TenderDekho Logo
Active GEM

Procurement Opportunity: Supply of earthing wire 4 sq mm,Supply of earthing wire 6 sq mm,Supply of earthing wire 16 sq mm,Su in INDORE, MADHYA PRADESH

Bid Publish Date

17-Aug-2026, 7:23 pm

Bid End Date

04-Sep-2026, 3:00 pm

EMD

₹8,48,000

Generate Docs

Progress

Issue17-Aug-2026, 7:23 pm
Corrigendum27-Aug-2026
AwardPending

A tender has been published for Hindustan Petroleum Corporation Ltd Supply of earthing wire 4 sq mm, Supply of earthing wire 6 sq mm, Supply of earthing wire 16 sq mm, Su in INDORE, MADHYA PRADESH. Quantity: 50412 by. Submission Deadline: 04-09-2026 15: 00: 00. Check eligibility and apply.

Tender Data

Bid Details

Quantity

50412

Category

Supply of earthing wire 4 sq mm

Bid Type

Two Packet Bid

Bid Validity

120 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

63

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Advisory Bank

ICICI

ePBG Percentage

5%

ePBG Duration (Months)

28

Payment Timelines

Payments shall be made to the Seller within 15 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

730

Delivery Locations

1

Delivery Cities

Indore

Delivery Pincodes

453771

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Salapu Vardhan453771,HPCL, Indore New IRD, Sanwer Road , Village Manglia , Dist . Indore , MP 453771IndoreMadhya Pradesh4537712800730-

Authority Records

MINISTRY OF PETROLEUM AND NATURAL GAS

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9767753.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Department

NA

Office Name

Petroleum House

Grievance Contact

[email protected]

Corrigendum Updates

2 Updates
#1

Update

27-Aug-2026
#2

Update

27-Aug-2026

Extended Deadline

04-Sep-2026, 9:30 am

Opening Date

04-Sep-2026, 10:00 am

Bill of Quantities (BOQ) 159 Items Sign in for GEM prices

#1

Supply of earthing wire 4 sq mm

As mentioned in tender

2,800 rm Delivery: 730 days
#2

Supply of earthing wire 6 sq mm

As mentioned in tender

5,100 rm Delivery: 730 days
#3

Supply of earthing wire 16 sq mm

As mentioned in tender

1,200 rm Delivery: 730 days
#4

Supply of glands FLP- double Compressor 19 MM

As mentioned in tender

85 eac Delivery: 730 days
#5

Supply of glands FLP- double Compressor 25 MM

As mentioned in tender

140 eac Delivery: 730 days
#6

Supply of glands FLP- double Compressor 28 MM

As mentioned in tender

70 eac Delivery: 730 days
#7

Supply of glands FLP- double Compressor 32 MM

As mentioned in tender

160 eac Delivery: 730 days
#8

Supply of glands FLP- double Compressor 35 MM

As mentioned in tender

230 eac Delivery: 730 days
#9

Supply of glands FLP- double Compressor 38 MM

As mentioned in tender

155 eac Delivery: 730 days
#10

Supply of glands FLP- double Compressor 45 MM

As mentioned in tender

410 eac Delivery: 730 days
#11

Supply of glands FLP- double Compressor 50 MM

As mentioned in tender

310 eac Delivery: 730 days
#12

Supply of glands FLP- double Compressor 57 MM

As mentioned in tender

220 eac Delivery: 730 days
#13

Supply of glands FLP- double Compressor 63 MM

As mentioned in tender

160 eac Delivery: 730 days
#14

Supply of glands FLP- double Compressor 70 MM

As mentioned in tender

130 eac Delivery: 730 days
#15

Supply of glands Non- FLP -SC 19 MM

As mentioned in tender

100 eac Delivery: 730 days
#16

Supply and of glands Non- FLP -SC 25 MM

As mentioned in tender

50 eac Delivery: 730 days
#17

Supply of glands Non- FLP -SC 28 MM

As mentioned in tender

40 eac Delivery: 730 days
#18

Supply of glands Non- FLP -SC 32 MM

As mentioned in tender

65 eac Delivery: 730 days
#19

Supply of glands Non- FLP -SC 35 MM

As mentioned in tender

55 eac Delivery: 730 days
#20

Supply of glands Non- FLP -SC 38 MM

As mentioned in tender

85 eac Delivery: 730 days
#21

Supply of glands Non- FLP -SC 45 MM

As mentioned in tender

70 eac Delivery: 730 days
#22

Supply of glands Non- FLP -SC 50 MM

As mentioned in tender

70 eac Delivery: 730 days
#23

Supply of glands Non- FLP -SC 57 MM

As mentioned in tender

70 eac Delivery: 730 days
#24

Supply of glands Non- FLP -SC 63 MM

As mentioned in tender

70 eac Delivery: 730 days
#25

Supply of glands Non- FLP -SC 70 MM

As mentioned in tender

70 eac Delivery: 730 days
#26

Supply of double coat G.I Strip 25X3

As mentioned in tender

1,000 kg Delivery: 730 days
#27

Supply of double coat G.I Strip 50X6

As mentioned in tender

1,800 kg Delivery: 730 days
#28

Supply of AL 3.5 c x 35 sq mm FRLS armoured cable

As mentioned in tender

800 rm Delivery: 730 days
#29

Supply of Cables FRLS 12 core,1.5 sq mm armoured

As mentioned in tender

700 rm Delivery: 730 days
#30

Nut Bolt with washer as required-GI

As mentioned in tender

850 kg Delivery: 730 days
#31

PT wiring Switch Fan

As mentioned in tender

65 eac Delivery: 730 days
#32

6A Socket Switch

As mentioned in tender

200 eac Delivery: 730 days
#33

AC Point

As mentioned in tender

170 rm Delivery: 730 days
#34

Ceiling Fans 1400 mm sweep

As mentioned in tender

64 eac Delivery: 730 days
#35

Exhaust Fans 305mm Dia

As mentioned in tender

56 eac Delivery: 730 days
#36

18 w LED Lamp

As mentioned in tender

340 eac Delivery: 730 days
#37

63 A TPN MCB DB

As mentioned in tender

280 eac Delivery: 730 days
#38

32 A TPN MCB DB

As mentioned in tender

210 eac Delivery: 730 days
#39

Cable Trench Excavation

As mentioned in tender

650 m3 Delivery: 730 days
#40

FLP JUNCTION BOX 4 Inch

As mentioned in tender

100 eac Delivery: 730 days
#41

FLP JUNCTION BOX 6 Inch

As mentioned in tender

80 eac Delivery: 730 days
#42

FLP JUNCTION BOX 10 Inch

As mentioned in tender

90 eac Delivery: 730 days
#43

FLP JUNCTION BOX 14 Inch

As mentioned in tender

95 eac Delivery: 730 days
#44

Junction Box NFLP 4 way

As mentioned in tender

100 eac Delivery: 730 days
#45

Earthing PIT Pipe Electrode

As mentioned in tender

395 eac Delivery: 730 days
#46

Emergency Switch Mushroom Type

As mentioned in tender

105 eac Delivery: 730 days
#47

LED driver

As mentioned in tender

440 eac Delivery: 730 days
#48

MNX 80 contactor

As mentioned in tender

42 eac Delivery: 730 days
#49

HRC fuse

As mentioned in tender

550 eac Delivery: 730 days
#50

LED 50 W

As mentioned in tender

205 eac Delivery: 730 days
#51

SPLY and INST RAIL POLE 13 Mtr

As mentioned in tender

8 eac Delivery: 730 days
#52

V CROSS ARM

As mentioned in tender

73 eac Delivery: 730 days
#53

11 KV F CLAMP

As mentioned in tender

73 eac Delivery: 730 days
#54

BACK CLAMP FOR V CROSS ARM

As mentioned in tender

78 eac Delivery: 730 days
#55

PIN INSULATOR 33KV

As mentioned in tender

119 eac Delivery: 730 days
#56

HT STAY INSULATOR

As mentioned in tender

91 eac Delivery: 730 days
#57

XLPE, 3C 95MM2 HT CABLE

As mentioned in tender

650 rm Delivery: 730 days
#58

JOINTING KIT- 50MM2 XLPE CABLE

As mentioned in tender

140 eac Delivery: 730 days
#59

JOINTING KIT- 95MM2 XLPE CABLE

As mentioned in tender

32 eac Delivery: 730 days
#60

DISC Insulator

As mentioned in tender

140 eac Delivery: 730 days
#61

Dog conductor

As mentioned in tender

600 rm Delivery: 730 days
#62

Nut bolt for misceleneous job

As mentioned in tender

1,200 kg Delivery: 730 days
#63

3.5C, 185MM2 PVC CABLE

As mentioned in tender

250 rm Delivery: 730 days
#64

PAINT,BLACK

As mentioned in tender

65 ltr Delivery: 730 days
#65

3.5CX35SQMM AL CABLE

As mentioned in tender

300 rm Delivery: 730 days
#66

3.5CX 120 SQMM AL CABLE

As mentioned in tender

950 rm Delivery: 730 days
#67

3.5CX50SQMM AL CABLE

As mentioned in tender

1,350 rm Delivery: 730 days
#68

TRANSFORMER OIL

As mentioned in tender

1,700 ltr Delivery: 730 days
#69

FENCING FOR BARBED WIRE

As mentioned in tender

1,350 m2 Delivery: 730 days
#70

DANGER BOARD

As mentioned in tender

590 eac Delivery: 730 days
#71

HT STAY SET

As mentioned in tender

70 eac Delivery: 730 days
#72

STAY WIRE,GI,7 by 10SWG

As mentioned in tender

120 m2 Delivery: 730 days
#73

Overload relay 63A

As mentioned in tender

77 eac Delivery: 730 days
#74

NO-NC Start stop push button gland

As mentioned in tender

620 eac Delivery: 730 days
#75

SITE CLEARANCE

As mentioned in tender

1,050 m2 Delivery: 730 days
#76

EXCAVATION IN EARTH UPTO 1.5

As mentioned in tender

270 m3 Delivery: 730 days
#77

EXCAVATION - 1.5 TO 3 M

As mentioned in tender

270 m3 Delivery: 730 days
#78

STRUCTURAL STEEL

As mentioned in tender

1,002 mt Delivery: 730 days
#79

Earthing relay OSNA

As mentioned in tender

55 eac Delivery: 730 days
#80

CROCODILE ALUMINIUM CLAMP

As mentioned in tender

186 eac Delivery: 730 days
#81

Proximity switches with IP 67 protection sensing range 1.5 mm

As mentioned in tender

108 eac Delivery: 730 days
#82

Multimeter

As mentioned in tender

23 eac Delivery: 730 days
#83

HT gloves with HT certificate

As mentioned in tender

30 eac Delivery: 730 days
#84

L-key set

As mentioned in tender

75 eac Delivery: 730 days
#85

Insulation mat

As mentioned in tender

380 m2 Delivery: 730 days
#86

Copper Strip

As mentioned in tender

120 kg Delivery: 730 days
#87

Emergency lighting

As mentioned in tender

110 eac Delivery: 730 days
#88

Limit switch for barrier gates 5 Amps

As mentioned in tender

95 eac Delivery: 730 days
#89

Supply of rotary switches FLP 5 amp

As mentioned in tender

120 eac Delivery: 730 days
#90

Supply of rotary switches FLP 16 amp

As mentioned in tender

145 eac Delivery: 730 days
#91

LED plates 200 watts

As mentioned in tender

425 eac Delivery: 730 days
#92

Adaptors 200 watts

As mentioned in tender

225 eac Delivery: 730 days
#93

Media convertors

As mentioned in tender

60 eac Delivery: 730 days
#94

CAT 6 CABLE ARMOURED

As mentioned in tender

5,500 rm Delivery: 730 days
#95

Supply of well glassfitted LED 60 watt

As mentioned in tender

170 eac Delivery: 730 days
#96

Supply of RCCB 32 A with 30 ma sensitivity

As mentioned in tender

160 eac Delivery: 730 days
#97

Supply of FLP plugs 19 mm

As mentioned in tender

100 eac Delivery: 730 days
#98

supply of cable tie

As mentioned in tender

450 eac Delivery: 730 days
#99

Supply of energy meter

As mentioned in tender

81 eac Delivery: 730 days
#100

Supply of ELCB 63 A four Pole

As mentioned in tender

145 eac Delivery: 730 days
#101

Supply of ELCB 32 A double pole

As mentioned in tender

145 eac Delivery: 730 days
#102

Battery 12V Lead-Acid battery with cables

As mentioned in tender

99 eac Delivery: 730 days
#103

Earthpit construction as per standard IS 3043

As mentioned in tender

40 eac Delivery: 730 days
#104

BATTERY 12 V 150 AH FOR DG FIRE ENGINE-with Buyback

As mentioned in tender

17 eac Delivery: 730 days
#105

BATTERY 12 V 180 AH FOR DG FIRE ENGINE-with Buyback

As mentioned in tender

40 eac Delivery: 730 days
#106

Hand siren with provision for wailing

As mentioned in tender

36 eac Delivery: 730 days
#107

OVERLOAD RELAY 70-95 AMP

As mentioned in tender

72 eac Delivery: 730 days
#108

OVERLOAD RELAY 32-40 AMP

As mentioned in tender

77 eac Delivery: 730 days
#109

OVERLOAD RELAY 16-25 AMP

As mentioned in tender

42 eac Delivery: 730 days
#110

OVERLOAD RELAY 4-6.3 AMP

As mentioned in tender

59 eac Delivery: 730 days
#111

OVERLOAD RELAY 2.5-4 AMP

As mentioned in tender

62 eac Delivery: 730 days
#112

SUP - LUGS - FOLLWING SZSAL.LUGS 150 SQM

As mentioned in tender

253 eac Delivery: 730 days
#113

SUP - LUGS - FOLLWING SZSAL.LUGS 120 SQM

As mentioned in tender

183 eac Delivery: 730 days
#114

SUP - LUGS - FOLLWING SZSAL.LUGS 95 SQMM

As mentioned in tender

228 eac Delivery: 730 days
#115

SUP - LUGS - FOLLWING SZSAL.LUGS 70 SQMM

As mentioned in tender

180 eac Delivery: 730 days
#116

SUP - LUGS - FOLLWING SZSALL.LUGS 50 SQM

As mentioned in tender

267 eac Delivery: 730 days
#117

SUP - LUGS - FOLLWING SZSAL.LUGS 35 SQMM

As mentioned in tender

262 eac Delivery: 730 days
#118

SUP - LUGS - FOLLWING SZSAL.LUGS 25 SQMM

As mentioned in tender

262 eac Delivery: 730 days
#119

SUP - LUGS - FOLLWING SZSAL.LUGS 16 SQMM

As mentioned in tender

230 eac Delivery: 730 days
#120

SUP - LUGS - FOLLWING SZSAL.LUGS 10 SQMM

As mentioned in tender

220 eac Delivery: 730 days
#121

50 SQMM COPPER RING LUGS

As mentioned in tender

230 eac Delivery: 730 days
#122

35 SQMM COPPER RING LUGS

As mentioned in tender

230 eac Delivery: 730 days
#123

25 SQMM COPPER RING LUGS

As mentioned in tender

130 eac Delivery: 730 days
#124

16 SQMM COPPER RING LUGS

As mentioned in tender

160 eac Delivery: 730 days
#125

10 SQMM COPPER RING LUGS

As mentioned in tender

165 eac Delivery: 730 days
#126

4 SQMM COPPER RING LUGS

As mentioned in tender

160 eac Delivery: 730 days
#127

2.5SQMM COPPER RING LUGS

As mentioned in tender

232 eac Delivery: 730 days
#128

1.5 SQMM COPPER RING LUG

As mentioned in tender

305 eac Delivery: 730 days
#129

2.5SQMM COPPER PIN TYPE LUGS

As mentioned in tender

195 eac Delivery: 730 days
#130

1.5 SQMM COPPER PIN TYPE LUG

As mentioned in tender

195 eac Delivery: 730 days
#131

100 AMP 3 POLE MCCB

As mentioned in tender

14 eac Delivery: 730 days
#132

63 AMP 4 POLE MCB

As mentioned in tender

54 eac Delivery: 730 days
#133

16 - 32 AMP 4 POLE MCB

As mentioned in tender

20 eac Delivery: 730 days
#134

16 -32 AMP 3 POLE MCB

As mentioned in tender

27 eac Delivery: 730 days
#135

16 AMP 4 POLE MCB

As mentioned in tender

59 eac Delivery: 730 days
#136

10 AMP 4 pole MCB

As mentioned in tender

59 eac Delivery: 730 days
#137

16 - 40 AMP 2 POLE MCB

As mentioned in tender

59 eac Delivery: 730 days
#138

6 -32 AMP 1 POLE MCB

As mentioned in tender

55 eac Delivery: 730 days
#139

CONTACTOR 55 KW LCIE-160-200A

As mentioned in tender

35 eac Delivery: 730 days
#140

CONTACTOR 30 KW LCIE-120-150A

As mentioned in tender

35 eac Delivery: 730 days
#141

CONTACTOR 22 KW LCIE-80-110A

As mentioned in tender

35 eac Delivery: 730 days
#142

CONTACTOR 18.5 KW LCIE-80

As mentioned in tender

35 eac Delivery: 730 days
#143

CONTACTOR 11 KW LCIE-80-55A

As mentioned in tender

35 eac Delivery: 730 days
#144

FLP BRASS STP or BLK PLUG 2 INCH

As mentioned in tender

80 eac Delivery: 730 days
#145

FLP BRASS STP or BLK PLUG 1 INCH

As mentioned in tender

80 eac Delivery: 730 days
#146

FLP BRASS STP or BLK PLUG 3 by 4 IN

As mentioned in tender

95 eac Delivery: 730 days
#147

FLP BRASS STP or BLK PLUG 1by 2 IN

As mentioned in tender

80 eac Delivery: 730 days
#148

SPLY AND FIXG OF LT GLOVE RAT 440V

As mentioned in tender

47 eac Delivery: 730 days
#149

CASING CAPING,PVC SIZE 50MM

As mentioned in tender

130 eac Delivery: 730 days
#150

SPLY and INSTLN WALL MOUNTED FAN

As mentioned in tender

53 eac Delivery: 730 days
#151

PB STATION,ESD

As mentioned in tender

130 eac Delivery: 730 days
#152

FLP LCS with ammeter, start, emergency stop-32A

As mentioned in tender

22 eac Delivery: 730 days
#153

FLP LCS with ammeter, start, emergency stop-63A

As mentioned in tender

22 eac Delivery: 730 days
#154

Supply of Inductor choke 200 Watt

As mentioned in tender

370 eac Delivery: 730 days
#155

Supply of bottom LED plate 90 watts

As mentioned in tender

340 eac Delivery: 730 days
#156

Supply of Inductor choke 90 watts

As mentioned in tender

340 eac Delivery: 730 days
#157

Suppy of Megger

As mentioned in tender

6 eac Delivery: 730 days
#158

Supply of Clamp meter

As mentioned in tender

8 eac Delivery: 730 days
#159

Supply of Earth pit tester

As mentioned in tender

8 eac Delivery: 730 days

Categories 140

BACK CLAMP AD FILM CONTROLLER SWITCHES VOLTAGE METERS BRIDGE CONSTRUCTION CLAMP METER APFC PANEL POLYETHYLENE PIPE TRAFFIC BARRIER FUSES SWITCHES AND RELAY RING COPPER STRIP CONSTRUCTION MATERIALS POWER METERS DOG SUB STATION ACSR POWER CABLE CABBING EQUIPMENTS COMPRESSOR WIRE FENCING EMERGENCY?LIGHT AIR COOLED ENGINE ELECTRICAL PRODUCTS HELIPAD BUS CABLE SWITCH YARD WIRING ASSEMBLY LED STREET LIGHT STRUCTURAL AMPS BEARING SHELL THRUST ELECTROCARDIOGRAPHY UNITS SWITCHING APPARATUS AUTOMOTIVE BATTERY DEMOLITION BUILDING LED LIGHT PANEL GEYSER MULTIMETERS SUPPLY OF SCHOOL UNIFORM HT CABLE STRIP DISCRETE COMPONENTS ADAPTORS ELECTRICAL WIRE XLPE CABLE STEEL TUBE STEEL WIRE LIGHTENING PROTECTION DEVICE TELECOM EQUIPMENT WATTMETERS SOIL EARTH AKHALO ROTARY SWITCHES SNG BARBED WIRE DEVELOPMENT WORK MCCB GI WIRE ELECTRICAL BOXES ELECTRICAL SUBSTATION STATIC CONVERTERS WATER DRAINAGE DRY CELL BATTERIES EARTH LEAKAGE RELAY BULLDOZING CONDUCTOR COOLER ELECTRONIC COMMUNICATION MEASURING AND TESTING INSTRUMENT LIGHT AND BULBS ELASTROMERIC PIPE ENGINE SOCKET OT CEILING LIGHT ENERGY METER ELECTRONIC TESTERS MS WIRE TRANSFORMER OIL ELECTRONIC BATTERIES MEGGER EARTH PIPE HIGH TENSION PANEL LED LUMINARIES COILED CABLE SLUM REDEVELOPMENT SWITCH GEAR VOLTMETER SOLAR CELLS LFH CABLE EARTH AND STONE ELECTRODES PVC CABLE GLUCOMETER CABLE LAYING SOUNDER OVERLOAD RELAY POWER WIRE ELECTRICAL MEASURING AND TESTING EQUIPMENT VERTICAL COOLER ACID SOLAR PHOTOVOLTAIC MODULE ELECTRICAL INSULATORS CABLE LUG BOX VOLT METER WIRE FILTER RETAINERS SOLAR PV PROJECT CAT SOLAR PHOTOVOLTAIC SYSTEM FILLING RAIN CUT FLUORESCENT LAMP LFH WIRE LIGHTING BACKHOE TRENCHING WORK TRANSITION METALS BRIDGE CRANES CABLE LIMIT SWITCHES POWER RELAYS BATTERY VALVE PARTS AND ACCESSORIES EXCAVATION DIGITAL TESTERS SOFT STARTER BUNDI FIRST AID BOX PEB CABLE SUPPLY ELECTROMAGNET FAN PROXIMITY SWITCHES STEEL SUPPLY BURGLAR ALARM EARTH MOVING CONSTRUCTION MERRY GO ROUND SWITCH SUPPLY

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Bidder Turnover

2

Certificate (Requested in ATC)

3

Additional Doc 1 (Requested in ATC)

4

Additional Doc 2 (Requested in ATC)

5

Additional Doc 3 (Requested in ATC)

6

Additional Doc 4 (Requested in ATC)

7

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

8

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer