Progress
Quantity
913
Bid Type
Two Packet Bid
Jawaharlal Nehru Centre For Advanced Scientific Research (jncasr) has released a public tender for Airconditioner - 1, Airconditioner - 2, Airconditioner - 3, Stabilizer - 1, Accessories -1, Accessories - 2, Accessories- 3, Accessories- 4, Accessories - 5, Accessories - 6, Accessories - 7, Accessories - 8, Accessories - 9, Accessories - 10, Accessories - 11, Accessories - 12, Installation in BANGALORE, KARNATAKA. Quantity: 913. Submission Deadline: 03-04-2025 16: 00: 00. Download documents and apply online.
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Airconditioner - 1 , Airconditioner - 2 , Airconditioner - 3 , Stabilizer - 1 , Accessories -1 , Accessories - 2 , Accessories- 3 , Accessories- 4 , Accessories - 5 , Accessories - 6 , Accessories - 7 , Accessories - 8 , Accessories - 9 , Accessories - 10 , Accessories - 11 , Accessories - 12 , Installation
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Airconditioner - 1
4.0Tr 3 Phase Slimline Unit with Cordless Remote Control
Airconditioner - 2
3.0Tr 3 Phase Slimline AC with Cordless Remote Control
Airconditioner - 3
2.0Tr Inverter Hiwall Split AC with Cordless Remote Control BEE 5 star rating
Stabilizer - 1
5KVA Electronic Voltage Stabilizer
Accessories -1
Soft drawn Refrigerant pipe and Insulation for 4.0Tr Slimline Unit as per annexure
Accessories - 2
Soft drawn Refrigerant pipe and Insulation for 3.0Tr Slimline Unit as per annexure
Accessories- 3
Soft drawn Refrigerant pipe and Insulation for Hiwall AC
Accessories- 4
4 Core 2.5 Sq.mm control cable between Indoor to outdoor units
Accessories - 5
32mm Dia C PVC Drain pipe with necessary fittings for condensate water
Accessories - 6
25mm Dia C PVC Drain pipe with necessary fitting for condensate water
Accessories - 7
63mm Dia PVC pipe for covering refrigerant pipe
Accessories - 8
Rigid Box PVC Size 100mm X 50mm
Accessories - 9
Fabricated stand to mount outdoor units
Accessories - 10
Fabricated stand to mount Indoor units
Accessories - 11
Sequential Timer controller along with accessories
Accessories - 12
3inch Dia Core Cutting
Installation
Installation and Commissioning Charges
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Airconditioner - 1 | 4.0Tr 3 Phase Slimline Unit with Cordless Remote Control | 2 | piece | [email protected] | 15 | |
| 2 | Airconditioner - 2 | 3.0Tr 3 Phase Slimline AC with Cordless Remote Control | 4 | pieces | [email protected] | 15 | |
| 3 | Airconditioner - 3 | 2.0Tr Inverter Hiwall Split AC with Cordless Remote Control BEE 5 star rating | 3 | pieces | [email protected] | 15 | |
| 4 | Stabilizer - 1 | 5KVA Electronic Voltage Stabilizer | 3 | pieces | [email protected] | 15 | |
| 5 | Accessories -1 | Soft drawn Refrigerant pipe and Insulation for 4.0Tr Slimline Unit as per annexure | 80 | rmt | [email protected] | 15 | |
| 6 | Accessories - 2 | Soft drawn Refrigerant pipe and Insulation for 3.0Tr Slimline Unit as per annexure | 150 | rmt | [email protected] | 15 | |
| 7 | Accessories- 3 | Soft drawn Refrigerant pipe and Insulation for Hiwall AC | 60 | rmt | [email protected] | 15 | |
| 8 | Accessories- 4 | 4 Core 2.5 Sq.mm control cable between Indoor to outdoor units | 341 | rmt | [email protected] | 15 | |
| 9 | Accessories - 5 | 32mm Dia C PVC Drain pipe with necessary fittings for condensate water | 10 | rmt | [email protected] | 15 | |
| 10 | Accessories - 6 | 25mm Dia C PVC Drain pipe with necessary fitting for condensate water | 26 | rmt | [email protected] | 15 | |
| 11 | Accessories - 7 | 63mm Dia PVC pipe for covering refrigerant pipe | 174 | rmt | [email protected] | 15 | |
| 12 | Accessories - 8 | Rigid Box PVC Size 100mm X 50mm | 26 | rmt | [email protected] | 15 | |
| 13 | Accessories - 9 | Fabricated stand to mount outdoor units | 9 | nos | [email protected] | 15 | |
| 14 | Accessories - 10 | Fabricated stand to mount Indoor units | 6 | nos | [email protected] | 15 | |
| 15 | Accessories - 11 | Sequential Timer controller along with accessories | 3 | set | [email protected] | 15 | |
| 16 | Accessories - 12 | 3inch Dia Core Cutting | 7 | nos | [email protected] | 15 | |
| 17 | Installation | Installation and Commissioning Charges | 9 | nos | [email protected] | 15 |
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | COLDAIRE INC Under PMA | - | 02-04-2025 16:15:41 | |
| 2 | DAYAL LUDHIANVI INFRA & POWER SOLUTIONS PRIVATE LIMITED Under PMA | - | 24-03-2025 16:45:03 |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | COLDAIRE INC(MSE,MII)( MSE Social Category:General ) Under PMA | Item Categories : Airconditioner - 1,Airconditioner - 2,Airconditioner - 3,Stabilizer - 1,Accessories -1,Accessories |
Key insights about KARNATAKA tender market
The eligibility requirements for bidders include being a registered legal entity, possessing the necessary licenses for supplying air conditioners and voltage stabilizers, and demonstrating technical expertise relevant to the HVAC sector. Furthermore, financial capability and a track record of previous experience in similar projects are essential.
Participants must provide relevant certificates, including GST registration, a valid trade license, and quality assurance certificates that validate compliance with industry standards for air conditioning products. Any additional certifications listed in the tender documentation should also be included.
Registration for the tender can be completed through the designated online portal as specified in the tender documents. Interested bidders must create an account, complete the necessary forms, and submit required documents. Follow the instructions carefully to ensure successful registration.
All documents submitted must be in specified formats outlined in the tender guidelines. Commonly accepted formats include PDF, DOC, and XLSX. Bidders are advised to verify the submission requirements in the tender documentation to avoid discrepancies.
Payment terms typically include milestones related to the delivery and acceptance of goods, where partial payments may occur based on completed phases. Additional details concerning performance security requirements and payment timelines will be defined in the tender documentation. Ensure you review these terms carefully to align your financial process with the expectations of the tendering authority.
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS