TenderDekho Logo
Closed GEM

Contract Bidding Open For PRIMARY TERMINAL BLOCK, Part no - 101105901,BOARD SECONDARY TERMINAL Part No - 101103102, 1SET-2NOS in EAST SINGHBHUM, JHARKHAND

Bid Publish Date

20-Aug-2026, 10:35 am

Bid End Date

17-Sep-2026, 3:00 pm

EMD

₹10,000

Generate Docs

Progress

Issue20-Aug-2026, 10:35 am
Corrigendum17-Sep-2026
AwardPending

Uranium Corporation Of India Limited invites bids for PRIMARY TERMINAL BLOCK, Part no - 101105901, BOARD SECONDARY TERMINAL Part No - 101103102, 1SET-2NOS. , SWITCH BASE TRANSFORMER Complete Assembly, Part No. 100101157, BOARD PRIMARY, Part No - 101103012, CONTACT FIXED WITH COPPER STEM, Part No - 101111002, CONTACT FIXED WITH MS STEM, Part No. 101111001, MOVING CONTACT, Part No. 101111501, CONTACT CARRIER Part No. 101112001, GROMMET, Part No. 101105601, PER SET-2 NOS, CURRENT CONTROL HANDLE, Part No. 102001110, VOLTAGE CONTROL HANDLE, Part No. 102001111, 5 by 8 inch BRASS LOCK NUT, Part No. 710418640, 1SET-4NOS, SECONDARY TERMINAL MOULD NUT, Part No. 101105501, PLUNGER, Part No. 101112004, 1SET-3NOS, BRASS F. T STUD, 5 by 16 inch x 2 1 by 2 inch, Part No. 714131717, PIPE SPACER, SIZE- 2. 1 by 2 inch x 1. 7 by 16 inch, Part No. 101102801, SEAL OIL, Part No. 101105602, SPRING COMPRESSION, Part No. 801105001, 1SET-3NOS, NEOPRENE SPACER, Part No. 101105603, SECONDRARY TERMINAL ASSEMBLY, Part No. 101105001, PRIMARY TERMINAL SOCKET, Part No. 101105104, WASHER BRASS 5 by 8 inch, Part No. 712122218, 1SET-3 NOS in EAST SINGHBHUM, JHARKHAND. Quantity: 890. Submission Deadline: 17-09-2026 15: 00: 00. Submit your proposal before the deadline.

Authority & Contact

Organization

Uranium Corporation Of India Limited

Office Name

Jaduguda

Ministry

PMO

Grievance Contact

[email protected]

Tender Data

Bid Details

Quantity

890

Category

PRIMARY TERMINAL BLOCK, Part no - 101105901

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

Yes

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

3

OEM Avg. Turnover

9

Past Performance

30 %

Experience Required

1 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

PRIMARY TERMINAL BLOCK, Part no - 101105901 , BOARD SECONDARY TERMINAL Part No - 101103102, 1SET-2NOS. , SWITCH BASE TRANSFORMER Complete Assembly, Part No. 100101157 , BOARD PRIMARY, Part No - 101103012 , CONTACT FIXED WITH COPPER STEM, Part No - 101111002 , CONTACT FIXED WITH MS STEM, Part No . 101111001 , MOVING CONTACT, Part No . 101111501 , CONTACT CARRIER Part No . 101112001 , GROMMET, Part No. 101105601, PER SET-2 NOS , CURRENT CONTROL HANDLE, Part No. 102001110 , VOLTAGE CONTROL HANDLE,Part No. 102001111 , 5 by 8 inch BRASS LOCK NUT, Part No .710418640, 1SET-4NOS , SECONDARY TERMINAL MOULD NUT, Part No. 101105501 , PLUNGER, Part No. 101112004, 1SET-3NOS , BRASS F.T STUD, 5 by 16 inch x 2 1 by 2 inch, Part No. 714131717 , PIPE SPACER,SIZE- 2.1 by 2 inch x 1.7 by 16 inch, Part No. 101102801 , SEAL OIL, Part No. 101105602 , SPRING COMPRESSION, Part No . 801105001, 1SET-3NOS , NEOPRENE SPACER,Part No. 101105603 , SECONDRARY TERMINAL ASSEMBLY, Part No. 101105001 , PRIMARY TERMINAL SOCKET,Part No . 101105104 , WASHER BRASS 5 by 8 inch, Part No. 712122218, 1SET-3 NOS

Advisory Bank

State Bank of India

ePBG Percentage

3%

ePBG Duration (Months)

17

Payment Timelines

Payments shall be made to the Seller within 10 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

90

Delivery Locations

1

Delivery Cities

East Singhbum

Delivery Pincodes

832102

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
SUDIPTA DAS832102,UCIL JADUGUDA STORE CHIEF SUPERINTENDENT STORE AT/PO-JADUGUDA MINES MAIN BUILDING URANIUM CORPORATION OF INDIA LTD Ph No : 9431139916East SinghbumJharkhand8321025090-

Authority Records

DEPARTMENT OF ATOMIC ENERGY

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9757117.pdf

Main Document

Other Documents

OTHER

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 22 Items Sign in for GEM prices

#1

PRIMARY TERMINAL BLOCK, Part no - 101105901

PRIMARY TERMINAL BLOCK, Part no - 101105901

50 nos Delivery: 90 days
#2

BOARD SECONDARY TERMINAL Part No - 101103102, 1SET-2NOS.

BOARD SECONDARY TERMINAL Part No - 101103102, 1SET-2NOS.

50 set Delivery: 90 days
#3

SWITCH BASE TRANSFORMER Complete Assembly, Part No. 100101157

SWITCH BASE TRANSFORMER Complete Assembly, Part No. 100101157

10 set Delivery: 90 days
#4

BOARD PRIMARY, Part No - 101103012

BOARD PRIMARY, Part No - 101103012

50 nos Delivery: 90 days
#5

CONTACT FIXED WITH COPPER STEM, Part No - 101111002

CONTACT FIXED WITH COPPER STEM, Part No - 101111002

50 nos Delivery: 90 days
#6

CONTACT FIXED WITH MS STEM, Part No . 101111001

CONTACT FIXED WITH MS STEM, Part No . 101111001

30 nos Delivery: 90 days
#7

MOVING CONTACT, Part No . 101111501

MOVING CONTACT, Part No . 101111501

30 nos Delivery: 90 days
#8

CONTACT CARRIER Part No . 101112001

CONTACT CARRIER Part No . 101112001

50 nos Delivery: 90 days
#9

GROMMET, Part No. 101105601, PER SET-2 NOS

GROMMET, Part No. 101105601, PER SET-2 NOS

50 set Delivery: 90 days
#10

CURRENT CONTROL HANDLE, Part No. 102001110

CURRENT CONTROL HANDLE, Part No. 102001110

20 nos Delivery: 90 days
#11

VOLTAGE CONTROL HANDLE,Part No. 102001111

VOLTAGE CONTROL HANDLE,Part No. 102001111

20 nos Delivery: 90 days
#12

5 by 8 inch BRASS LOCK NUT, Part No .710418640, 1SET-4NOS

5 by 8 inch BRASS LOCK NUT, Part No .710418640, 1SET-4NOS

50 set Delivery: 90 days
#13

SECONDARY TERMINAL MOULD NUT, Part No. 101105501

SECONDARY TERMINAL MOULD NUT, Part No. 101105501

50 nos Delivery: 90 days
#14

PLUNGER, Part No. 101112004, 1SET-3NOS

PLUNGER, Part No. 101112004, 1SET-3NOS

50 set Delivery: 90 days
#15

BRASS F.T STUD, 5 by 16 inch x 2 1 by 2 inch, Part No. 714131717

BRASS F.T STUD, 5 by 16 inch x 2 1 by 2 inch, Part No. 714131717

50 nos Delivery: 90 days
#16

PIPE SPACER,SIZE- 2.1 by 2 inch x 1.7 by 16 inch, Part No. 101102801

PIPE SPACER,SIZE- 2.1 by 2 inch x 1.7 by 16 inch, Part No. 101102801

20 nos Delivery: 90 days
#17

SEAL OIL, Part No. 101105602

SEAL OIL, Part No. 101105602

50 nos Delivery: 90 days
#18

SPRING COMPRESSION, Part No . 801105001, 1SET-3NOS

SPRING COMPRESSION, Part No . 801105001, 1SET-3NOS

50 set Delivery: 90 days
#19

NEOPRENE SPACER,Part No. 101105603

NEOPRENE SPACER,Part No. 101105603

50 nos Delivery: 90 days
#20

SECONDRARY TERMINAL ASSEMBLY, Part No. 101105001

SECONDRARY TERMINAL ASSEMBLY, Part No. 101105001

20 nos Delivery: 90 days
#21

PRIMARY TERMINAL SOCKET,Part No . 101105104

PRIMARY TERMINAL SOCKET,Part No . 101105104

40 nos Delivery: 90 days
#22

WASHER BRASS 5 by 8 inch, Part No. 712122218, 1SET-3 NOS

WASHER BRASS 5 by 8 inch, Part No. 712122218, 1SET-3 NOS

50 set Delivery: 90 days

Categories 9

Corrigendum Updates

1 Update
#1

Update

17-Sep-2026

Extended Deadline

17-Sep-2026, 9:30 am

Opening Date

18-Sep-2026, 9:30 am

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Annual Turnover *In case any bidder is seeking exemption from Experience / Turnover Criteria

6

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer