TenderDekho Logo
Active GEM

Procurement Opportunity: Title-1,Title-2,Title-3,Title-4,Title-5,Title-6,Title-7,Title-8,Title-9,Title-10,Title-11,Title-12, in KHERI, UTTAR PRADESH

Bid Publish Date

21-Sep-2026, 5:23 pm

Bid End Date

01-Oct-2026, 6:00 pm

EMD

₹1,05,000

Value

₹1,03,17,107

Location

KHERI , UTTAR PRADESH

Progress

Issue21-Sep-2026, 5:23 pm
AwardPending

Mvvnl announces a tender for Title-1, Title-2, Title-3, Title-4, Title-5, Title-6, Title-7, Title-8, Title-9, Title-10, Title-11, Title-12, Title-13, Title- 14, Title-15, Title-16, Title-17, Title-18, Title-19, Title-20, Title-21, Title-22, Title-23, Title-24, Title-25, Title-26, Title-27, Title-28, Title-29, Title-30, Title-31, Title-32, Title-33, Title-34, Title-35, Title-36, Title-37, Title-38, Title-39, Title-40, Title-41 in KHERI, UTTAR PRADESH. Quantity: 20825. Submission Deadline: 01-10-2026 18: 00: 00. Last date to apply is approaching fast!

Advertisement

Tender Data

Bid Details

Quantity

20825

Bid Validity

105 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

Yes

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Item Category

Title-1 , Title-2 , Title-3 , Title-4 , Title-5 , Title-6 , Title-7 , Title-8 , Title-9 , Title-10 , Title-11 , Title-12 , Title-13 , Title- 14 , Title-15 , Title-16 , Title-17 , Title-18 , Title-19 , Title-20 , Title-21 , Title-22 , Title-23 , Title-24 , Title-25 , Title-26 , Title-27 , Title-28 , Title-29 , Title-30 , Title-31 , Title-32 , Title-33 , Title-34 , Title-35 , Title-36 , Title-37 , Title-38 , Title-39 , Title-40 , Title-41

Advisory Bank

ICICI

ePBG Percentage

5%

ePBG Duration (Months)

12

Payment Timelines

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

45

Delivery Locations

1

Delivery Cities

Kheri

Delivery Pincodes

262701

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Shailendra Kumar262701,Office of the Superintending Engineer, Electricity Distribution Circle Near Punjabi Colony Gate Rajghar, Lakhimpur Kheri 262701KheriUttar Pradesh262701845-

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-9908023.pdf

Main Document

Other Documents

OTHER

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Mvvnl

Department

MADHYANCHAL VIDYUT VITARAN NIGAM LIMITED LUCKNOW

Office Name

4 A Gokhale Marg Lucknow

Grievance Contact

[email protected]

Bill of Quantities (BOQ) 41 Items Sign in for GEM prices

#1

Title-1

PCC pole 9 m long

8 nos Delivery: 45 days
#2

Title-2

STP 11 mtr long

12 nos Delivery: 45 days
#3

Title-3

ACSR Dog conductor.

160 mtr Delivery: 45 days
#4

Title-4

33 KV XLPE Cable (3x120 sq. mm)

7,000 mtr Delivery: 45 days
#5

Title-5

33 KV O/D Cable box size 3x120 sq. mm

40 nos Delivery: 45 days
#6

Title-6

33 KV I/D Cable box size 3x120 sq. mm

15 nos Delivery: 45 days
#7

Title-7

34 KV I/D Straight through size 3x120 sq. mm

12 nos Delivery: 45 days
#8

Title-8

33 KV line isolator

1 nos Delivery: 45 days
#9

Title-9

33 KV Metering pilfer proof CTR 30/1 amp

1 nos Delivery: 45 days
#10

Title-10

3-Ph 4 wire 33 KV feeder meter HT TVM meter

1 nos Delivery: 45 days
#11

Title-11

Other Line Material. (T-off, dropper, top channel, disc insulator with fitiing, pin insulator with fitting , stay complete, earthing complete material etc.)

11 qtl Delivery: 45 days
#12

Title-12

Fixing,errection and grouting of double pole on 9/11 mtr. Long PCC/STP pole along with fixing of necessary hardware of doble pole alongwith necessary pin insulators/ disc insulators as per RESPO specification and direction of E/I.

5 nos Delivery: 45 days
#13

Title-13

Grouting of STP 11 m long poles including fixing of necessary clamps. Accessories required including its grouting by civil material (Sand brick ballast cement).

34 nos Delivery: 45 days
#14

Title-14

Ordinary earthing by MS earth Rod 2500mm long as per RESPO Schedule. Only GI wireand Earth rod shall be supplied by the department.

102 nos Delivery: 45 days
#15

Title-15

Grouting and Nuzzling of stay set complete including fixing of necessary clamps. Accessories required including its grouting by civil material (Sand brick ballast cement). Only Stay wire shall be supplied by the Department.

8 nos Delivery: 45 days
#16

Title-16

Laying and sagging of 3 phase 3 wire 33KV line on ACSR weasel/rabbit/Raccoon/Dog conductor as per RESPO specification and direction of E/I.

160 mtr Delivery: 45 days
#17

Title-17

Laying of 33KV XLPE cable (3x120 sq. mm) by Horizontal Directional Drilling (HDD) method, passed through a 140 mm diameter MS HDPE pipe with providing all related TandP and materials. The entire cable laying work shall be executed as per RESPO specifications

6,240 mtr Delivery: 45 days
#18

Title-18

Muffling/Nuzzling of poles upto 1.5 ft height of pole from ground level

26 nos Delivery: 45 days
#19

Title-19

Road restoration Charges for Pucca/footpath road with all TandP provided by the contractor

100 mtr Delivery: 45 days
#20

Title-20

Hoisting of 33KV XLPE Cable passed through G.I pipe 6 dia at double poles which is duly clamped with the pole at the bottom, middle, and top. with providing all related TandP and materials The entire cable laying work shall be executed as per RESPO specifications

114 mtr Delivery: 45 days
#21

Title-21

Work for earthing of metering pilfer, 33 Kv line isolator structure with G.I. Pipe type earthing pipe size 3cm dia from ground up-to the water level (Minimum 20 feet deep) as per standard practice (All materials shall be provided by the contractor)

4 job Delivery: 45 days
#22

Title-22

Construction of Bay structure for installation of 33 KV line isolator and installation of isolator alongwith grouting of the structure, complete job with all TandP provided by contractor.

1 job Delivery: 45 days
#23

Title-23

Installation of 33 KV metering pilfer CTR 30/1 amp along with all TandP

1 job Delivery: 45 days
#24

Title-24

Fixing of 33 KV Cable joining kit O/D.

40 nos Delivery: 45 days
#25

Title-25

Fixing of 33 KV Cable joining kit I/D.

15 nos Delivery: 45 days
#26

Title-26

Fixing of 33 KV Cable joining kit Straight through

12 nos Delivery: 45 days
#27

Title-27

Dismantling of old and damaged ST poles with unloading/unloading of scrap from site to Electricity Distribution store Lakhimpur

10 nos Delivery: 45 days
#28

Title-28

Consultation and cordination for railway crossing with providing route maps and related documents

1 job Delivery: 45 days
#29

Title-29

Consultation and cordination for Electrical Safety charges with providing route maps and related documents

1 job Delivery: 45 days
#30

Title-30

Supply and fixing of Stay insulator

8 nos Delivery: 45 days
#31

Title-31

Supply and fixing of Stay Clamp

8 nos Delivery: 45 days
#32

Title-32

Supply and fixing of Earth wire clamp with bolt andnuts

102 nos Delivery: 45 days
#33

Title-33

Supply and fixing of G.I Pipe 6 inch dia

114 mtr Delivery: 45 days
#34

Title-34

Supply and fixing of clamp for G.I Pipe 6 inch dia

72 nos Delivery: 45 days
#35

Title-35

Supply of HDPE pipe 140 mm

6,240 mtr Delivery: 45 days
#36

Title-36

Supply and fixing of Danger board with clamp, bolts and nuts

17 nos Delivery: 45 days
#37

Title-37

Supply and fixing of PG Clamp for dog with bolts andnuts

12 nos Delivery: 45 days
#38

Title-38

Supply and fixing of Clamps with bolts and nuts for T-off, dropper , top channel etc

38 nos Delivery: 45 days
#39

Title-39

Supply and fixing of bolt and nuts for complete setting.

15 kg Delivery: 45 days
#40

Title-40

Supply and fixing of route board with clamps, nuts and bolts

30 nos Delivery: 45 days
#41

Title-41

Supply and fixing of warning tape

34 nos Delivery: 45 days

Categories 64

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Explore More Opportunities

Quick Access