Servicing of Dry chemical Fire Extinguisher,Servicing of CO2 4.5 KG Fire extinguisher.,Refilling fi
Hindustan Petroleum Corporation Ltd
VISAKHAPATNAM, ANDHRA PRADESH
Bid Publish Date
26-Mar-2025, 3:12 pm
Bid End Date
09-Apr-2025, 11:00 am
EMD
₹2,75,000
Location
Progress
RAQuantity
25630
Category
ASSISTANCE FOR SAFETY and Mech SERVICES unit rate to be calculated based on semi skilled rate margins
Bid Type
Two Packet Bid
Public procurement opportunity for Hindustan Petroleum Corporation Ltd ASSISTANCE FOR SAFETY and Mech SERVICES unit rate to be calculated based on semi skilled rate margins, MAINTENANCE OF DCP FIRE EXTINGUISHER 9KG, SERVICING OF FIRE EXTINGUISHER 25KG AND 75KG, SERVICING OF FIRE EXTINGUISHER 1KG TO 4. 5KG, REFILLING OF CO2 GAS 2KG TO 6. 8KG, REFILLING OF FIRE EXTINGUISHER 9KG, DCMP MOCK DRILL ARRANGEMENTS, FOAM POURER TESTING, HYDROTESTING FIRE HOSE, SUPPLY OF DRY CHEMICAL POWDER, SUPPLY AND FIXING HOSE, DCP, 9KG, FABRICATION, WELDING AND ERECTION OF STRUCTURAL STEEL, SUPPLY AND INSTALLATION SAFETY CLIP AND Safety Pin, SUPPLY AND INSTALLATION DISCHARGE HOSE FOR 25KG DCP, SUPPLY AND INSTALLATION DISCHARGE HOSE FOR 75KG DCP, SUPPLY AND INSTALLATION DISCHARGE HOSE FOR 4. 5KG CO2 DCP, SUPPLY AND INSTALLATION DISCHARGE HORN, 4. 5KG CO2 DCP, SUPPLY AND INSTALLATION DISCHARGE HORN, 2KG CO2 DCP, ULTRASONIC TESTING OF FIRE EXTINGUISHER, SUPPLY AND INSTALLATION LUMINOUS WIND SOCK, SUPPLY AND INSTALLATION CONNECTING HOSE, SERVICING OF SPRINKLER NOZZLE, SERVICING OF FIRE HOSE, WELDING OF PIPE ALL DIA, SUPPLY AND INSTALLATION OF BUTTERFLY VALVE, SUPPLY AND INSTALLATION COUPLING WASHER, CLEANING OF STRAINER 6 INCHES AND ABOVE -PRODUCT LINE, CLEANING OF STRAINER UPTO 6 INCHES - PRODUCT LINE, SUPPLY AND INSTALLATION OF 80MM CI BUTTERFLY VALVE, SUPPLY OF SPARK ARRESTOR, SUPPLY OF FIRE HOSE, 15MT, SUPPLY AND INSTALLATION OF SPRINKLER NOZZLES, SUPPLY AND INSTALLATION FIRE HOSE BOX GLASS, SUPPLY OF JET NOZZLE, SUPPLY AND INSTALLATION OF HOSE BOX, REFILLING OF CLEAN AGENT CYLINDER, SUPPLY AND INSTALLATION OF HYDRANT CAP, CLEANING OF STRAINER UPTO 6 INCHES FOR HYDRANT LINES, CLEANING OF STRAINER 6 INCHES AND ABOVE FOR HYDRANT LINES, ADDITIONAL MANPOWER ASSISTANCE, HYDROTESTING OF PIPELINE, SUPPLY, APPLICATION AND WRAPPING FOR UNDERGROUND PIPELINE, TESTING AND CALIBRATION OF TSV and SRV, TESTING AND SERVICING OF PV VENT, 3 INCH, TESTING AND SERVICING OF PV VENT, 6 INCH, HIRING OF HYDRA CRANE, Pipe Modification Product Drain, HIRING OF JCB, SUPPLY AND INSTALLATION OF GLAND ROPE FOR Valves, SUPPLY AND FILLING OF SILICA GEL, HYDROTESTING OF UNLOADING HOSE, CLEANING AND GREASING OF GATE VALVE UPTO AND INCLUDING 6 INCHES, CLEANING AND GREASING OF GATE VALVE 8 INCH AND ABOVE, SERVICING OF GEAR OPERATED VALVES, MAINTENANCE OF SWING LADDER, REPAIRING OF SWIVEL JOINT, SUPPLY AND INSTALLATION OF BOLT AND NUTS, SUPPLY AND INSTALLATION OF GASKET SHEET, Supply of Structural Steel Erection Aligment AND Welding, REFILLING OF SCABA CYLINDER 200BAR AND 300BAR, Product Tank Cleaning AG Tank, Removing of Dead Stock AG AND UG Tanks, Product Tank Cleaning UG Tank, SERVICING OF DELUGE VALVE in COIMBATORE, TAMIL NADU. Quantity: 25630 issued by. Submission Deadline: 09-04-2025 11: 00: 00. View full details and respond.
Main Document
BOQ
BOQ
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Hindustan Petroleum Corporation Ltd
VISAKHAPATNAM, ANDHRA PRADESH
Hindustan Petroleum Corporation Ltd
KHORDHA, ODISHA
Hindustan Petroleum Corporation Ltd
WEST DELHI, DELHI
Hindustan Petroleum Corporation Ltd
MUMBAI, MAHARASHTRA
Hindustan Petroleum Corporation Ltd
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | ASSISTANCE FOR SAFETY and Mech SERVICES unit rate to be calculated based on semi skilled rate margins | Please refer to the BOQ document in specifications and ATC | 15 | month | arunkthomas | 730 |
| 2 | MAINTENANCE OF DCP FIRE EXTINGUISHER 9KG | Please refer to the BOQ document in specifications and ATC | 4,000 | nos | arunkthomas | 730 |
| 3 | SERVICING OF FIRE EXTINGUISHER 25KG AND 75KG | Please refer to the BOQ document in specifications and ATC | 500 | nos | arunkthomas | 730 |
| 4 | SERVICING OF FIRE EXTINGUISHER 1KG TO 4.5KG | Please refer to the BOQ document in specifications and ATC | 750 | nos | arunkthomas | 730 |
| 5 | REFILLING OF CO2 GAS 2KG TO 6.8KG | Please refer to the BOQ document in specifications and ATC | 80 | kg | arunkthomas | 730 |
| 6 | REFILLING OF FIRE EXTINGUISHER 9KG | Please refer to the BOQ document in specifications and ATC | 80 | nos | arunkthomas | 730 |
| 7 | DCMP MOCK DRILL ARRANGEMENTS | Please refer to the BOQ document in specifications and ATC | 3 | nos | arunkthomas | 730 |
| 8 | FOAM POURER TESTING | Please refer to the BOQ document in specifications and ATC | 150 | nos | arunkthomas | 730 |
| 9 | HYDROTESTING FIRE HOSE | Please refer to the BOQ document in specifications and ATC | 200 | nos | arunkthomas | 730 |
| 10 | SUPPLY OF DRY CHEMICAL POWDER | Please refer to the BOQ document in specifications and ATC | 200 | kg | arunkthomas | 730 |
| 11 | SUPPLY AND FIXING HOSE,DCP,9KG | Please refer to the BOQ document in specifications and ATC | 100 | nos | arunkthomas | 730 |
| 12 | FABRICATION, WELDING AND ERECTION OF STRUCTURAL STEEL | Please refer to the BOQ document in specifications and ATC | 6 | metric ton | arunkthomas | 730 |
| 13 | SUPPLY AND INSTALLATION SAFETY CLIP AND Safety Pin | Please refer to the BOQ document in specifications and ATC | 50 | nos | arunkthomas | 730 |
| 14 | SUPPLY AND INSTALLATION DISCHARGE HOSE FOR 25KG DCP | Please refer to the BOQ document in specifications and ATC | 17 | nos | arunkthomas | 730 |
| 15 | SUPPLY AND INSTALLATION DISCHARGE HOSE FOR 75KG DCP | Please refer to the BOQ document in specifications and ATC | 6 | nos | arunkthomas | 730 |
| 16 | SUPPLY AND INSTALLATION DISCHARGE HOSE FOR 4.5KG CO2 DCP | Please refer to the BOQ document in specifications and ATC | 15 | nos | arunkthomas | 730 |
| 17 | SUPPLY AND INSTALLATION DISCHARGE HORN,4.5KG CO2 DCP | Please refer to the BOQ document in specifications and ATC | 10 | nos | arunkthomas | 730 |
| 18 | SUPPLY AND INSTALLATION DISCHARGE HORN,2KG CO2 DCP | Please refer to the BOQ document in specifications and ATC | 5 | nos | arunkthomas | 730 |
| 19 | ULTRASONIC TESTING OF FIRE EXTINGUISHER | Please refer to the BOQ document in specifications and ATC | 300 | nos | arunkthomas | 730 |
| 20 | SUPPLY AND INSTALLATION LUMINOUS WIND SOCK | Please refer to the BOQ document in specifications and ATC | 20 | nos | arunkthomas | 730 |
| 21 | SUPPLY AND INSTALLATION CONNECTING HOSE | Please refer to the BOQ document in specifications and ATC | 12 | nos | arunkthomas | 730 |
| 22 | SERVICING OF SPRINKLER NOZZLE | Please refer to the BOQ document in specifications and ATC | 7,500 | nos | arunkthomas | 730 |
| 23 | SERVICING OF FIRE HOSE | Please refer to the BOQ document in specifications and ATC | 30 | nos | arunkthomas | 730 |
| 24 | WELDING OF PIPE ALL DIA | Please refer to the BOQ document in specifications and ATC | 1,500 | inch dia | arunkthomas | 730 |
| 25 | SUPPLY AND INSTALLATION OF BUTTERFLY VALVE | Please refer to the BOQ document in specifications and ATC | 10 | nos | arunkthomas | 730 |
| 26 | SUPPLY AND INSTALLATION COUPLING WASHER | Please refer to the BOQ document in specifications and ATC | 100 | nos | arunkthomas | 730 |
| 27 | CLEANING OF STRAINER 6 INCHES AND ABOVE -PRODUCT LINE | Please refer to the BOQ document in specifications and ATC | 550 | nos | arunkthomas | 730 |
| 28 | CLEANING OF STRAINER UPTO 6 INCHES - PRODUCT LINE | Please refer to the BOQ document in specifications and ATC | 300 | nos | arunkthomas | 730 |
| 29 | SUPPLY AND INSTALLATION OF 80MM CI BUTTERFLY VALVE | Please refer to the BOQ document in specifications and ATC | 10 | nos | arunkthomas | 730 |
| 30 | SUPPLY OF SPARK ARRESTOR | Please refer to the BOQ document in specifications and ATC | 10 | nos | arunkthomas | 730 |
| 31 | SUPPLY OF FIRE HOSE,15MT | Please refer to the BOQ document in specifications and ATC | 10 | nos | arunkthomas | 730 |
| 32 | SUPPLY AND INSTALLATION OF SPRINKLER NOZZLES | Please refer to the BOQ document in specifications and ATC | 50 | nos | arunkthomas | 730 |
| 33 | SUPPLY AND INSTALLATION FIRE HOSE BOX GLASS | Please refer to the BOQ document in specifications and ATC | 40 | nos | arunkthomas | 730 |
| 34 | SUPPLY OF JET NOZZLE | Please refer to the BOQ document in specifications and ATC | 5 | nos | arunkthomas | 730 |
| 35 | SUPPLY AND INSTALLATION OF HOSE BOX | Please refer to the BOQ document in specifications and ATC | 5 | nos | arunkthomas | 730 |
| 36 | REFILLING OF CLEAN AGENT CYLINDER | Please refer to the BOQ document in specifications and ATC | 4 | nos | arunkthomas | 730 |
| 37 | SUPPLY AND INSTALLATION OF HYDRANT CAP | Please refer to the BOQ document in specifications and ATC | 10 | nos | arunkthomas | 730 |
| 38 | CLEANING OF STRAINER UPTO 6 INCHES FOR HYDRANT LINES | Please refer to the BOQ document in specifications and ATC | 1,100 | nos | arunkthomas | 730 |
| 39 | CLEANING OF STRAINER 6 INCHES AND ABOVE FOR HYDRANT LINES | Please refer to the BOQ document in specifications and ATC | 700 | nos | arunkthomas | 730 |
| 40 | ADDITIONAL MANPOWER ASSISTANCE | Please refer to the BOQ document in specifications and ATC | 900 | nos | arunkthomas | 730 |
| 41 | HYDROTESTING OF PIPELINE | Please refer to the BOQ document in specifications and ATC | 500 | inch meter | arunkthomas | 730 |
| 42 | SUPPLY, APPLICATION AND WRAPPING FOR UNDERGROUND PIPELINE | Please refer to the BOQ document in specifications and ATC | 40 | square meter | arunkthomas | 730 |
| 43 | TESTING AND CALIBRATION OF TSV and SRV | Please refer to the BOQ document in specifications and ATC | 100 | nos | arunkthomas | 730 |
| 44 | TESTING AND SERVICING OF PV VENT,3 INCH | Please refer to the BOQ document in specifications and ATC | 18 | nos | arunkthomas | 730 |
| 45 | TESTING AND SERVICING OF PV VENT,6 INCH | Please refer to the BOQ document in specifications and ATC | 22 | nos | arunkthomas | 730 |
| 46 | HIRING OF HYDRA CRANE | Please refer to the BOQ document in specifications and ATC | 100 | hous | arunkthomas | 730 |
| 47 | Pipe Modification Product Drain | Please refer to the BOQ document in specifications and ATC | 250 | kl | arunkthomas | 730 |
| 48 | HIRING OF JCB | Please refer to the BOQ document in specifications and ATC | 20 | hours | arunkthomas | 730 |
| 49 | SUPPLY AND INSTALLATION OF GLAND ROPE FOR Valves | Please refer to the BOQ document in specifications and ATC | 20 | kg | arunkthomas | 730 |
| 50 | SUPPLY AND FILLING OF SILICA GEL | Please refer to the BOQ document in specifications and ATC | 20 | kg | arunkthomas | 730 |
| 51 | HYDROTESTING OF UNLOADING HOSE | Please refer to the BOQ document in specifications and ATC | 1,200 | nos | arunkthomas | 730 |
| 52 | CLEANING AND GREASING OF GATE VALVE UPTO AND INCLUDING 6 INCHES | Please refer to the BOQ document in specifications and ATC | 1,400 | nos | arunkthomas | 730 |
| 53 | CLEANING AND GREASING OF GATE VALVE 8 INCH AND ABOVE | Please refer to the BOQ document in specifications and ATC | 1,100 | nos | arunkthomas | 730 |
| 54 | SERVICING OF GEAR OPERATED VALVES | Please refer to the BOQ document in specifications and ATC | 120 | nos | arunkthomas | 730 |
| 55 | MAINTENANCE OF SWING LADDER | Please refer to the BOQ document in specifications and ATC | 288 | nos | arunkthomas | 730 |
| 56 | REPAIRING OF SWIVEL JOINT | Please refer to the BOQ document in specifications and ATC | 20 | nos | arunkthomas | 730 |
| 57 | SUPPLY AND INSTALLATION OF BOLT AND NUTS | Please refer to the BOQ document in specifications and ATC | 200 | nos | arunkthomas | 730 |
| 58 | SUPPLY AND INSTALLATION OF GASKET SHEET | Please refer to the BOQ document in specifications and ATC | 200 | kg | arunkthomas | 730 |
| 59 | Supply of Structural Steel Erection Aligment AND Welding | Please refer to the BOQ document in specifications and ATC | 5 | meetric ton | arunkthomas | 730 |
| 60 | REFILLING OF SCABA CYLINDER 200BAR AND 300BAR | Please refer to the BOQ document in specifications and ATC | 2 | nos | arunkthomas | 730 |
| 61 | REFILLING OF CLEAN AGENT CYLINDER | Please refer to the BOQ document in specifications and ATC | 4 | nos | arunkthomas | 730 |
| 62 | Product Tank Cleaning AG Tank | Please refer to the BOQ document in specifications and ATC | 12 | nos | arunkthomas | 730 |
| 63 | Removing of Dead Stock AG AND UG Tanks | Please refer to the BOQ document in specifications and ATC | 600 | kl | arunkthomas | 730 |
| 64 | Product Tank Cleaning UG Tank | Please refer to the BOQ document in specifications and ATC | 8 | nos | arunkthomas | 730 |
| 65 | SERVICING OF DELUGE VALVE | Please refer to the BOQ document in specifications and ATC | 28 | nos | arunkthomas | 730 |
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Annual Turnover
Additional Doc 1 (Requested in ATC)
Additional Doc 2 (Requested in ATC)
Additional Doc 3 (Requested in ATC)
Additional Doc 4 (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Extended Deadline
09-Apr-2025, 11:00 am
Opening Date
09-Apr-2025, 11:30 am
Start
24-Apr-2025, 5:00 pm
End
29-Apr-2025, 9:00 am
Duration: 112 hours
Reverse Auction Document
✅ RA concluded. Check financial results for final rankings.
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | DHANAM ENGINEERING Under PMA | - | 05-04-2025 15:19:07 | Qualified |
| 2 | R.J.AGENCIES Under PMA | - | 08-04-2025 17:03:33 | Qualified |
| 3 | RAJAGANAPATHY ENGINEERINGS Under PMA | - | 04-04-2025 12:55:20 | Qualified |
| 4 | YES YES POWER TECH Under PMA | - | 08-04-2025 15:09:42 | Qualified |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | RAJAGANAPATHY ENGINEERINGS(MSE,MII)( MSE Social Category:General ) Under PMA | ₹1,34,67,976 | Item Categories : ASSISTANCE FOR SAFETY and Mech SERVICES unit rate to be calculated based on semi skilled rate margi |
| L2 | DHANAM ENGINEERING (MSE,MII)( MSE Social Category:OBC ) Under PMA | ₹1,65,65,566 | Item Categories : ASSISTANCE FOR SAFETY and Mech SERVICES unit rate to be calculated based on semi skilled rate margi |
| L3 | R.J.AGENCIES (MSE,MII)( MSE Social Category:OBC ) Under PMA | ₹1,78,39,748 | Item Categories : ASSISTANCE FOR SAFETY and Mech SERVICES unit rate to be calculated based on semi skilled rate margi |
| L4 | YES YES POWER TECH (MSE,MII)( MSE Social Category:OBC ) Under PMA | ₹1,91,52,586 | Item Categories : ASSISTANCE FOR SAFETY and Mech SERVICES unit rate to be calculated based on semi skilled rate margi |
Please sign in or create an account to view contract details and download result documents.
Key insights about TAMIL NADU tender market
The eligibility requirements include being a registered entity with valid business licenses. Bidders must have experience managing similar safety and mechanical maintenance contracts. Compliance with the requisite safety standards and demonstrating capability through documented prior projects will also be assessed.
Bidders need to meet specific technical specifications such as utilizing properly trained personnel for safety compliance, employing high-quality materials for servicing and installation, and adhering to all local and national codes related to safety and maintenance standards.
The Earnest Money Deposit (EMD) is a crucial requirement demonstrating the bidder's commitment to participating in the tender. The EMD amount, typically a percentage of the total project cost, must be clearly outlined in the bid, with the format and payment methods specified in the tender documents.
Bids must be submitted through the prescribed methods outlined in the tender documents, often requiring electronic submissions via designated portals. Adhering to key timelines and deadlines outlined in the tender documentation is essential for consideration.
This tender has provisions designed to support Micro, Small, and Medium Enterprises (MSEs). MSEs may benefit from relaxed eligibility criteria and potentially reduced submission fees to encourage competitive participation in government contracts, fostering local business growth and engagement.
Sign up now to access all documents
Main Document
BOQ
BOQ
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS