HPCL Rajasthan Refinery Limited Gearbox Accessories and Supervision Services Tender Barmer Rajasthan 2026

Bid Publish Date

19-Oct-2026, 9:31 am

Bid End Date

02-Nov-2026, 4:00 pm

Generate Docs

Progress

Issue19-Oct-2026, 9:31 am
Corrigendum29-Oct-2026
AwardPending

Key Highlights

  • • Specific quantity variation allowed: up to 25% during contract and currency at contracted rates
  • • Integrity Pact mandatory with bid submission
  • • 20-week delivery window for supply items 1-3 (140 days)
  • • 7-day mobilization window for supervision services

Tender Overview

Organization: HPCL Rajasthan Refinery Limited, located in Barmer, Rajasthan. Procurement covers a set of mechanical components including Hold Back Adapters for each gearbox, hexagonal head screws, springs, washers, and related accessories, plus supervision charges per gearbox on a daily basis. The estimated value and EMD are not disclosed in the available data. A key feature is the option clause allowing quantity adjustments up to 25% at contract or during currency at contracted rates, with delivery windows anchored to the last date of the original delivery order. The inclusion of an Integrity Pact mandates bidder compliance and submission of a signed copy. A detailed SLA governs scope, warranties, and payment terms.

Technical Specifications & Requirements

  • Delivery period for items 1–3: 140 delivery days (i.e., 20 weeks).
  • For item 4 (Supervision services): overall contract period; mobilization within 7 days of HRRL EIC notification.
  • Category items include: final pin set for 18T, R7.5(4.57/1), HB, PC-23, along with adapter sets, fasteners, springs, washers, and miscellaneous accessories.
  • Service scope references a detailed SLA with delivery, warranty, and payment terms; specifics reside in the SLA attached to the ATC document.
  • Integrity Pact must be uploaded; no embossed brand restrictions are specified.

Terms, Conditions & Eligibility

  • Quantity variation up to 25% at contract and during currency, at contracted rates.
  • Delivery commencement tied to the last date of the original delivery order; extended time formula: (Increased quantity ÷ Original quantity) × Original delivery period, min 30 days.
  • Mobilization and supervision service terms require early deployment within 7 days after notification.
  • Bidder must upload signed Integrity Pact; SLA terms apply for warranty, penalties, and payment.
  • EMD, exact values, and specific delivery locations beyond Barmer are not disclosed in the provided data.

Key Specifications

  • Gearbox accessories: Hold Back Adapter set for each gearbox

  • Included fasteners: hexagonal head screws, springs, washers

  • Service: supervision charges on per-gearbox per day basis

  • Standards: not specified in data; refer to SLA for any standard requirements

  • Delivery: 140 days for items 1–3, 20 weeks

  • Mobilization: within 7 days for supervision services

Terms & Conditions

  • EMD amount and exact estimated value not disclosed; bidder must submit documented proof

  • Delivery quantity flexibility up to 25% with contracted rates

  • Integrity Pact and SLA compliance mandatory for all bidders

Important Clauses

Payment Terms

Payment terms are defined in the SLA; exact terms not disclosed in available data

Delivery Schedule

Delivery for items 1–3: 140 delivery days; supervision services: overall contract period with rapid mobilization within 7 days

Penalties/Liquidated Damages

Penalties to be defined in SLA; reference to LD clauses in the ATC document

Bidder Eligibility

  • Experience in supplying gearbox components and related hardware

  • Demonstrated capability to mobilize supervision services within 7 days

  • Compliance with Integrity Pact and SLA terms

Advertisement

Tender Data

Bid Details

Quantity

72

Category

FINAL PIN SFT 18T, R7.5(4.57/1) , HB, PC-23

Bid Type

Two Packet Bid

Bid Validity

90 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

FINAL PIN SFT 18T, R7.5(4.57/1) , HB, PC-23 , Set of Hold Back Adapter for each gear box , Hexagonal head screw, springs, washer and other accessories , Supervision charges for each gear box per day basis

Advisory Bank

State Bank of India

ePBG Percentage

5%

ePBG Duration (Months)

15

Payment Timelines

Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

140

Delivery Locations

1

Delivery Cities

Barmer

Delivery Pincodes

344032

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Ashwin Uttam Ahire344032,HPCL Rajasthan Refinery Limited Project Site Village Sajiyali Roopji Kanthwada and Sambhara Tehsil Pachpadra District Barmer 344032 RajasthanBarmerRajasthan34403212140-

Authority Records

MINISTRY OF PETROLEUM AND NATURAL GAS

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 8

GeM-Bidding-10041363.pdf

Main Document

Buyer uploaded ATC document

ATC

Buyer uploaded ATC document

ATC

Buyer uploaded ATC document

ATC

Buyer uploaded ATC document

ATC

Other Documents

OTHER

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Department

NA

Office Name

Hrrl7th Floor Rcf Priyadarshni Eastern Expressw

Grievance Contact

[email protected]

Corrigendum Updates

2 Updates
#1

Update

29-Oct-2026

Extended Deadline

02-Nov-2026, 10:30 am

Opening Date

03-Nov-2026, 10:30 am

#2

Update

26-Oct-2026

Extended Deadline

29-Oct-2026, 10:30 am

Opening Date

30-Oct-2026, 10:30 am

Advertisement

Categories 4

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates showing relevant supply of gearbox components

4

Financial statements or turnover proof

5

EMD/Security deposit documentation (amount not disclosed in data)

6

Technical bid documents demonstrating compliance with SLA

7

OEM authorizations or supplier certifications if applicable

8

Signed Integrity Pact

Frequently Asked Questions

Key insights about RAJASTHAN tender market

What documents are required for the gearbox accessories tender in Barmer Rajasthan 2026?

Bidders must submit GST registration, PAN, experience certificates, financial statements, EMD documentation, technical bid, OEM authorizations if applicable, and a signed Integrity Pact. The SLA terms govern warranty, penalties, and payment; ensure submission aligns with the ATC document.

How is delivery time structured for items 1–3 in the Barmer tender?

Delivery for items 1–3 is 140 days from order, equivalent to 20 weeks. If the buyer exercises the option clause, extended delivery is calculated using the formula: (increased quantity/original quantity) × original delivery period, with a minimum of 30 days.

What is the mobilization window for supervision services in this procurement?

Mobilization for supervision services must occur within 7 days of HRRL EIC notification. The overall contract period governs supervision scope, not a delivery quantity window, with ongoing mobilization as needed.

What is the integrity pact requirement for the HPCL Rajasthan tender in Barmer?

All bidders must upload a signed Integrity Pact as per the buyer’s policy. This is mandatory and accompanies the bid submission to ensure compliance with ethical procurement practices.

What are the key items listed under the category for gearbox accessories?

The category includes final pin sets for 18T, R7.5(4.57/1), HB, PC-23 gearboxes, plus set of Hold Back Adapters, hexagonal head screws, springs, washers, and other accessories, with supervision charges per gearbox on a daily basis.

What standards or certifications are required for this tender?

The tender data does not specify exact standards; bidders should review the SLA for any ISI/ISO requirements and ensure compliance with supplier certifications, OEM authorizations, and integrity commitments mentioned in the ATC document.

How does quantity variation affect contract pricing in Barmer procurement?

Quantity can be increased or decreased by up to 25% of bid quantity at contract or during currency. Pricing remains at the contracted rates, with extension delivery times calculated per the option clause formula.

What is the overall scope for the items under this HPCL HRRL tender 2026?

Scope includes gearbox accessory kits, fasteners, springs, washers, and supervision services across the specified gearboxes, with delivery timelines, SLA terms, and integrity obligations defined in the SLA and ATC document.

Advertisement