TenderDekho Logo
Active GEM

Open Tender for High Mast Lighting Tower for large area with LED Flood Lighting System,400 Watt LED flood light wit in KARBI ANGLONG, ASSAM

Bid Publish Date

29-Sep-2026, 11:29 am

Bid End Date

16-Oct-2026, 2:00 pm

EMD

₹87,000

Progress

Issue29-Sep-2026, 11:29 am
AwardPending

Assam Power Generation Corporation Limited invites bids for High Mast Lighting Tower for large area with LED Flood Lighting System (Q3), 400 Watt LED flood light with 150 lumen watt, Aluminum armoured cables 16 sq mm 4 core from the power source to Feeder Panel, 2 point 5mm 3 core copper round flexible cable with lugs and other electrical accessories for luminaires wiring with lug and accessories, GI Pipe Earthing with 3 mtr long 40 mm GI pipe with 25 X 3 mm GI flats, Time Switch for automatic switching of luminaires as Spares in KARBI ANGLONG, ASSAM. Quantity: 1026. Submission Deadline: 16-10-2026 14: 00: 00. Submit your proposal before the deadline.

Advertisement

Tender Data

Bid Details

Quantity

1026

Category

High Mast Lighting Tower for large area with LED Flood Lighting System

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

No

MSE Purchase Preference

No

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

21

Past Performance

80 %

Experience Required

1 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

High Mast Lighting Tower for large area with LED Flood Lighting System (Q3) , 400 Watt LED flood light with 150 lumen watt , Aluminum armoured cables 16 sq mm 4 core from the power source to Feeder Panel , 2 point 5mm 3 core copper round flexible cable with lugs and other electrical accessories for luminaires wiring with lug and accessories , GI Pipe Earthing with 3 mtr long 40 mm GI pipe with 25 X 3 mm GI flats , Time Switch for automatic switching of luminaires as Spares

Advisory Bank

AXIS BANK LTD

Payment Timelines

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

60

Delivery Locations

1

Delivery Cities

West Karbi Anglong

Delivery Pincodes

782450

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Joseph Uddin782450,Karbi Langpi Hydro Electric Project, APGCL, Lengery, P.O. AmtrengWest Karbi AnglongAssam782450460-

Authority Records

POWER DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-9947100.pdf

Main Document

Other Documents

OTHER

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Office Name

Apgcl Bijulee Bhawan Guwahati

Grievance Contact

[email protected]

Bill of Quantities (BOQ) 5 Items Sign in for GEM prices

#1

400 Watt LED flood light with 150 lumen watt

400 Watt LED flood light with 150 lumen watt

12 nos Delivery: 60 days
#2

Aluminum armoured cables 16 sq mm 4 core from the power source to Feeder Panel

Aluminum armoured cables 16 sq mm 4 core from the power source to Feeder Panel

800 meter Delivery: 60 days
#3

2 point 5mm 3 core copper round flexible cable with lugs and other electrical accessories for luminaires wiring with lug and accessories

2 point 5mm 3 core copper round flexible cable with lugs and other electrical accessories for luminaires wiring with lug and accessories

200 meter Delivery: 60 days
#4

GI Pipe Earthing with 3 mtr long 40 mm GI pipe with 25 X 3 mm GI flats

GI Pipe Earthing with 3 mtr long 40 mm GI pipe with 25 X 3 mm GI flats

8 nos Delivery: 60 days
#5

Time Switch for automatic switching of luminaires as Spares

Suitable for supplied High Mast System

2 nos Delivery: 60 days

Categories 27

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

Additional Doc 1 (Requested in ATC)

7

Additional Doc 2 (Requested in ATC)

8

Additional Doc 3 (Requested in ATC)

9

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

10

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Advertisement