Bid Publish Date
13-Aug-2025, 9:16 am
Bid End Date
10-Sep-2025, 6:00 pm
Location
Progress
RAQuantity
5028
Category
EA9041B-SIKKA-12
Bid Type
Two Packet Bid
Indian Navy invites bids for EA9041B-SIKKA-12, EE9017B-EMF-BC-FAC2-10, EA3769B- ILMS M -8006, EA9041B-AC-FORK-25-I, EA9041B-AC-JL-2. 5- I, EA9041B-ACPIN-25-I, EA9041B-AL-UPS-1110-110-1KVA-V, EA9041B-VII-1073-6-6HTL-104, EA9041B-VIII-1041-L-133, EE9017B-EMF-BC-FAC-03, EE9017B-EMF-BC-FAC-06, EE9017B-EMF-BC-FAC-10, EE9017B-EMF-DB-1, EE9017B- TP-MCB-02, EE9085D-SK-501-003-001, EF3163B-3TF4422- 0A, EE9017B-BC-100A, EE9017B-DB-MCB-07, EA9041B- VIII-1039-5-AC1, EA9041B-VIII-1039-10-AC1, EW6015V- WIPG411311135101110081, EW6015V-51000-201-0027, EW6015V-51000-201-0041, EW6015V-51000-201-0044, EW6015V-51000-201-0082, EW6015V-51000-201-0085, EW6015V-52021201-0045 in UTTARA KANNADA, KARNATAKA. Quantity: 5028. Submission Deadline: 10-09-2025 18: 00: 00. Submit your proposal before the deadline.
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | EA9041B-SIKKA-12 | GEAR BOX BEARING TEMPERATURE MONITOR | 2 | pieces | cwh-karwar | 180 |
| 2 | EE9017B-EMF-BC-FAC2-10 | DIODE 130 AMPS | 3 | pieces | cwh-karwar | 180 |
| 3 | EA3769B-ILMS M -8006 | COIL FOR SIZE 1 CONTACTOR 220V 50CS | 2,044 | pieces | cwh-karwar | 180 |
| 4 | EA9041B-AC-FORK-25-I | LUGS FORK TYPE RANGE 2 5MM | 1,195 | pieces | cwh-karwar | 180 |
| 5 | EA9041B-AC-JL-2.5-I | JOINT LUGS TYPE WITH SLEEVE 2 5MM | 397 | pieces | cwh-karwar | 180 |
| 6 | EA9041B-ACPIN-25-I | LUGS PIN TYPE WITH SLEEVE RANGE 2 5MM | 1,076 | pieces | cwh-karwar | 180 |
| 7 | EA9041B-AL-UPS-1110-110-1KVA-V | UPS-1 KVA (INPUT-230 VAC OUTPUT-230 VAC) | 2 | pieces | cwh-karwar | 180 |
| 8 | EA9041B-VII-1073-6-6HTL-104 | CPP OIL PRESSURE GAUGE RANGE 0-6 BAR | 1 | pieces | cwh-karwar | 180 |
| 9 | EA9041B-VIII-1041-L-133 | LIMIT SWITCHES FOR INTERLOCKS INDICATION | 7 | pieces | cwh-karwar | 180 |
| 10 | EE9017B-EMF-BC-FAC-03 | INDICATING LAMP 230V | 92 | pieces | cwh-karwar | 180 |
| 11 | EE9017B-EMF-BC-FAC-06 | DIODE 70AMPS | 24 | pieces | cwh-karwar | 180 |
| 12 | EE9017B-EMF-BC-FAC-10 | DIODE 130AMPS | 19 | pieces | cwh-karwar | 180 |
| 13 | EE9017B-EMF-DB-1 | 16A MCB DP | 86 | pieces | cwh-karwar | 180 |
| 14 | EE9017B-TP-MCB-02 | 16A DP DC MCB | 8 | pieces | cwh-karwar | 180 |
| 15 | EE9085D-SK-501-003-001 | WET GRINDER MACHINE | 1 | pieces | cwh-karwar | 180 |
| 16 | EF3163B-3TF4422-0A | 32AMP CONTACTOR220V COIL WITH 2NO +2NC CONTACT SIEMENS | 1 | pieces | cwh-karwar | 180 |
| 17 | EE9017B-BC-100A | BATTERY CHARGER 100A | 1 | pieces | cwh-karwar | 180 |
| 18 | EE9017B-DB-MCB-07 | 50A TP MCB | 2 | pieces | cwh-karwar | 180 |
| 19 | EA9041B-VIII-1039-5-AC1 | SEA WATER PRESSURE 0-5 BAR 0-1 | 2 | pieces | cwh-karwar | 180 |
| 20 | EA9041B-VIII-1039-10-AC1 | LUB OIL INLET FILTER PRESSURE 0-10 BAR 0-1 | 4 | pieces | cwh-karwar | 180 |
| 21 | EW6015V-WIPG411311135101110081 | L/O PRESSURE GAUGE 0-10 KG/CM2 | 1 | pieces | cwh-karwar | 180 |
| 22 | EW6015V-51000-201-0027 | SUCTION PRESSURE GAUGE (-76HG TO 1KG/CM2) | 2 | pieces | cwh-karwar | 180 |
| 23 | EW6015V-51000-201-0041 | DISCHARGE PRESSURE GAUGE (0 TO 11KG/CM2) | 23 | pieces | cwh-karwar | 180 |
| 24 | EW6015V-51000-201-0044 | SUCTION PRESSURE GAUGE | 7 | pieces | cwh-karwar | 180 |
| 25 | EW6015V-51000-201-0082 | SUCTION PRESSURE GAUGE (30 TO 150 PSI) | 24 | pieces | cwh-karwar | 180 |
| 26 | EW6015V-51000-201-0085 | DISCHARGE PRESSURE GAUGE (30 TO 300 PSI) | 3 | pieces | cwh-karwar | 180 |
| 27 | EW6015V-52021201-0045 | LUB OIL PRESSURE GAUGE RANGE 0 TO 7KG/SQ.CM | 1 | pieces | cwh-karwar | 180 |
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover
Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Extended Deadline
10-Sep-2025, 6:00 pm
Opening Date
10-Sep-2025, 6:30 pm
Start
23-Oct-2025, 1:00 pm
End
03-Nov-2025, 9:00 pm
Duration: 272 hours
Reverse Auction Document
✅ RA concluded. Check financial results for final rankings.
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | ********** Under PMA | - | 03-09-2025 15:57:29 | Evaluated |
| 2 | ********** Under PMA | - | 15-08-2025 00:14:32 | Evaluated |
| 3 | ********** Under PMA | - | 26-08-2025 10:21:22 | Evaluated |
| 4 | ********** Under PMA | - | 09-09-2025 21:30:53 | Evaluated |
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS