GEM

Hindustan Copper Limited Civil Works Tender 2025: Installation of 8 Mill Discharge Pumps, RCC Water Tank, Car Shed Plant MCP

Bid Publish Date

25-Dec-2025, 12:37 pm

Bid End Date

15-Jan-2026, 3:00 pm

EMD

₹18,600

Value

₹9,31,359

Progress

Issue25-Dec-2025, 12:37 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

1

Bid Type

Two Packet Bid

Categories 7

Tender Overview

Hindustan Copper Limited seeks a service contractor for civil works at Plant MCP, including the installation of 8 Nos mill discharge pumps, construction of an RCC water tank, and a car shed. Estimated value is ₹931,359, with an EMD of ₹18,600. Location is not specified in the document. The scope combines mechanical civil works with structure erection, demanding coordination across disciplines and adherence to HCL formats. A 25% optional quantity/duration adjustment is allowed at contract issue and post-issuance, with bidder acceptance required. This tender emphasizes security deposits and performance-related conditions, impacting cash flow and risk management for bidders.

Key Specifications

  • Installation of 8 mill discharge pumps

  • Construction of RCC water tank

  • Car shed erection

  • Estimated contract value ₹931,359

  • EMD ₹18,600

  • Performance security 10% of contract value

  • Initial SD 5% within 30 days of LOI/WO

  • Progressive bill deduction of 10% for retention; 6-month retention refund with BG

  • Bank Guarantee validity through DLP + 60 days

Terms & Conditions

  • Key Term 1: 10% performance security, with 5% initial SD within 30 days

  • Key Term 2: 25% quantity/duration flexibility at issue and post-issuance

  • Key Term 3: 18% p.a. liquidated penalties for SD delay beyond 30 days

Important Clauses

Payment Terms

10% performance security; 5% initial SD within 30 days; 5% retained from RA bills; 18% interest if SD delayed.

Delivery Schedule

Delivery/installation aligned with LOI/WO; contractor must adhere to security and warranty timelines; 25% quantity/duration flexibility.

Penalties/Liquidated Damages

Penal interest at 18% per annum for SD delay; security realized for non-compliance or delays.

Bidder Eligibility

  • Experience in civil works for pump installation and water tank construction

  • Financial capability to support 10% performance security and interim payments

  • Compliance with HCL bank guarantee formats and procurement rules

Past Similar Tenders (Historical Results)

5 found

Custom Bid for Services - O AND M OF VALVES MOTORS GENERATORS COMPRESSORS ETC AT WASTE WATER TREATM

Bharat Heavy Electricals Limited (bhel)

TIRUCHIRAPPALLI, TAMIL NADU

Posted: 20 March 2025
Closed: 7 April 2025
GEM

Custom Bid for Services - 400052081 - Operation & Maintenance of construction Power system NTPC NAB

Ntpc Limited

AURANGABAD, BIHAR

Posted: 22 April 2025
Closed: 3 May 2025
GEM

Custom Bid for Services - 200142105 - BRC FOR MAINTENANCE of Main Plant LT System including OH, Hoi

Ntpc Limited

ANGUL, ODISHA

Posted: 25 March 2025
Closed: 4 April 2025
GEM

Custom Bid for Services - 400051355 Erection of 350NB ERW MS pipe for stageIV ash slurry discharge

Ntpc Limited

RAEBARELI, UTTAR PRADESH

Posted: 15 February 2025
Closed: 25 February 2025
GEM

Custom Bid for Services - CPCLK24396 Overhauling of Drive Turbine 221TUR1T of MP Boiler Feed Water

Chennai Petroleum Corporation Limited

Posted: 17 October 2024
Closed: 22 November 2024
GEM

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

PAN card

3

Experience certificates for similar civil works

4

Financial statements (audited if available)

5

EMD submission proof (₹18,600)

6

Technical bid documents

7

OEM approvals/authorizations (if applicable)

8

Bank Guarantee format compliant with HCL

Frequently Asked Questions

Key insights about MADHYA PRADESH tender market

How to bid in Hindustan Copper Limited civil works tender Plant MCP 2025?

Bidders must submit GST, PAN, experience certificates, financial statements, and EMD ₹18,600, along with technical bid documents. Ensure compliance with 10% performance security and initial 5% SD within 30 days of LOI. Review ATC for contract quantity flexibility up to 25%.

What documents are required for Hindustan Copper Limited civil works bid?

Required documents include GST registration, PAN, prior experience certificates in pump installation and RCC tank projects, audited financial statements, EMD proof, technical bid, and OEM authorizations if applicable. Bank Guarantee format must follow HCL prescriptions.

What is the EMD amount for this Hindustan Copper Limited tender?

The EMD amount is ₹18,600. Submit along with other bid documents; EMD is returned only after successful SD submission and contract award, subject to terms in the security clause.

What are the key technical scopes in this plant MCP project?

Scopes include installation of 8 mill discharge pumps, construction of an RCC water tank, and erection of a car shed. Ensure civil works align with site drawings; coordinate with mechanical work and ensure safety compliance per HCL guidelines.

What are the payment and security terms for this tender?

Payment requires performance security of 10% of contract value; initial SD 5% within 30 days of LOI/WO; 5% balance recovered from RA bills at 10% per bill; 18% p.a. penal interest for SD delay; SD submission precedes EMD refund.

When is the quantity/duration adjustment allowed in this tender?

The buyer allows up to 25% adjustment in contract quantity or duration at the time of contract issue and post-issuance; bidders must accept revised quantities or durations as stipulated.

What standards or certifications are required for this civil works bid?

Although specific standards aren’t listed, bidders should provide IS/ISO-compliant quality controls where applicable, along with bank guarantees in HCL format and adherence to government procurement norms for civil construction and pump installation.

How to address security deposit and its refunds in this tender?

Security deposits are fixed at 10% total value; 5% as initial SD, 5% via progressive bills; 50% of accumulated retention refundable every six months against a BG; EMD released after SD submission and contract completion.