Bid Publish Date
03-Sep-2026, 11:23 am
Bid End Date
14-Sep-2026, 10:00 am
Location
Progress
RAThe Indian Air Force, Department Of Military Affairs, invites bids for a Pontoon Platform in Kerala, with delivery, installation, testing and commissioning as scope. The procurement emphasizes OEM/authorized reseller execution, non-toxic materials, and service-center coverage in the consignee state. A key option allows up to 25% quantity variation during contract and currency, with delivery time recalculation based on increased quantity. End User Certificate handling and in-country aftersales support are required where applicable. The purchase requires adherence to end-to-end installation, training if included, and compliance with non-obsolescence for at least 5 years post-bid. Unique address for delivery/installation is specified as AFSARTAC, Lake Sagar Resort, Kappil, Paravoor, Kollam, Kerala.
This tender emphasizes regulatory compliance, strong aftersales presence, and material safety, guiding bidders to align with IAF expectations and local service capabilities. bidders should prepare OEM authorization, service-center details, and EMD/financials as per terms.
Pontoon Platform supply, installation, testing and commissioning
Delivery location: AFSARTAC, Lake Sagar Resort, Kappil, Paravoor, Kollam, Kerala
OEM/OEM-certified resource required for installation and training
Functional service center coverage in the consignee state
Non-toxic materials; MSDS provided for toxic substances
5 years residual market life; not declared end-of-life by OEM
Imported items require Indian registered office for aftersales service
Option for quantity variation up to 25% with corresponding delivery time adjustments
End User Certificate to be provided in buyer’s standard format
OEM/OEM-certified resource required for installation, testing and training
Must have a functional service centre in the consignee state
5 years residual market life; no OEM end-of-life declaration
Non-toxic material requirement; MSDS where applicable
Not specified in tender data; verify with buyer terms and EMD requirements
Delivery period can be extended proportionally for increased quantity; minimum 30 days
Not detailed in provided data; refer to buyer added terms for LD conditions
Not under liquidation or similar proceedings
Must have OEM authorization or be OEM-certified reseller
Functional service center in the state of the consignee
Start
30-Sep-2026, 6:00 pm
End
01-Oct-2026, 6:00 pm
Duration: 24 hours
Reverse Auction Document
✅ RA concluded. Check financial results for final rankings.
Quantity
40
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Min. Avg. Annual Turnover
2
OEM Avg. Turnover
15
Past Performance
20 %
Warranty Period
7 days
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Pontoon Platform (Q3)
Advisory Bank
State Bank of India
ePBG Percentage
5%
ePBG Duration (Months)
14
Max Delivery Days
30
Delivery Locations
1
Delivery Cities
Thiruvananthapura m
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Thiruvananthapura m | Thiruvananthapura m | - | - | 40 | 30 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
GST registration certificate
PAN card
Experience certificates for similar Pontoon Platform projects
Financial statements (bank statements / audited balance sheet)
EMD/Security deposit documents (as applicable)
Technical bid documents demonstrating OEM authorization
OEM authorization/certificates for reseller/partner
End User Certificate (buyer format)
Key insights about KERALA tender market
Bidders must submit GST, PAN, experience certificates, financials, and EMD documents. Provide OEM authorization and ensure OEM-certified installation personnel. End User Certificate must be provided in the buyer's format. Ensure service center presence in Kerala and non-toxic material compliance, with installation at AFSARTAC, Lake Sagar Resort.
Required documents include GST registration, PAN card, company financial statements, experience certificates for similar projects, EMD/Security deposit, OEM authorization, technical bid documents, and End User Certificate in the buyer format. All documents should reflect compliance with the OEM and service-center requirements.
Installation must be performed by OEM-certified personnel or an authorized reseller. Training may be provided by OEM resources. Delivery and installation location is Kerala at AFSARTAC, Lake Sagar Resort, with testing and commissioning included in scope. A functional service center in Kerala is mandatory for carry-in warranty scenarios.
Bidders must ensure non-toxic materials and provide MSDS for toxic substances. Equipment should comply with OEM safety standards and be supported by an Indian registered office for post-sales service if imported. Ensure equipment has at least 5 years residual market life.
The purchaser reserves the right to increase or decrease the quantity by up to 25% of bid quantity at contract placement and during the currency at contracted rates. Delivery time adjusts proportionally, with a minimum extension of 30 days.
Bidders must demonstrate a functional service center in Kerala and, for imported items, a registered Indian office of the OEM. Provide service-center contact details and support commitments in the bid and ensure on-site installation, testing, and commissioning capabilities.
Delivery/installation is required at the指定 location: AFSARTAC, Lake Sagar Resort, Kappil, Paravoor, Kollam, Kerala. Delivery period can extend following the option clause, with a minimum 30 days after any quantity variation approval.
End User Certificate must be provided in the buyer’s standard format. Ensure the certificate accompanies the bid submission and aligns with the OEM authorization and installation scope. Verify format and recipient details in the buyer's term sheet.