Custom Bid for Services - O AND M OF VALVES MOTORS GENERATORS COMPRESSORS ETC AT WASTE WATER TREATM
Bharat Heavy Electricals Limited (bhel)
TIRUCHIRAPPALLI, TAMIL NADU
Bid Publish Date
25-Dec-2025, 12:37 pm
Bid End Date
15-Jan-2026, 3:00 pm
EMD
₹18,600
Value
₹9,31,359
Location
Progress
Quantity
1
Bid Type
Two Packet Bid
Hindustan Copper Limited seeks a service contractor for civil works at Plant MCP, including the installation of 8 Nos mill discharge pumps, construction of an RCC water tank, and a car shed. Estimated value is ₹931,359, with an EMD of ₹18,600. Location is not specified in the document. The scope combines mechanical civil works with structure erection, demanding coordination across disciplines and adherence to HCL formats. A 25% optional quantity/duration adjustment is allowed at contract issue and post-issuance, with bidder acceptance required. This tender emphasizes security deposits and performance-related conditions, impacting cash flow and risk management for bidders.
Installation of 8 mill discharge pumps
Construction of RCC water tank
Car shed erection
Estimated contract value ₹931,359
EMD ₹18,600
Performance security 10% of contract value
Initial SD 5% within 30 days of LOI/WO
Progressive bill deduction of 10% for retention; 6-month retention refund with BG
Bank Guarantee validity through DLP + 60 days
Key Term 1: 10% performance security, with 5% initial SD within 30 days
Key Term 2: 25% quantity/duration flexibility at issue and post-issuance
Key Term 3: 18% p.a. liquidated penalties for SD delay beyond 30 days
10% performance security; 5% initial SD within 30 days; 5% retained from RA bills; 18% interest if SD delayed.
Delivery/installation aligned with LOI/WO; contractor must adhere to security and warranty timelines; 25% quantity/duration flexibility.
Penal interest at 18% per annum for SD delay; security realized for non-compliance or delays.
Experience in civil works for pump installation and water tank construction
Financial capability to support 10% performance security and interim payments
Compliance with HCL bank guarantee formats and procurement rules
Bharat Heavy Electricals Limited (bhel)
TIRUCHIRAPPALLI, TAMIL NADU
Ntpc Limited
AURANGABAD, BIHAR
Ntpc Limited
ANGUL, ODISHA
Ntpc Limited
RAEBARELI, UTTAR PRADESH
Chennai Petroleum Corporation Limited
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Experience certificates for similar civil works
Financial statements (audited if available)
EMD submission proof (₹18,600)
Technical bid documents
OEM approvals/authorizations (if applicable)
Bank Guarantee format compliant with HCL
Key insights about MADHYA PRADESH tender market
Bidders must submit GST, PAN, experience certificates, financial statements, and EMD ₹18,600, along with technical bid documents. Ensure compliance with 10% performance security and initial 5% SD within 30 days of LOI. Review ATC for contract quantity flexibility up to 25%.
Required documents include GST registration, PAN, prior experience certificates in pump installation and RCC tank projects, audited financial statements, EMD proof, technical bid, and OEM authorizations if applicable. Bank Guarantee format must follow HCL prescriptions.
The EMD amount is ₹18,600. Submit along with other bid documents; EMD is returned only after successful SD submission and contract award, subject to terms in the security clause.
Scopes include installation of 8 mill discharge pumps, construction of an RCC water tank, and erection of a car shed. Ensure civil works align with site drawings; coordinate with mechanical work and ensure safety compliance per HCL guidelines.
Payment requires performance security of 10% of contract value; initial SD 5% within 30 days of LOI/WO; 5% balance recovered from RA bills at 10% per bill; 18% p.a. penal interest for SD delay; SD submission precedes EMD refund.
The buyer allows up to 25% adjustment in contract quantity or duration at the time of contract issue and post-issuance; bidders must accept revised quantities or durations as stipulated.
Although specific standards aren’t listed, bidders should provide IS/ISO-compliant quality controls where applicable, along with bank guarantees in HCL format and adherence to government procurement norms for civil construction and pump installation.
Security deposits are fixed at 10% total value; 5% as initial SD, 5% via progressive bills; 50% of accumulated retention refundable every six months against a BG; EMD released after SD submission and contract completion.
Sign up now to access all documents
Main Document
OTHER
SCOPE_OF_WORK
PAYMENT
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS