TenderDekho Logo
GEM

Invitation to Bid - 420 kV CT,245 kV CT,245 kV CT,420 kV CT,420 kV CT,420 kV CT,420 kV CT,420 kV CT,245 kV CT,245 kV CT

Bid Publish Date

13-Jul-2026, 11:45 am

Bid End Date

03-Aug-2026, 11:00 am

Progress

Issue13-Jul-2026, 11:45 am
AwardPending
Explore all 6 tabs to view complete tender details

Quantity

325

Category

420 kV CT

Bid Type

Two Packet Bid

Categories 11

Power Grid Corporation Of India Limited announces a tender for 420 kV CT, 245 kV CT, 245 kV CT at Ballabhgarh, 420 kV CT at Bhiwadi, 420 kV CT at Kolar. Quantity: 325. Submission Deadline: 03-08-2026 11: 00: 00. Last date to apply is approaching fast!

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

420 kV CT , 245 kV CT , 245 kV CT at Ballabhgarh , 420 kV CT at Bhiwadi , 420 kV CT at Kolar

Advisory Bank

State Bank of India

ePBG Percentage

5%

ePBG Duration (Months)

26

Payment Timelines

Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Pre-Bid & Qualification

Pre-Bid Date

24-07-2026 11:00:00

Pre-Bid Venue

online

Delivery Details

Max Delivery Days

365

Delivery Locations

1

Delivery Cities

Meerut

Delivery Pincodes

250221

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Rohit Gupta250221,Powergrid Corporation of India Limited, Meerut Substation, Village-Mataur, Post-Daurala, Meerut, Uttar Pradesh-250221MeerutUttar Pradesh25022118365-

Authority Records

MINISTRY OF POWERPOWER GRID CORPORATION OF INDIA LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-9532132.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

420 KV CT for Powergrid Satna Substation,420 KV CT for Powergrid Bina Substation,245 KV CT for Powe

Power Grid Corporation Of India Limited

Posted: 3 October 2025
Closed: 1 December 2025
GEM

GEN SET 4.5 KVA,GEN SET 4.5 KVA,GEN SET 4.5 KVA,GEN SET 4.5 KVA,GEN SET 4.5 KVA,GEN SET 5 KVA,GEN S

Indian Army

Sri Ganganagar, RAJASTHAN

Posted: 10 June 2026
Closed: 23 June 2026
GEM

145 kV, 300 A CT,72.5kV, 50A CT,72.5 kV, 3000 A CT,72.5kV, 50A CT,72.5kV, 50A CT,72.5kV, 50A CT,72.

Power Grid Corporation Of India Limited

Posted: 20 December 2024
Closed: 18 February 2025
GEM

RECD KIT 62.5 KVA,RECD KIT 82.5 kva,RECD KIT 125 kva,RECD KIT 140 kva,RECD KIT 250 kva,RECD KIT 320

Delhi Development Authority

WEST DELHI, DELHI

Posted: 6 January 2026
Closed: 27 January 2026
GEM

RECD KIT 82.5 KVA,RECD KIT 125 kva,RECD KIT 140 kva,RECD KIT 250 kva,RECD KIT 400 kva,RECD KIT 500

Delhi Development Authority

WEST DELHI, DELHI

Posted: 6 January 2026
Closed: 27 January 2026
GEM

Bill of Quantities (BOQ) 35 Items Sign in for GEM prices

#1

420 kV CT

420kV, 3000A, 63kA Current Transformer with 120% extended current rating, common marshalling box (for each set of 3 CTs) and Terminal Connectors as per POWERGRID TS & SoW

18 ea Delivery: 365 days
#2

245 kV CT

245 kV, 1600A, 50KA, 1-Phase CurrentTransformer with 120% extended current rating common marshalling box (for each set of 3 CTs) and Terminal Connectors as per POWERGRID TS & SoW

21 ea Delivery: 365 days
#3

245 kV CT

245 kV, 2500A, 50KA, 1-Phase CurrentTransformer with 150% extended current rating common marshalling box (for each set of 3 CTs) and Terminal Connectors as per POWERGRID TS & SoW

3 ea Delivery: 365 days
#4

420 kV CT

420kV, 3000A, 63kA Current Transformer with 120% extended current rating, common marshalling box (for each set of 3 CTs) and Terminal Connectors as per POWERGRID TS & SoW

3 ea Delivery: 365 days
#5

420 kV CT

420kV, 3000A, 63kA Current Transformer with 120% extended current rating, common marshalling box (for each set of 3 CTs) and Terminal Connectors as per POWERGRID TS & SoW

6 ea Delivery: 365 days
#6

420 kV CT

420kV, 3000A, 63kA Current Transformer with 120% extended current rating, common marshalling box (06 nos for the Consignee SS) and Terminal Connectors as per POWERGRID TS & SoW

13 ea Delivery: 365 days
#7

420 kV CT

420kV, 3000A, 63kA Current Transformer with 120% extended current rating, common marshalling box (for each set of 3 CTs) and Terminal Connectors as per POWERGRID TS & SoW

6 ea Delivery: 365 days
#8

420 kV CT

420kV, 3000A, 63kA Current Transformer with 120% extended current rating, common marshalling box (09 nos for the Consignee SS) and Terminal Connectors as per POWERGRID TS & SoW

18 ea Delivery: 365 days
#9

245 kV CT

245 kV, 1600A, 50KA, 1-Phase CurrentTransformer with 120% extended current rating common marshalling box (for each set of 3 CTs) and Terminal Connectors as per POWERGRID TS & SoW

3 ea Delivery: 365 days
#10

245 kV CT at Ballabhgarh

245 kV, 1600A, 50KA, 1-Phase CurrentTransformer with 120% extended current rating common marshalling box (for each set of 3 CTs) and Terminal Connectors as per POWERGRID TS & SoW

6 ea Delivery: 365 days
#11

245 kV CT

245 kV, 1600A, 50KA, 1-Phase CurrentTransformer with 120% extended current rating common marshalling box (for each set of 3 CTs) and Terminal Connectors as per POWERGRID TS & SoW

12 ea Delivery: 365 days
#12

420 kV CT at Bhiwadi

420kV, 3000A, 63kA Current Transformer with 120% extended current rating, common marshalling box (for each set of 3 CTs) and Terminal Connectors as per POWERGRID TS & SoW

21 ea Delivery: 365 days
#13

245 kV CT

245 kV, 1600A, 50KA, 1-Phase CurrentTransformer with 120% extended current rating common marshalling box (for each set of 3 CTs) and Terminal Connectors as per POWERGRID TS & SoW

21 ea Delivery: 365 days
#14

245 kV CT

245 kV, 2500A, 50KA, 1-Phase CurrentTransformer with 150% extended current rating common marshalling box (for each set of 3 CTs) and Terminal Connectors as per POWERGRID TS & SoW

3 ea Delivery: 365 days
#15

245 kV CT

245 kV, 1600A, 50KA, five core Current Transformer with extended current rating 120, marshalling box (for each set of 3 CTs) and Terminal Connectors as per POWERGRID TS & SoW

6 ea Delivery: 365 days
#16

420 kV CT

420 kV, 3000A, 63KAmp Six core Current Transformer with 120% extended current rating, common marshalling box (for each set of 3 CTs) and Terminal Connectors as per POWERGRID TS & SoW

15 ea Delivery: 365 days
#17

420 kV CT

420 kV, 3000A, 63KAmp Six core Current Transformer with 150% extended current rating, common marshalling box (for each set of 3 CTs) and Terminal Connectors as per POWERGRID TS & SoW

3 ea Delivery: 365 days
#18

420 kV CT

420 kV, 3000A, 63KAmp Six core Current Transformer with 120% extended current rating, common marshalling box (for each set of 3 CTs) and Terminal Connectors as per POWERGRID TS & SoW

2 ea Delivery: 365 days
#19

420 kV CT

420 kV, 3000A, 63KAmp Six core Current Transformer with 150% extended current rating, common marshalling box (for each set of 3 CTs) and Terminal Connectors as per POWERGRID TS & SoW

1 ea Delivery: 365 days
#20

420 kV CT

400KV 4000A, 63KA, 6 Cores (Core-1,2,5,6- PS, Core-3,4-0.2S) , Oil Filled CT, 120% extended current rating alongwith Terminal connector as per SoW (No MB)

1 ea Delivery: 365 days
#21

420 kV CT

400KV 4000A, 63KA, 6 Cores (Core-1,2,5,6- PS, Core-3,4-0.2S) Oil Filled CT, 120% extended current rating alongwith Terminal connector as per SoW (No MB)

1 ea Delivery: 365 days
#22

420 kV CT

400KV, 3000A, 63KA,6 Cores (Core-1,2,5,6- PS, Core-3,4-0.2S), Oil Filled, 120% extended current rating Alongwith Terminal connector as per SoW (No MB)

1 ea Delivery: 365 days
#23

420 kV CT

420kV, 3000A, 63kA Current Transformer with 120% extended current rating, common marshalling box (for each set of 3 CTs) and Terminal Connectors as per POWERGRID TS & SoW

6 ea Delivery: 365 days
#24

245 kV CT

245 kV, 1600A, 50KA, 1-Phase CurrentTransformer with 120% extended current rating common marshalling box (for each set of 3 CTs) and Terminal Connectors as per POWERGRID TS & SoW

6 ea Delivery: 365 days
#25

245 kV CT

245 kV, 1600A, 50KA, 1-Phase CurrentTransformer with 120% extended current rating common marshalling box (for each set of 3 CTs) and Terminal Connectors as per POWERGRID TS & SoW

3 ea Delivery: 365 days
#26

245 kV CT

245 kV, 2500A, 50KA, 1-Phase CurrentTransformer with 150% extended current rating and Terminal Connectors as per POWERGRID TS & SoW (No MB)

1 ea Delivery: 365 days
#27

420 kV CT

420kV, 3000A, 63kA Current Transformer with 120% extended current rating, common marshalling box (for each set of 3 CTs) and Terminal Connectors as per POWERGRID TS & SoW

24 ea Delivery: 365 days
#28

245 kV CT

245 kV, 1600A, 50KA, 1-Phase CurrentTransformer with 120% extended current rating common marshalling box (for each set of 3 CTs) and Terminal Connectors as per POWERGRID TS & SoW

21 ea Delivery: 365 days
#29

245 kV CT

245 kV, 2500A, 50KA, 1-Phase CurrentTransformer with 150% extended current rating common marshalling box (for each set of 3 CTs) and Terminal Connectors as per POWERGRID TS & SoW

3 ea Delivery: 365 days
#30

245 kV CT

245 kV, 2500A, 50KA, 1-Phase CurrentTransformer with 150% extended current rating and Terminal Connectors as per POWERGRID TS & SoW (No MB)

1 ea Delivery: 365 days
#31

420 kV CT

420kV, 3000A, 63kA Current Transformer with 120% extended current rating, common marshalling box (for each set of 3 CTs) and Terminal Connectors as per POWERGRID TS & SoW

18 ea Delivery: 365 days
#32

420 kV CT at Kolar

420kV, 3000A, 63kA Current Transformer with 120% extended current rating, common marshalling box (for each set of 3 CTs) and Terminal Connectors as per POWERGRID TS & SoW

42 ea Delivery: 365 days
#33

245 kV CT

245 kV, 1600A, 50KA, 1-Phase CurrentTransformer with 120% extended current rating common marshalling box (for each set of 3 CTs) and Terminal Connectors as per POWERGRID TS & SoW

12 ea Delivery: 365 days
#34

245 kV CT

245 kV, 2500A, 50KA, 1-Phase CurrentTransformer with 150% extended current rating common marshalling box (for each set of 3 CTs) and Terminal Connectors as per POWERGRID TS & SoW

3 ea Delivery: 365 days
#35

245 kV CT

245 kV, 2500A, 50KA, 1-Phase CurrentTransformer with 150% extended current rating and Terminal Connectors as per POWERGRID TS & SoW (No MB)

1 ea Delivery: 365 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Bidder Turnover

3

Certificate (Requested in ATC)

4

OEM Authorization Certificate

5

Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

6

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Similar Tenders

5 found
Urgent

245 kV Isolator at allahabad,245 kV Isolator,245 kV Isolator at kanpur,245 kV Isolator,245 kV Isola

Power Grid Corporation Of India Limited

⏰ Deadline: 2 days left
🛒 Type: Goods
View GEM

145 KV CB Clamp Panther,Flexible Copper Bond,120 KV LA Surge Counter at 132 kv auranga bad,120 KV L

Uttar Pradesh Power Corporation Limited (uppcl)

📍 MATHURA, UTTAR PRADESH

Est: ₹2.0 L
⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM

420 kV Circuit Breaker at Kishenpur, NR II region,420 kV Circuit Breaker at Malerkotla, NR II regio

Power Grid Corporation Of India Limited

⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM

420 kV Circuit Breaker,420 kV Circuit Breaker,420 kV Circuit Breaker,420 kV Circuit Breaker,420kV C

Power Grid Corporation Of India Limited

⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM

1 2 KVA UPS,2 2 KVA UPS,3 2 KVA UPS,4 2 KVA UPS,5 2 KVA UPS

High Court Of Andhra Pradesh

📍 GUNTUR, ANDHRA PRADESH

EMD: ₹30,000
⏰ Deadline: 3 weeks left
🛒 Type: Goods
View GEM