Progress
Quantity
1
Bid Type
Two Packet Bid
The Rural Development Department Bihar invites bids for a RO Plant with Genset and Trolley in Bhagalpur, Bihar 812001. Scope includes delivery, installation, and warranty on both whole items and spare parts. The tender notes an option clause allowing up to 25% quantity variation during and after contract with rates fixed at delivery. While BOQ items are not listed, the procurement targets a turnkey water treatment solution for rural infrastructure, emphasizing installation work, water tanks, and RO fittings as part of the package. The opportunity is distinguished by the combination of water treatment hardware and on-site installation commitments within a rural development framework, with emphasis on compliance to specified materials and supplier capabilities.
Product: RO Plant with Genset and Trolley
Warranty on spare parts and on all items supplied
Materials/installation: iron steel, electrical fittings, water tank, water chiller with RO fittings
Delivery: quantity variation up to 25% with extended timelines
ATC scope includes water tank installation and water chiller with RO fittings
Key term: Option clause allows ±25% quantity change at contract and during currency
Key term: Warranty on spare parts and entire equipment
Key term: Delivery period adjustments based on original/extended timelines
Payment terms not explicitly stated; bidders should align with government norms, typically milestone-based with acceptance.
Delivery can be adjusted per option clause; additional time calculated as (additional quantity / original quantity) × original delivery period, min 30 days.
Not specified in data; bidders should expect standard LDs for late delivery per contract.
Experience in supplying or installing RO water treatment plants with genset and installation work
Financial capacity to handle extended delivery and variation in quantity up to 25%
Capability to provide warranty on spare parts and full equipment with post-sales service
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
RO Plant with Genset and Trolley (Q3)
Payment Timelines
Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
GRAM PANCHAYAT MADRAUNI
Delivery Pincodes
813227
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Ajeet Kumar Singh | 813227,GRAM PANCHAYAT MADRAUNI | GRAM PANCHAYAT MADRAUNI | - | 813227 | 1 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
CATALOG Specification
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
| Category | Specification | Requirement |
|---|---|---|
| Warranty/Services | Warranty on spare parts | 12, 18, 24 Or higher |
| Warranty/Services | Warranty on whole items supplied | 1, 2, 3, 4, 5 Or higher |
Discover companies most likely to bid on this tender
GST certificate
Permanent Account Number (PAN) card
Experience certificates showing relevant RO water plant installations
Financial statements or solvency documents
EMD/Security deposit proof
Technical bid documents demonstrating RO plant with genset capability
OEM authorizations or dealership certificates
Warranty and post-sales support commitments
Key insights about BIHAR tender market
Bidders must submit GST, PAN, experience certificates, financials, EMD proof, OEM authorizations, and technical bid documents. Ensure compliance with the warranty on spare parts and whole items, and prepare installation capability for water treatment equipment with RO fittings and genset integration.
Required documents include GST certificate, PAN, experience certificates for similar projects, financial statements, EMD proof, technical bid, OEM authorization, and installation capability evidence for water tanks and RO fittings.
The contract requires warranty on spare parts and warranty on all items supplied. Vendors must guarantee availability of spare parts and provide post-sales service for the entire RO plant, genset, and trolley assembly.
The purchaser may increase or decrease quantity by up to 25%; delivery period scales using the specified formula with a minimum of 30 days, starting after the last original delivery order date.
While specific standards are not listed, suppliers should propose ISI/ISO-compliant components where applicable, with clear warranty and service commitments for water treatment equipment and electrical fittings.
Exact payment terms are not disclosed; bidders should anticipate milestone-based payments tied to delivery acceptance, with standard government procurement practices and audit-compliant invoicing.
Installation scope includes iron steel and electrical fittings, water tank installation, and water chiller integration with RO fittings, ensuring complete on-site setup and handover to the implementing agency.
Verify eligibility by meeting prior RO plant installation experience, possessing valid GST/PAN, submitting financial credibility documents, and providing OEM authorizations and warranty commitments as per T&Cs.
Sign up now to access all documents
Main Document
CATALOG Specification
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS