PULLEY, LAGGING SHEET, CERAMIC, 1600MM-M5505326070
Bharatiya Rail Bijlee Company Limited
AURANGABAD, BIHAR
Bid Publish Date
20-Apr-2026, 5:36 pm
Bid End Date
23-Jun-2026, 6:00 pm
EMD
₹15,246
Location
Progress
Quantity
70
Bid Type
Two Packet Bid
Gujarat State Electricity Corporation Limited (GSECL), Vadodara, invites bids for rubber lagging sheet for pulley lagging at CHP GTPS in Gandhinagar, Gujarat. The bid quantity is subject to a purchase quantity option up to 25%, with contracted rates applying during extensions. Bidder must submit EMD₹15,246 and adhere to ATC1 terms. The procurement targets material for turbine/coal handling operations at GTPS, with no explicit technical specifications published in the tender data. The opportunity is structured to accommodate variable demand within the contract period, ensuring continuity of belt/pulley protection. Bidders should consider potential delivery-time adjustments and extendable windows if the option clause is exercised.
Product/service: rubber lagging sheet for pulley lagging
Quantity/scale: 25% quantity variation option during/within contract
EMD amount: ₹15,246
Estimated value: not disclosed
Standards/certifications: not specified; ensure OEM compatibility
Delivery requirements: extension period minimum 30 days, calculated as (increased quantity / original quantity) × original delivery period
EMD required: ₹15,246 as per ATC1
Quantity variation: up to 25% during contract with original rates
Delivery window: minimum 30-day extension and calculation method
ATC1 compliance: mandatory for bid submission
Payment terms are as per ATC1; ensure EMD submission and alignment with supplier payment schedule
Delivery period starts from last date of original delivery order; option clause may extend delivery period with recalculated timelines
Details not provided; verify LD terms in ATC1 and contract
Supplier must submit EMD ₹15,246 as per ATC1
GST registration and PAN provided
Experience in supplying rubber lagging sheets or plant-protective materials
Compliance with ATC1 terms and conditions
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Supply of Rubber lagging sheet for pulley Lagging at CHP GTPS.
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Bharatiya Rail Bijlee Company Limited
AURANGABAD, BIHAR
Durgapur Steel Plant
Uranium Corporation Of India Limited
CUDDAPAH, ANDHRA PRADESH
Western Coalfields Limited
YAVATMAL, MAHARASHTRA
N/A
KOKRAJHAR, ASSAM
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
EMD submission proof (DD/online payment receipt)
Technical bid documents aligned with ATC1
OEM authorizations or certificates (if required by ATC1)
Experience certificates for relevant rubber lagging sheet supply
Financial statements (as per tender norms if requested)
Extended Deadline
23-Jun-2026, 6:00 pm
Opening Date
23-Jun-2026, 6:30 pm
Extended Deadline
09-Jun-2026, 6:00 pm
Opening Date
09-Jun-2026, 6:30 pm
Extended Deadline
25-May-2026, 6:00 pm
Opening Date
25-May-2026, 6:30 pm
Key insights about GUJARAT tender market
Bidders should prepare EMD of ₹15,246 as per ATC1, submit GST, PAN, and OEM authorizations if required, and align with ATC1 technical bid documents. Ensure compliance with 25% quantity variation and delivery-extension rules; confirm delivery feasibility post-last delivery order date.
Required documents include GST certificate, PAN, EMD proof, technical bid per ATC1, OEM authorizations (if specified), and experience certificates showing relevant lagging sheet supply. Financial statements may be requested; ensure all documents are legible and valid at bid submission.
Delivery terms follow the option clause allowing up to 25% quantity variation. The delivery period starts from the last date of the original delivery order, with extended periods calculated as (increased quantity/original quantity) × original period, minimum 30 days.
EMD required is ₹15,246 as per ATC1; bidders must submit proof of payment with the bid. Ensure the EMD is valid for the duration of bid evaluation and contract award.
The tender data does not specify standards. Bidders should reference OEM recommendations and plant-grade material specifications; ensure alignment with ATC1 and any supplier verification required by GSECL.
Delivery timelines are determined by the original delivery order date; extended delivery, if exercised, uses the calculated extension with a minimum 30 days. Confirm actual order dates in the final contract notice.
Eligibility includes valid GST and PAN, EMD submission of ₹15,246, prior experience in supplying protective rubber lagging or related plant components, and compliance with ATC1 terms for bid submission and contract execution.
Provide GST certificate, PAN card, EMD receipt, OEM authorizations (if required), experience certificates for similar lagging sheet supply, and financial statements as demanded by ATC1; ensure documents are current and match bid details.
National Aluminium Company Limited, Bhubaneswar
📍 KORAPUT, ODISHA
Bharat Dynamics Limited
📍 HYDERABAD, TELANGANA
Chittaranjan Locomotive Works
📍 BARDHAMAN, WEST BENGAL
Hindustan Aeronautics Limited (hal)
📍 NASHIK, MAHARASHTRA
Rourkela Steel Plant
📍 SUNDERGARH, ODISHA
Sign up now to access all documents
Main Document
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS