TenderDekho Logo
GEM

Procurement Opportunity: MANUFACTURING AND INSTALLAION OF PLATE STACKING RACKS SIZE (03 MTR X 6 MTR X 1.80 MTR

Bid Publish Date

19-Feb-2026, 9:08 am

Bid End Date

02-Mar-2026, 10:00 am

EMD

₹48,704

Progress

Issue19-Feb-2026, 9:08 am
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

2

Bid Type

Two Packet Bid

Public procurement opportunity for Hqids MANUFACTURING AND INSTALLAION OF PLATE STACKING RACKS SIZE (03 MTR X 6 MTR X 1. 80 MTR. Quantity: 2 issued by. Submission Deadline: 02-03-2026 10: 00: 00. View full details and respond.

Documents 4

GeM-Bidding-8991272.pdf

Main Document

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

MANUFACTURING AND SUPPLY OF FULLY FINISHED COVER PLATE TOP TO DRG NO 44P 04105* 3 WITH FIRMS MATL

Advanced Weapons And Equipment India Limited

TIRUCHIRAPPALLI, TAMIL NADU

Posted: 21 April 2025
Closed: 26 May 2025
GEM

Heavy racks Main unit Size 3.3 mtr Height X 2.1 mtr Length X 0.9 mtr depth approx G 2 loading level

Hqids

NORTH AND MIDDLE ANDAMAN, ANDAMAN & NICOBAR

Posted: 3 June 2025
Closed: 2 July 2025
GEM

Border Roads Organisation Supply and Stacking Precast Box Culvert Segments M35 ARUNACHAL PRADESH 2026

Border Road Organisation

WEST KAMENG, ARUNACHAL PRADESH

Posted: 6 January 2026
Closed: 27 January 2026
GEM

M. S PLATE AS PER I. S 2062 SIZE: 75 X 2000 X 4000 MM & ABOVE

Armoured Vehicles Nigam Limited

MEDAK, TELANGANA

Posted: 28 August 2025
Closed: 11 September 2025
GEM

SUPPLY AND INSTALLATION OF SERVER RACKS

Bharat Earth Movers Limited (beml)

Posted: 5 November 2024
Closed: 9 December 2024
GEM

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Annual Turnover *In case any bidder is seeking exemption from Experience / Turnover Criteria

6

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Explore More Opportunities

Quick Access