Organization: Bharat Heavy Electricals Limited (BHEL) under the Department Of Heavy Industry. Procurement focuses on BOLT HEX varieties and U-BOLT (six total items in the BOQ). The tender follows a Rate Contract model with 3% performance security and a 25% option to increase/decrease quantity. Estimated value and EMD amounts are not disclosed in the data, but the contract includes packaging in original packing material and non-returnable packing. Location is not specified in the tender snapshot. A unique clause enables extended delivery time proportional to quantity adjustments, with a minimum 30 days. This opportunity is governed by GeM terms and includes tolls, Octroi, and related taxes being embedded in the base rate.
3% performance security on each PO under GeM rate contract
Quantity adjustment authority up to 25% during contract term
Demurrage 0.5% per day for unlifted items; destruction after one month
3% performance security on each PO; taxes included in base rate; no separate toll/entry charges
Delivery period calculated from original delivery date; extended period proportional to quantity change; minimum 30 days
Demurrage at 0.5% of total contract value per day for unlifted items; destruction after one month
Must meet GeM rate contract requirements for hardware fasteners
Provide 3% performance security per PO
Submit OEM authorizations if applicable and demonstrate supply capability for bolt hex and U-bolts
Quantity
13700
Category
HY7111199189 BOLT HEX
Bid Type
Two Packet Bid
Bid Validity
30 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Min. Avg. Annual Turnover
3
OEM Avg. Turnover
3
Past Performance
30 %
Experience Required
2 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
HY7111199189 BOLT HEX , HY7111199332 BOLT HEX , HY7111199774 BOLT HEX , HY7111199944 BOLT HEX , HY7121198053 SCRU HEX , HY9603148229 U BOLT
Payment Timelines
Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
60
Delivery Locations
1
Delivery Cities
Sangareddy
Delivery Pincodes
502032
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Saurabh Shekhar | 502032,BHEL , HPEP , Ramachandrapuram | Sangareddy | Telangana | 502032 | 100 | 60 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
HY7111199189 BOLT HEX
BOLT HEX M12X120 P8.8 GAL
HY7111199332 BOLT HEX
BOLT HEX M16X75 P8.8 GAL
HY7111199774 BOLT HEX
BOLT HEX M20X100 P8.8 GAL
HY7111199944 BOLT HEX
BOLT HEX HD M16X90-IS1364GRA P8.8GLVNZD
HY7121198053 SCRU HEX
SCRU HEX M6X35P8.8 GAL
HY9603148229 U BOLT
U BOLT 2.5 IN GALVANISED
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | HY7111199189 BOLT HEX | BOLT HEX M12X120 P8.8 GAL | 100 | pieces | hpep_gt_003 | 60 | |
| 2 | HY7111199332 BOLT HEX | BOLT HEX M16X75 P8.8 GAL | 2,000 | pieces | hpep_gt_003 | 60 | |
| 3 | HY7111199774 BOLT HEX | BOLT HEX M20X100 P8.8 GAL | 6,000 | pieces | hpep_gt_003 | 60 | |
| 4 | HY7111199944 BOLT HEX | BOLT HEX HD M16X90-IS1364GRA P8.8GLVNZD | 5,000 | pieces | hpep_gt_003 | 60 | |
| 5 | HY7121198053 SCRU HEX | SCRU HEX M6X35P8.8 GAL | 500 | pieces | hpep_gt_003 | 60 | |
| 6 | HY9603148229 U BOLT | U BOLT 2.5 IN GALVANISED | 100 | pieces | hpep_gt_003 | 60 |
Extended Deadline
01-Sep-2026, 4:30 am
Opening Date
01-Sep-2026, 5:00 am
Extended Deadline
28-Aug-2026, 5:30 am
Opening Date
28-Aug-2026, 6:00 am
Extended Deadline
25-Aug-2026, 5:30 am
Opening Date
25-Aug-2026, 6:00 am
Extended Deadline
19-Aug-2026, 4:30 am
Opening Date
19-Aug-2026, 5:00 am
Extended Deadline
13-Aug-2026, 4:30 am
Opening Date
13-Aug-2026, 5:00 am
Extended Deadline
10-Aug-2026, 4:30 am
Opening Date
10-Aug-2026, 5:00 am
Extended Deadline
03-Aug-2026, 5:30 am
Opening Date
03-Aug-2026, 6:00 am
Extended Deadline
31-Jul-2026, 5:30 am
Opening Date
31-Jul-2026, 6:00 am
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar bolt hex/screw hex supply
Financial statements proving turnover and financial stability
EMD submission document showing 3% of expected PO value
Technical bid documents confirming capability for hex bolts and U-bolts
OEM authorization or authorized dealer certificates (if applicable)
Key insights about TELANGANA tender market
Bidders must submit GST, PAN, experience certificates, financials, and EMD of 3% of the PO value. Include OEM authorization if applicable and technical bids confirming capability for HY codes. Follow delivery terms and packing requirements; comply with 25% quantity option and 0.5% daily demurrage penalties for delays.
Submit GST certificate, PAN, past performance certificates for similar bolt hex work, latest financial statements, EMD document showing 3% of PO value, technical compliance documents, and OEM authorizations if you are a dealer. Include packing compliance statements per GeM terms.
Delivery is governed by the original delivery period with possible extension proportional to quantity changes, minimum 30 days. Demurrage applies at 0.5% of contract value per day for unlifted items; unlifted items may be destroyed after one month.
No explicit standards are listed in the tender excerpt. Ensure compliance with GeM rate contract requirements, appropriate packing standards, and supplier capabilities for hex bolts and U-bolts as per HY codes.
Quantity can be increased/decreased up to 25% of bid quantity at contract placement; during the currency of the contract, it may extend up to 25% at contracted rates with delivery time adjusted accordingly.
Items must be packed in the seller’s original packing material; packing should use standardized weights and not be returned. Net quantity is counted; packing weight is excluded from the quantity.
Performance security of 3% of the total contract value is required for each Purchase Order raised under the GeM rate contract; ensure timely submission to avoid PO rejection.
All toll taxes, entry taxes, and octroi are embedded in the base bid price; bidders should include any applicable local taxes within their quoted rate.