Indian Air Force Isolation Transformer 2 KVA Tender India 2026 ISOLATION TRANSFORMER 2 KVA
Indian Air Force
Bid Publish Date
01-Jul-2026, 5:36 am
Bid End Date
23-Jul-2026, 2:00 pm
Location
Progress
Quantity
1
Bid Type
Single Packet Bid
Organization: Indian Space Research Organization (Department of Space). The procurement seeks Supply, Installation, Testing and Commissioning of a 50 KVA Isolation Power Transformer. Location is not specified. Estimated quantity is not stated; however, the scope includes full lifecycle delivery at contract, with a 1-year warranty post-acceptance. Unique terms include an option clause allowing up to 25% quantity variation during both initial and currency of contract, with delivery extensions calculated from original delivery period. A data sheet and OEM authorization are mandatory to verify technical alignment. This tender mandates alignment with data-sheet integrity and OEM credentials to prevent bid rejection. The scope emphasizes end-to-end supply chain and field deployment responsibilities to ISRO standards.
Product: 50 KVA Isolation Power Transformer
Scope: Supply, Installation, Testing and Commissioning
Warranty: 1 year from final acceptance or after installation/commissioning
Option clause: up to 25% quantity variation; delivery time adjustments rules
Documentation: Upload Data Sheet; OEM authorization required
Option Clause allows ±25% quantity and extended delivery with formula-based timing
Data Sheet verification is mandatory to prevent bid rejection
OEM authorization required for distributors; submit complete contact details
Warranty period is 1 year from acceptance/installation/completion
Scope includes installation and commissioning; bid price must include all costs
1 year warranty from final acceptance or after installation/commissioning
Purchaser may increase quantity up to 25% during contract; delivery period adjusted accordingly
Bid data sheet must match product specifications; mismatch may lead to rejection
Authorized OEM or OEM-authorized distributor with valid authorization
Experience in supply, installation, testing and commissioning of transformers
Financial ability to undertake procurement with warranty obligations
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Supply and Installation of 50 KVA Isolation Power Transformer
Advisory Bank
State Bank of India
ePBG Percentage
3%
ePBG Duration (Months)
14
Max Delivery Days
90
Delivery Locations
1
Delivery Cities
Thiruvananthapuram
Delivery Pincodes
695022
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Jomin Jose | 695022,CENTRAL STORES, RFF AREA, VIKRAM SARABHAI SPACE CENTRE, ISRO PO | Thiruvananthapuram | Kerala | 695022 | 1 | 90 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Air Force
Prasar Bharati Broadcasting Corporation Of India
Hmt Machine Tools Limited
PANCHKULA, HARYANA
Bharat Earth Movers Limited (beml)
KOLAR, KARNATAKA
Indian Air Force
KANCHIPURAM, TAMIL NADU
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Data Sheet of the product offered (uploaded with bid)
OEM authorization / Manufacturer authorization form
Experience certificates demonstrating capability for supply/install/commission
Financial statements or turnover documents as applicable
Technical bid documents and compliance certificates (if any)
Key insights about KERALA tender market
Bidders must submit Data Sheet with bid, provide OEM authorization, and ensure compliance with ISRO procurement terms. The scope covers supply, installation, testing and commissioning, with a 1-year warranty. Include all costs in bid and be prepared for a possible 25% quantity variation under the option clause.
Required documents include GST certificate, PAN, Data Sheet, OEM authorization, experience certificates, and financial statements. Technical bid documents and compliance certificates should be attached. Ensure data sheet matches offered transformer specifications to avoid rejection.
Delivery terms allow up to 25% quantity variation with calculated extension time. Minimum extension is 30 days; if original period is shorter, extension equals the original period. Delivery starts from the last date of the original delivery order.
A 1-year warranty is required from the date of final acceptance or post-installation/completion of testing and commissioning, whichever occurs later. Bidders should plan for warranty service during this period.
OEM authorization confirms the bidder is authorized to supply and service the transformer. Include full details (name, designation, address, email, phone) to meet eligibility for the procurement.
Upload the Data Sheet with the bid and verify all parameters match the offered transformer specifications. Any unexplained mismatch can lead to bid rejection; cross-check electrical ratings, insulation, and installation requirements.
Scope includes supply, installation, testing and commissioning of the 50 KVA isolation transformer. The price must cover all costs, including field testing, acceptance, and warranty activation post-completion.
Quantity variation can occur up to 25% during contract placement or during the currency of the contract at contracted rates, subject to delivery-time adjustments as defined by the option clause.
Indian Air Force
📍 LEH, JAMMU & KASHMIR
E-IN-C BRANCH - MILITARY ENGINEER SERVICES
📍 PUNE, MAHARASHTRA
Bharat Dynamics Limited
📍 MEDAK, TELANGANA
Prasar Bharati Broadcasting Corporation Of India
Iter India Ipr
📍 AHMEDABAD, GUJARAT
Sign up now to access all documents
Main Document
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS