TenderDekho Logo
Closed GEM

Bids are Invited For Manual Core Splitter,Manual Hydraulic Core Splitter in KAMRUP, ASSAM

Bid Publish Date

18-Dec-2024, 4:29 pm

Bid End Date

08-Jan-2025, 5:00 pm

Location

Progress

Issue18-Dec-2024, 4:29 pm
Technical01-Aug-2025, 9:07 am
Financial
AwardCompleted

A tender has been published for Geological Survey Of India (gsi) Manual Core Splitter, Manual Hydraulic Core Splitter in KAMRUP, ASSAM. Quantity: 2 by. Submission Deadline: 08-01-2025 17: 00: 00. Check eligibility and apply.

Authority & Contact

Technical Results

S.No Seller Item Date Status
1
BHARAT ENGINEERING STORES CORPORATION   Under PMA
Make : BESCO Model : MANUAL CORE SPLITTER Title : Manual Core Splitter08-01-2025 14:37:24
2
ELOQUENT TECHNOLOGY   Under PMA
Make : ELOQUENT Model : Manual Core Splitter Title : Manual Core Splitter08-01-2025 15:30:06
3
GEOS MINING CONSULTANT LLP   Under PMA
Make : BESCO Model : MANUAL CORE SPLITTER Title : Manual Core Splitter08-01-2025 14:11:53
4
LAPIS LAZULI   Under PMA
Make : BESCO Model : Manual Hydraulic Core Splitter Title : Manual Hydraulic Core Splitter08-01-2025 16:44:16
5
ROCK DRIL (INDIA)   Under PMA
Make : ROCKDRIL Model : ROCKDRIL Title : Manual Core Splitter06-01-2025 14:34:25

Financial Results

Rank Seller Price Item
L1
BHARAT ENGINEERING STORES CORPORATION(MII)   Under PMA
Item Categories : Manual Core Splitter,Manual Hydraulic Core Splitter
L2
ELOQUENT TECHNOLOGY (MSE,MII)( MSE Social Category:General )    Under PMA
Item Categories : Manual Core Splitter,Manual Hydraulic Core Splitter

Tender Data

Bid Details

Quantity

2

Category

Manual Hydraulic Core Splitter

Bid Type

Two Packet Bid

Bid Validity

60 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Requirements

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Manual Core Splitter , Manual Hydraulic Core Splitter

Authority Records

MINISTRY OF MINESGEOLOGICAL SURVEY OF INDIA

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-7268412.pdf

Main Document

Other Documents

OTHER

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Required Documents

1

Experience Criteria

2

Certificate (Requested in ATC)

3

Additional Doc 1 (Requested in ATC)

4

Additional Doc 2 (Requested in ATC)

5

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

6

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Frequently Asked Questions

Key insights about ASSAM tender market

FAQs

Details are provided in the tender document.

What are the eligibility criteria for this tender?

To be eligible, bidders must have at least 3 years of experience supplying similar equipment to government organizations. Additionally, MSEs are exempt from the turnover and experience criteria, whereas startups must fulfill these criteria.

How do I prove my eligibility as a Micro or Small Enterprise?

MSEs can prove their eligibility by obtaining a valid Udyam Registration and providing sufficient documentation that adheres to the MSE requirements outlined in the tender.

Can I submit my documents in any format?

Documents should be submitted in PDF or any acceptable digital format defined in the tender documentation. Ensure all documents are clear and legible.

What are the specific technical requirements for the Manual Core Splitter?

Bidders must comply with the technical specifications mentioned in the linked specification documents and must meet quality and performance standards.

How is the financial eligibility assessed?

The financial eligibility includes not requiring an Earnest Money Deposit and providing an ePBG of 2% of the bid value, along with compliance with all financial provisions mentioned in the tender document.

What is the process for submitting my bid?

Bids must be submitted online via the designated portal before the bid end date. Ensure that all required documents are included as attachments with your bid submission.

What are the key timelines for this tender?

The key timelines include the bid end date on 08-01-2025, with bid opening following immediately at 17:30 on the same day.

How will the evaluation process work?

The evaluation will focus on total value-wise assessments, ensuring compliance with technical specifications, and give preference to MSEs and items made in India.

What are the consequences if I fail to meet the deadlines?

Failure to comply with defined deadlines may lead to disqualification from the bidding process and a withdrawal of the bid acceptance.

Are there any special provisions for startups?

No, startups are not exempt from the experience and turnover criteria. They must meet all requirements as specified in the tender.

What documentation do I need for exemptions from experience criteria?

Bidders seeking exemptions must upload the necessary supporting documents that validate their eligibility for exemption evaluation by the buyer.

Who can I contact for assistance with the tender?

For assistance, you can contact the designated official at [email protected] for queries related to the tender specifics and submission process.

How will the awarded contract be executed?

Once the bid is awarded, the contract execution will include product supply, installation, testing, and operator training within the agreed timeline.

Is there a preference for local suppliers?

Yes, preference will be given to local suppliers under the Make in India initiative, with specific documentation required to establish local content proportions.

Can I adjust my bid after submission?

Once the bid is submitted, adjustments are generally not permitted. It is crucial to ensure that all information and documentation are accurate before submission.