Progress
Madikeri Taluk Panchayath of the Rural Development and Panchayat Raj Department, Karnataka invites bids for UPS installation and associated works at the Chief Executive Officer’s Quarters in Kodagu, Karnataka (571201). The action plan covers rooftop and ancillary construction works valued up to “Rs. 50.00 Lakh,” including steel roof protection, car parking shed, RCC paving, SS railings, and UPS installation components. The package explicitly includes an **UPS system upgrade comprising four 100Ah batteries, one 2kW inverter, and one UPS box. The scope leverages the Buyer’s option clause for quantity adjustments up to 25%. Delivery and completion align with project timelines defined by the issuing authority, under the Zilla Panchayath Building Construction and Maintenance wing.
UPS installation for Chief Executive Officer’s Quarters
Battery specification: 100Ah capacity; quantity: 4 numbers
Inverter specification: 2kW rating; quantity: 1 number
UPS enclosure/box: quantity 1
Associated civil works: steel roof, tile roofing, car parking shed, RCC road, lawn development
Warranty/AMC details: not specified in data; confirm during bid
Option clause allows ±25% quantity variation during and after contract
Delivery period linked to original order with minimum 30 days extension
Rs. 50 Lakh action plan covers multiple construction and UPS components
EMD and payment terms to be confirmed in full ATC and tender documents
OEM authorization required for UPS/inverter components
Site location: Kodagu, Karnataka; project authority: Zilla Panchayath Building Construction and Maintenance
Payment terms not fully detailed in available data; bidders should expect government-standard terms tied to delivered milestones and acceptance.
Delivery aligned to original delivery order with potential extension; additional time computed as (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days.
Not specified in provided data; bidders must review ATC document for LD/penalties applicable to delays or non-compliance.
Experience in UPS/inverter installation for residential/commercial projects
Financial capacity to execute ₹50 Lakh action plan
Authorized OEM/ dealer for UPS components including batteries (100 Ah) and 2 kW inverters
Quantity
1
Bid Type
Two Packet Bid
Bid Validity
30 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
No
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Min. Avg. Annual Turnover
85
Past Performance
10 %
Experience Required
1 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Inverter Battery Trolley (Q3)
Payment Timelines
Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
Kodagu
Delivery Pincodes
571201
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Jayanna R N | 571201,MADIKERI | Kodagu | Karnataka | 571201 | 1 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar UPS installation projects
Financial statements for the past 2-3 years
EMD/Security deposit proof
Technical bid documents demonstrating compliance with UPS installation components
OEM authorization or authorized dealer certificate for UPS/inverter batteries
Any site-specific safety and warranty documents
Key insights about KARNATAKA tender market
Bidders must submit GST, PAN, experience certificates, financial statements, EMD proof, technical bid, and OEM authorizations. The procurement includes four 100Ah batteries, one 2kW inverter, and one UPS box; ensure compliance with the option clause allowing up to 25% quantity adjustments and confirm delivery timelines from the original order date.
Required documents include GST registration, PAN card, at least two years of financial statements, experience certificates for UPS projects, EMD submission, OEM authorization for UPS components, and technical bid detailing equipment specs (100Ah batteries, 2kW inverter, UPS box) and installation plan.
Specifically, four 100Ah batteries, one 2kW inverter, and one UPS box are required for Chief Executive Officer’s Quarters installation; ensure OEM authorization and compatibility with the UPS system and safety standards during bid submission.
Delivery is governed by the original delivery order with possible extensions under the option clause; the extension time formula is (additional quantity/original quantity) × original delivery period, with a mandatory minimum of 30 days.
Eligible bidders should have prior UPS/inverter installation experience, demonstrate financial capacity for a ₹50 Lakh action plan, and possess OEM authorization for UPS batteries (100Ah) and 2kW inverters; ensure compliance with all local safety and installation standards.
The action plan includes steel roof construction, tile roofing for rain protection, car parking shed, RCC road/lawn development, and stainless steel railings on staircases; UPS installation sits within a broader building construction and maintenance program.