Bid Publish Date
28-Feb-2025, 4:22 pm
Bid End Date
26-Mar-2025, 9:00 am
EMD
₹29,116
Location
Progress
Quantity
91
Bid Type
Two Packet Bid
Indian Army invites bids for ms pipe heavy grade in floors or fixed to walls and ceiling sizes 300 dia, ms pipes heavy grade in floors or fixed to walls and ceilings sizes 200 mm, butterfly valve with all fitting of size 300mm dia, strainer 300mm dia complete all as directed by engr in charge, strainer 200mm dia complete all as directed by engr in charge, excavating in trenches 1 point 5 m wide 1 point 5 in depth for foundation, returning filling leveling watering well ramming soil in layers, removing excavated materials not exceeding 50m depositing in CENTRAL DELHI, DELHI. Quantity: 91. Submission Deadline: 26-03-2025 09: 00: 00. Submit your proposal before the deadline.
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
ms pipe heavy grade in floors or fixed to walls and ceiling sizes 300 dia , ms pipes heavy grade in floors or fixed to walls and ceilings sizes 200 mm , butterfly valve with all fitting of size 300mm dia , strainer 300mm dia complete all as directed by engr in charge , strainer 200mm dia complete all as directed by engr in charge , excavating in trenches 1 point 5 m wide 1 point 5 in depth for foundation , returning filling leveling watering well ramming soil in layers , removing excavated materials not exceeding 50m depositing
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
ms pipe heavy grade in floors or fixed to walls and ceiling sizes 300 dia
supply and lay ms pipe heavy grade with all fittings laid in floors or fixed to walls and ceiling etc of sizes 300 dia complete all as directed by engr in charge
ms pipes heavy grade in floors or fixed to walls and ceilings sizes 200 mm
supply and lay ms pipes heavy garde with all fittings laid in floors or fixed to walls and ceilings etc of sizes 200 mm dia complete set all as directed by engr in charge
butterfly valve with all fitting of size 300mm dia
supply and replace butterfly valve with all fitting of size 300mm dia complete all as directed by engr in charge
strainer 300mm dia complete all as directed by engr in charge
supply and replace strainer 300mm dia complete all as directed by engr in charge
strainer 200mm dia complete all as directed by engr in charge
supply and replace strainer 200mm dia complete all as directed by engr in charge
excavating in trenches 1 point 5 m wide 1 point 5 in depth for foundation
excavating in trenches n exe 1 point 5 m wide n exe 1 point 5 in depth for foundation for shafts wells cesspits manhole pier holes n exe 10 sq m on plan and n exe 1 point 5 m in depth
returning filling leveling watering well ramming soil in layers
returning filling including leveling watering and well ramming soil in layers not exceeding 25cm complete all as directed by engr in charge
removing excavated materials not exceeding 50m depositing
removing the excavated materials not exceeding 50m and depositing where directed at level not exceeding 1 point 5 m above the starting level complete all as directed by engr in charge
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | ms pipe heavy grade in floors or fixed to walls and ceiling sizes 300 dia | supply and lay ms pipe heavy grade with all fittings laid in floors or fixed to walls and ceiling etc of sizes 300 dia complete all as directed by engr in charge | 32 | rm | age123@ | 30 | |
| 2 | ms pipes heavy grade in floors or fixed to walls and ceilings sizes 200 mm | supply and lay ms pipes heavy garde with all fittings laid in floors or fixed to walls and ceilings etc of sizes 200 mm dia complete set all as directed by engr in charge | 12 | rm | age123@ | 30 | |
| 3 | butterfly valve with all fitting of size 300mm dia | supply and replace butterfly valve with all fitting of size 300mm dia complete all as directed by engr in charge | 2 | each | age123@ | 30 | |
| 4 | strainer 300mm dia complete all as directed by engr in charge | supply and replace strainer 300mm dia complete all as directed by engr in charge | 2 | each | age123@ | 30 | |
| 5 | strainer 200mm dia complete all as directed by engr in charge | supply and replace strainer 200mm dia complete all as directed by engr in charge | 1 | each | age123@ | 30 | |
| 6 | excavating in trenches 1 point 5 m wide 1 point 5 in depth for foundation | excavating in trenches n exe 1 point 5 m wide n exe 1 point 5 in depth for foundation for shafts wells cesspits manhole pier holes n exe 10 sq m on plan and n exe 1 point 5 m in depth | 21 | cum | age123@ | 30 | |
| 7 | returning filling leveling watering well ramming soil in layers | returning filling including leveling watering and well ramming soil in layers not exceeding 25cm complete all as directed by engr in charge | 19 | cum | age123@ | 30 | |
| 8 | removing excavated materials not exceeding 50m depositing | removing the excavated materials not exceeding 50m and depositing where directed at level not exceeding 1 point 5 m above the starting level complete all as directed by engr in charge | 2 | cum | age123@ | 30 |
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Extended Deadline
26-Mar-2025, 9:00 am
Opening Date
26-Mar-2025, 9:30 am
Key insights about DELHI tender market
The eligibility requirements include being a registered entity, possessing necessary industry experience, and adherence to relevant laws and regulations. Bidders should ensure they have the technical capability to meet the specific demands of the project, as normal compliance with quality and performance standards is essential.
Bidders must submit several documents including a valid business license, proof of previous work, and relevant certificates. It is advisable to also include any certifications that demonstrate compliance with industry standards, ensuring all required documentation adheres to the format specified in the tender.
The evaluation process involves assessing technical specifications, compliance with the outlined criteria, and pricing. Bids are compared based on their adherence to requirements, with a focus on quality and value for money. The scoring matrix used during this evaluation will help ensure an objective selection of the winning bid.
Once the project is awarded, payments will typically adhere to milestone-based structures detailed in the contract. This may involve upfront payments, progress payments upon reaching specified milestones, and final settlement upon completion and acceptance of the project deliverables.
Yes, MSEs may benefit from specific provisions encouraging their participation. This includes potential relaxation of certain eligibility criteria, assistance with documentation requirements, and possibly lower performance security deposits, enabling them easier access to government tenders.
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS