Bid Publish Date
08-May-2026, 10:17 am
Bid End Date
29-May-2026, 11:00 am
Value
₹23,16,375
Location
Progress
Quantity
11478
Category
Shed cover with plastic
Bid Type
Two Packet Bid
The opportunity is issued by the Department Of Agricultural Research And Education (DARE) for Samastipur, Bihar, covering procurement and restoration works including shed covers, aluminum profiles, spring PVC coated components, GI wires, cooling pads, exhaust fan restoration, temperature controls, plumbing fogger restorations, electric panel controller restoration and related labour. Estimated value is ₹23,16,375.00 with scope to supply, install, test, commission and train operators, plus any statutory clearances. The contract allows a 25% quantity flex during order placement or currency with rates held constant, and delivery timelines based on last date of the original order. ISO 9001 certification is required for bidders or OEMs, and turnover data must meet the three-year average specified in the bid document. Unique aspects include a comprehensive scope and mandatory data sheet alignment with offered products. This tender targets suppliers capable of end-to-end execution and post-installation support under defined statutory guidelines.
Product/service names: shed cover materials, aluminum profiles, spring PVC coated components, GI bending wire, rope, firki, adhesive tape, GI ring, cooling pad, exhaust fan restoration, temperature controller/heater repairing, plumbing fogger restoration, electric panel controller restoration, general electrical restoration
Quantities: not specified in BOQ (20 items listed as N/A)
Est. value: ₹23,16,375.00
Experience/quality: ISO 9001 certification required
Delivery/installation: Supply, installation, testing and commissioning plus operator training
Option to increase/decrease quantity by up to 25% at contract award and during currency
GST payable with actuals or applicable rate; reimbursement as per bid GST %
Data Sheet alignment mandatory; mismatch may cause rejection
Turnover validation via audited statements or CA certificate for last 3 years
GST as actuals or applicable rate, whichever is lower; payment terms aligned to GST and bid percentage
Delivery period scales with quantity changes; minimum 30 days; last date of original delivery order triggers extended timing
Not explicitly stated; standard procurement rules likely apply for delays and non-conformities
ISO 9001 certified bidder or OEM
Three-year turnover evidence or post-incorporation turnover data
No liquidation or court receivership; undertaking to be uploaded
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Shed cover with plastic , Aluminate cover , Aluminum profile , Spring pvc coated , Plastic clamp , Self-drill Screw , Plastic wire , G I Bending wire , Rope , Firki , Adhesive tape , G I ring , Cooling pad , Exhaust fan restoration , Temperature controller fan restoration , Temperature heater repairing , Plumbing fogger restorations work , Electric panel controller Restoration , Electric restoration work , Labour Cost
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Shed cover with plastic
5 layer polyethylene PE greenhouse film
Aluminate cover
Aluminized woven knitted internal thermal cum shade screen for polyhouse ceiling
Aluminum profile
Aluminum locking spring channel profile for polyhouse film net attachment
Spring pvc coated
PVC coated zigzag locking spring for securing polyhouse covering film net to aluminum or GI channel profiles
Plastic clamp
Pipe clamp for securing roll up curtain rod to polyhouse side wall structure
Self-drill Screw
Self drilling Tek screws for fastening aluminum profiles and GI structural members in polyhouse
Plastic wire
Polyester PET monofilament wire for crop trellising plant training
G I Bending wire
Galvanized Iron GI binding wire for hanging internal aluminized screens
Rope
Nylon braided rope for structural support film tensioning, and tie-down applications in polyhouse
Firki
Manual roll up ventilation gear handle Firki for side curtain operation in naturally ventilated polyhouse
Adhesive tape
UV-resistant polyethylene PE self-adhesive repair tape for patching and sealing polyhouse covering film
G I ring
Galvanized Iron GI hanging ring clamp for securing internal aluminized nets
Cooling pad
Cellulose honeycomb evaporative cooling pad
Exhaust fan restoration
Exhaust fan for polyhouse fan and pad negative pressure ventilation system
Temperature controller fan restoration
Digital temperature and humidity controller for polyhouse
Temperature heater repairing
Electric greenhouse heater for maintaining minimum temperature in polyhouse during winter
Plumbing fogger restorations work
Anti drip fogging misting nozzle for humidity management and evaporative cooling in polyhouse
Electric panel controller Restoration
Restoration and servicing of existing electrical control panel for polyhouse automation and ventilation systems
Electric restoration work
Restoration of internal electrical wiring and fittings throughout polyhouse structure
Labour Cost
Labour charges for renovation and restoration of polyhouse
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Shed cover with plastic | 5 layer polyethylene PE greenhouse film | 2,868 | sq m | skstore81@rpcau | 15 | |
| 2 | Aluminate cover | Aluminized woven knitted internal thermal cum shade screen for polyhouse ceiling | 1,613 | sq m | skstore81@rpcau | 15 | |
| 3 | Aluminum profile | Aluminum locking spring channel profile for polyhouse film net attachment | 100 | piece | skstore81@rpcau | 15 | |
| 4 | Spring pvc coated | PVC coated zigzag locking spring for securing polyhouse covering film net to aluminum or GI channel profiles | 1,000 | mtr | skstore81@rpcau | 15 | |
| 5 | Plastic clamp | Pipe clamp for securing roll up curtain rod to polyhouse side wall structure | 900 | piece | skstore81@rpcau | 15 | |
| 6 | Self-drill Screw | Self drilling Tek screws for fastening aluminum profiles and GI structural members in polyhouse | 500 | piece | skstore81@rpcau | 15 | |
| 7 | Plastic wire | Polyester PET monofilament wire for crop trellising plant training | 600 | mtr | skstore81@rpcau | 15 | |
| 8 | G I Bending wire | Galvanized Iron GI binding wire for hanging internal aluminized screens | 1 | kg | skstore81@rpcau | 15 | |
| 9 | Rope | Nylon braided rope for structural support film tensioning, and tie-down applications in polyhouse | 2 | rolls | skstore81@rpcau | 15 | |
| 10 | Firki | Manual roll up ventilation gear handle Firki for side curtain operation in naturally ventilated polyhouse | 20 | piece | skstore81@rpcau | 15 | |
| 11 | Adhesive tape | UV-resistant polyethylene PE self-adhesive repair tape for patching and sealing polyhouse covering film | 2 | piece | skstore81@rpcau | 15 | |
| 12 | G I ring | Galvanized Iron GI hanging ring clamp for securing internal aluminized nets | 600 | piece | skstore81@rpcau | 15 | |
| 13 | Cooling pad | Cellulose honeycomb evaporative cooling pad | 20 | sq m | skstore81@rpcau | 15 | |
| 14 | Exhaust fan restoration | Exhaust fan for polyhouse fan and pad negative pressure ventilation system | 6 | piece | skstore81@rpcau | 15 | |
| 15 | Temperature controller fan restoration | Digital temperature and humidity controller for polyhouse | 5 | piece | skstore81@rpcau | 15 | |
| 16 | Temperature heater repairing | Electric greenhouse heater for maintaining minimum temperature in polyhouse during winter | 10 | piece | skstore81@rpcau | 15 | |
| 17 | Plumbing fogger restorations work | Anti drip fogging misting nozzle for humidity management and evaporative cooling in polyhouse | 230 | piece | skstore81@rpcau | 15 | |
| 18 | Electric panel controller Restoration | Restoration and servicing of existing electrical control panel for polyhouse automation and ventilation systems | 1 | piece | skstore81@rpcau | 15 | |
| 19 | Electric restoration work | Restoration of internal electrical wiring and fittings throughout polyhouse structure | 1,500 | mtr | skstore81@rpcau | 15 | |
| 20 | Labour Cost | Labour charges for renovation and restoration of polyhouse | 1,500 | sq f | skstore81@rpcau | 15 |
Discover companies most likely to bid on this tender
GST certificate
PAN card
Audited financial statements or CA certificate for turnover
ISO 9001 certificate (bidder or OEM)
Data Sheet of offered products
OEM authorization or vendor certification
Experience certificates for similar works
Bidder undertaking on financial standing (no liquidation, court proceedings)
Key insights about BIHAR tender market
Bidders must meet ISO 9001 status, upload the Data Sheet, provide turnover evidence for the last three years, and submit GST details. The bid requires supply, installation, testing, commissioning, and operator training with potential 25% quantity variation at contract. Ensure no liquidation or court proceedings and attach OEM authorizations if applicable.
Submit GST registration, PAN card, audited financial statements or CA certificate for turnover, ISO 9001 certificate, Data Sheet of offered products, OEM authorization, and experience certificates. Include bid undertaking on financial standing and ensure data sheet consistency with product parameters to avoid rejection.
Mandatory ISO 9001 certification for bidder or OEM; Data Sheet must match offered specs; non-conforming or missing certificates can lead to bid rejection. GST compliance details should reflect actual rates or bid GST percentage, with turnover evidence as required.
Scope includes supply, installation, testing, commissioning of goods, and operator training; statutory clearances required if any; the package covers shed covers, aluminum profiles, PVC components, GI hardware, cooling pads, exhaust fans and related electrical restorations.
Delivery period begins from the last date of the original delivery order; quantity can be increased or decreased by up to 25% during contract; extended delivery time follows a formula with a minimum of 30 days.
GST will be reimbursed at actuals or applicable rate, whichever is lower, within the quoted GST percentage; payment terms align to procurement norms and may require documentation demonstrating GST compliance and turnover data.
Sign up now to access all documents
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS