency with rates unchanged; delivery timing adjusts accordingly with a minimum 30 days.
  • Experience: minimum 3 years in similar category products; primary product in bunch bids must meet this criterion.
  • Documentation: submit PAN, GSTIN, cancelled cheque, EFT mandate; OEM authorization/certification for installation; proof of govt/PSU contracts.
  • Obsolescence: bid products must have at least 2 years residual market life; no end-of-life declarations by OEM during this period.
  • Tax: GST applicability to be verified by bidder; reimbursement as actuals or as per applicable rates (whichever lower).

Key Specifications

  • OEM-led installation, commissioning, testing, and training

  • Malicious Code Certificate with three risk checks

  • 3 years govt/PSU supply experience

  • 2+ years residual market life for bid items

  • 25% quantity variation with same contracted rates

Terms & Conditions

  • Option Clause enabling ±25% quantity change during contract

  • GST applicability borne by bidder with potential reimbursement

  • Mandatory OEM installation and Malicious Code Certificate

Important Clauses

Payment Terms

GST handling as actuals or applicable rates; payment terms not specified in the data

Delivery Schedule

Delivery period linked to last date of original delivery order; extended time calculated by formula with minimum 30 days

Penalties/Liquidated Damages

Not explicitly stated in the provided terms

Bidder Eligibility

  • 3 years of regular govt/PSU supply experience

  • OEM/ authorised reseller installation capability

  • Compliance with Malicious Code Certificate and GST/PAN/EFT documentation

Advertisement

Authority & Contact

Organization

Indian Army

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Financial Results

Rank Seller Price Item
L1
INDIRA ENTERPRISES(MSE)( MSE Social Category:General )    Under PMA
Item Categories : The next world war,An era of darkness,War and peace,War as I knew it,Chanakya and the art of war,As

Tender Data

Bid Details

Quantity

89

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Warranty Period

1 years

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Item Category

The next world war , An era of darkness , War and peace , War as I knew it , Chanakya and the art of war , Assembling India constitution , The spy and the traitor , The war that made R and AW , Rebel sultans , A farewell to Arms , The science motivating young people 10 to 25 , Motivational stickers , Crafting Paper A4 size , Sketch pen , Volley ball , Basket ball

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

Coimbatore

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-CoimbatoreCoimbatore--115-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENTINDIAN ARMY

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9920564.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Advertisement

Bill of Quantities (BOQ) 16 Items Sign in for GEM prices

#1

The next world war

The next world war

1 nos Delivery: 15 days
#2

An era of darkness

An era of darkness

1 nos Delivery: 15 days
#3

War and peace

War and peace

1 nos Delivery: 15 days
#4

War as I knew it

War as I knew it

1 nos Delivery: 15 days
#5

Chanakya and the art of war

Chanakya and the art of war

1 nos Delivery: 15 days
#6

Assembling India constitution

Assembling India constitution

1 nos Delivery: 15 days
#7

The spy and the traitor

The spy and the traitor

1 nos Delivery: 15 days
#8

The war that made R and AW

The war that made R and AW

1 nos Delivery: 15 days
#9

Rebel sultans

Rebel sultans

1 nos Delivery: 15 days
#10

A farewell to Arms

A farewell to Arms

1 nos Delivery: 15 days
#11

The science motivating young people 10 to 25

The science motivating young people 10 to 25

1 nos Delivery: 15 days
#12

Motivational stickers

Motivational stickers

50 nos Delivery: 15 days
#13

Crafting Paper A4 size

Crafting Paper A4 size

10 pkt Delivery: 15 days
#14

Sketch pen

Sketch pen

10 set Delivery: 15 days
#15

Volley ball

Volley ball

4 nos Delivery: 15 days
#16

Basket ball

Basket ball

4 nos Delivery: 15 days

Categories 3

Required Documents

1

PAN Card copy

2

GSTIN copy

3

Cancelled cheque copy

4

EFT Mandate certified by Bank

5

OEM authorization/certification for installation and commissioning

6

Proof of prior govt/PSU supply (3 years)

7

Malicious Code Certificate

8

Contract copies showing OEM/Reseller supply history

Frequently Asked Questions

Key insights about TAMIL NADU tender market

How to bid in the Indian Army hardware tender in Coimbatore 2026

Bidder must meet 3-year govt/PSU supply experience, provide PAN, GSTIN, cancelled cheque, and EFT mandate. OEM authorization and Malicious Code Certificate are mandatory. Installation and training must be performed by OEM-certified personnel; ensure items have ≥2 years residual market life and be prepared for 25% quantity variation.

What documents are required for govt hardware tender submission in Tamil Nadu

Submit PAN, GSTIN, cancelled cheque, EFT mandate, OEM authorization, proof of prior govt/PSU contracts (3 years), Malicious Code Certificate, and contract copies. Ensure installation and commissioning readiness by OEM-certified resources; provide evidence of mobility to Coimbatore delivery if applicable.

What are the key technical requirements for OEM installation in this bid

Key requirements include installation, commissioning, testing, configuration, and training performed by OEM-certified personnel or authorized resellers; a Malicious Code Certificate must be uploaded; confirm product supports 2+ years residual market life; ensure distinct BOM items conform to policy.

When is the delivery window and option clause for quantity changes

Delivery period extends from the last date of the original delivery order. If option clause is exercised, additional time equals (increase in quantity ÷ original quantity) × original delivery period, with a minimum of 30 days; extended delivery may apply up to the original period.

What is required for Malicious Code certification in this tender

Bidder must upload a Malicious Code Certificate ensuring hardware and software do not contain embedded malware that could inhibit function, cause damage, or tap information; document must accompany the bid and be verifiable by the evaluating authority.

What is the GST handling policy for this procurement in Tamil Nadu

Bidders must determine GST applicability; the buyer reimburses GST as actuals or at the applicable rates, whichever is lower, subject to the quoted GST percentage; ensure proper GSTIN and compliance documentation is included.

What is the minimum govt contract experience required for this bid

Bidder or OEM must have 3 years of regular manufacturing/supply experience to Central or State Govt organizations or PSUs; provide copies of relevant contracts showing yearly quantity during each year prior to bid opening.

Advertisement