Cat 6 Cable,IO Box with connector,24 Port Manageable Switch,Media Converter 1000M,Casing Capping 1
Indian Army
Bid Publish Date
27-Jun-2026, 5:33 pm
Bid End Date
07-Jul-2026, 6:00 pm
Value
₹3,85,449
Location
Progress
Quantity
3843
Category
Cat 6 cable
Bid Type
Two Packet Bid
Sainik School Sangathan, operating under the Department Of Defence, seeks bidders for a comprehensive networking and IT infrastructure package. The procurement covers Cat 6 cabling, 4U racks fully loaded, 24 Port Gigabit switches, Giga media converters, Access Points, networking hardware controllers, load balancers, 5 m patch cords, RJ-45 connectors, and PVC Cat6 cable laying using casing caps. Estimated value is ₹385,449, with an ambiguous EMD not disclosed. The scope includes per-node networking charges and installation. A distinctive feature is the option to vary quantity by up to 25% during contract execution, with delivery timing linked to the original delivery period and extended terms. A pre-bid meeting is mandatory and non-extendable delivery commitments apply. This tender emphasizes turnkey installation, site readiness, and compliant cabling and hardware integration under defence procurement norms. The absence of explicit itemized BOQ details suggests a broad, standards-driven rollout rather than isolated SKU purchases, focusing on cohesive network deployment.
Product/service names and categories: Cat 6 cabling, 4U loaded racks, 24 Port Gig Switch, Giga media converter, Access Point, Hardware controller, Load balancer, Patch cords, RJ-45 connectors, PVC Cat6 cabling with casing caps
Quantities/values: Estimated value ₹385,449; 13 BOQ items listed but N/A
Standards/Compliance: Not specified; emphasis on coherent network deployment for defence
Delivery/Installation: Per-node networking charges and installation; mandatory pre-bid meeting
Experience: Not specified; focus on turnkey deployment capability
Option Clause allows up to 25% quantity variation during contract at contracted rates
Delivery period starts from last date of original delivery order; minimum extension 30 days
Pre-bid meeting mandatory; pre-bid certificate to be uploaded with bid
Not explicitly stated; delivery must align with stipulated time, extensions not allowed
Delivery period linked to last date of original delivery order; additional time if quantity increases follows formula with minimum 30 days
Not specified in data; emphasis on non-extension and strict adherence to delivery timelines
Experience in turnkey networking infrastructure deployment
Capability to install Cat 6 cabling and associated hardware
Compliance with defence procurement protocols
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Cat 6 cable , 4U rack fully loaded , 24 Port Giga Switch , I Box with face plate and back cover , Giga media converter , Access Point , Hardware controller , Load balancer , Patch cord 5 mtr , RJ 45 connector , PVC laying for cat6 cable using casing capping , Networking Charges Per node and installation
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
Indian Army
JODHPUR, RAJASTHAN
N/a
GWALIOR, MADHYA PRADESH
Indian Army
VARANASI, UTTAR PRADESH
Indian Army
BANGALORE, KARNATAKA
Tender Results
Loading results...
Cat 6 cable
As per ATC
4U rack fully loaded
As per ATC
24 Port Giga Switch
As per ATC
I Box with face plate and back cover
As per ATC
Giga media converter
As per ATC
Access Point
As per ATC
Hardware controller
As per ATC
Load balancer
As per ATC
Patch cord 5 mtr
As per ATC
RJ 45 connector
As per ATC
PVC laying for cat6 cable using casing capping
As per ATC
Networking Charges Per node and installation
As per ATC
Networking Charges Per node and installation
As per ATC
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Cat 6 cable | As per ATC | 1,525 | mtr | ao@ssbbsr1 | 15 | |
| 2 | 4U rack fully loaded | As per ATC | 1 | nos | ao@ssbbsr1 | 15 | |
| 3 | 24 Port Giga Switch | As per ATC | 4 | nos | ao@ssbbsr1 | 15 | |
| 4 | I Box with face plate and back cover | As per ATC | 120 | nos | ao@ssbbsr1 | 15 | |
| 5 | Giga media converter | As per ATC | 3 | nos | ao@ssbbsr1 | 15 | |
| 6 | Access Point | As per ATC | 3 | nos | ao@ssbbsr1 | 15 | |
| 7 | Hardware controller | As per ATC | 1 | nos | ao@ssbbsr1 | 15 | |
| 8 | Load balancer | As per ATC | 1 | nos | ao@ssbbsr1 | 15 | |
| 9 | Patch cord 5 mtr | As per ATC | 120 | nos | ao@ssbbsr1 | 15 | |
| 10 | RJ 45 connector | As per ATC | 300 | nos | ao@ssbbsr1 | 15 | |
| 11 | PVC laying for cat6 cable using casing capping | As per ATC | 1,525 | nos | ao@ssbbsr1 | 15 | |
| 12 | Networking Charges Per node and installation | As per ATC | 120 | nodes | ao@ssbbsr1 | 15 | |
| 13 | Networking Charges Per node and installation | As per ATC | 120 | nodes | ao@ssbbsr1 | 15 |
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar networking deployments
Financial statements or turn-over proof
EMD/Security deposit documents (if required by buyer)
Technical bid documents demonstrating hardware compatibility
OEM authorizations or certifications (if required)
Bidders should prepare company credentials, GST and PAN, experience proofs, financials, and EMD documents (if required). Submit OEM authorizations, technical compliance, and installation plans. Ensure a mandatory pre-bid meeting certificate is uploaded. The contract includes Cat 6 cabling, 24-port switches, and related hardware.
Provide GST certificate, PAN card, experience certificates for similar deployments, financial statements, EMD or security deposit details, technical bid documents, and OEM authorizations if applicable. Include installation plans, site readiness evidence, and safety compliance records as part of the submission.
Delivery must occur within the stipulated time with no extension. The option clause allows up to 25% quantity variation at contracted rates, and any extra time is calculated from the original delivery period with a minimum of 30 days.
A pre-bid meeting is mandatory, and the pre-bid certificate must be uploaded with the bid. Ensure readiness for potential questions on Cat 6 cabling, 4U racks, switches, access points, and installation methodology.
Scope includes Cat 6 cabling, 4U racked hardware, 24 Port Gig Switches, Giga media converters, Access Points, Hardware Controllers, Load Balancers, 5 m patch cords, RJ-45 connectors, and PVC Cat6 laying with casing caps.
Applicants should demonstrate turnkey deployment capability, prior defence or secure installation experience, valid GST/PAN, financial stability, and ability to comply with option clause and mandatory pre-bid requirements.
purchasers may increase order up to 25% during contract at contracted rates; delivery time scales with increased quantity using the 30-day minimum rule unless otherwise specified.
While explicit standards aren’t listed, bidders should propose ISI/ISO-aligned practices and ensure Cat 6 cabling and network gear meet general industry standards for defence-grade installations.
National Institute Of Technology (nit)
📍 EAST KHASI HILLS, MEGHALAYA
Marketing Division
📍 LUCKNOW, UTTAR PRADESH
Indian Navy
📍 ERNAKULAM, KERALA
Thaluka General Hospital
📍 CHITRADURGA, KARNATAKA
Navodaya Vidyalaya Samiti
📍 HOOGHLY, WEST BENGAL
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS