Layer 2 Access Switch (V2)
Central Railway
MUMBAI, MAHARASHTRA
Bid Publish Date
21-Nov-2025, 6:33 pm
Bid End Date
01-Dec-2025, 7:00 pm
Bid Opening Date
01-Dec-2025, 7:30 pm
Value
₹3,00,00,000
Location
Progress
Quantity
272
Category
Layer 2 Access Switch (V2)
Bid Type
Two Packet Bid
The Uttar Pradesh Directorate Of Treasuries, Finance Department, seeks a Layer 2 Access Switch (V2) procurement for delivery to Lucknow, Uttar Pradesh 226001. Estimated value is ₹30,000,000 with an open quantity variation clause allowing up to 25% increase at contracted rates. Tender emphasizes project-wide scalability and alignment with state procurement norms, while requiring compliance with established quality and service standards. The award will consider ongoing supply reliability and post-sale support capabilities, rather than a single-price effort. A key differentiator is the option-driven delivery extension and flexible quantity handling within the contract window. Unique contracting terms include delivery-time calculation linked to the last delivery order date and potential extended periods.
Product/Category: Layer 2 Access Switch (V2)
Estimated contract value: ₹30,000,000
Quantity variation: up to 25% of bid/contract quantity
Standards: ISO 9001 certification (bid or OEM)
Service & Support: functional in-state service centers; 30-day establishment if not present
Support channels: dedicated toll-free number and escalation matrix
Delivery: period linked to last date of original delivery order; extended period rules apply
Option Clause enables 25% quantity adjustment during contract
ISO 9001 certification required for bidder or OEM
State-level service centers and 30-day establishment timeline
Dedicated support line and escalation matrix required
Delivery timelines anchored to original delivery order
Up to 25% increase/decrease in quantity at contracted rates; delivery period calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days.
Bidder or OEM must hold ISO 9001 certification to qualify; proof must be provided with bid.
Functional service centre in-state for each consignee location; if absent at bid time, establish within 30 days of award; payment contingent on documentary evidence.
ISO 9001 certified bidder or OEM
Functional Service Centre in-state or commitment to establish within 30 days
Ability to handle up to 25% quantity variation and adhere to extended delivery terms
Central Railway
MUMBAI, MAHARASHTRA
West Central Railway
KOTA, RAJASTHAN
Southern Railway
East Coast Railway
VISAKHAPATNAM, ANDHRA PRADESH
Employees Provident Fund Organisation (epfo)
THIRUVANANTHAPURAM, KERALA
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar Layer 2 switch supply projects
Financial statements demonstrating financial stability
EMD deposit documentation (if required at bid stage)
Technical bid documents demonstrating ISO 9001 compliance
OEM authorizations or proof of OEM collaboration
Evidence of functional Service Centre in-state or plan to establish within 30 days
Key insights about UTTAR PRADESH tender market
Bidders should ensure ISO 9001 certification, provide GST, PAN, and experience certificates, and demonstrate an in-state service center or a plan to establish one within 30 days. Prepare for quantity variation up to 25% and confirm delivery terms from the original order date.
Submit GST certificate, PAN card, experience certificates of similar projects, financial statements, ISO 9001 proof, OEM authorization, and evidence of a functional service center in-state or a plan to establish within 30 days of award.
Bidders or OEMs must hold ISO 9001 certification; proof must be included in the bid package to meet the quality management requirement for Layer 2 switches.
The purchaser reserves the right to increase or decrease quantity up to 25% of bid/contract quantity at contracted rates during and after the contract, with delivery time adjustments as specified.
If no service center exists at bid time, the bidder must establish one within 30 days of contract award; payment is released on documentary evidence of the center.
Delivery period begins from the last date of the original delivery order; when new quantity is added during the extended period, time is recalculated and minimum 30 days applies, with possible total extension up to the original delivery period.
A dedicated toll-free service number and an escalation matrix must be provided; ensure ongoing support during carry-in or on-site warranty as applicable to the delivered Layer 2 switches.
EMD details are not disclosed in the available data; bidders should verify the EMD amount and submission method in the final tender documents and prepare accordingly.
Armoured Vehicles Nigam Limited
📍 JABALPUR, MADHYA PRADESH
Airports Authority Of India
📍 THIRUVANANTHAPURAM, KERALA
Bihar State Police - A Voyage Of Excellence
📍 PATNA, BIHAR
Access all tender documents at no cost
Main Document
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Main Document
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS