TenderDekho Logo
Active GEM

Doordarshan SITC of Dehydrator with Accessories Tender 2026 India - ISO 9001 Compliant, 3 Year Warranty

Bid Publish Date

06-Oct-2026, 4:20 pm

Bid End Date

27-Oct-2026, 6:00 pm

Progress

Issue06-Oct-2026, 4:20 pm
AwardPending

Key Highlights

  • • ISO 9001 certification required for bidder or OEM
  • • Imported products require Indian OEM/authorized seller with after-sales office
  • • 3-year warranty from final acceptance or after commissioning
  • • Delivery flexibility allowing ±25% quantity variation

Tender Overview

Doordarshan (Ministry of Information and Broadcasting) invites bids for SITC of Dehydrator with Accessories. The scope includes Supply, Installation, Testing and Commissioning of the dehydrator at consignee location. The tender contemplates quantity adjustments up to 25%, with rates kept constant. Bidders must ensure ISO 9001 certification, and for imported items, an Indian-based OEM/authorized seller with post-sales support. The warranty obligation spans 3 years from final acceptance or after commissioning, with OEM warranty certificates required at delivery. Unique clauses accommodate GST considerations and non-obsolescence with a minimum three-year market life requirement from OEM. The opportunity targets suppliers capable of complete turnkey delivery and after-sales coverage within the contract period.

Technical Specifications & Requirements

  • Standard & certification: ISO 9001 certification for bidder or OEM; imported products require an Indian office for after-sales service.
  • Warranty: 3 years warranty from final acceptance, with rectification for breakdown during the guarantee period; OEM warranty certificates to be provided at delivery.
  • Delivery & scope: Supply, installation, testing, and commissioning included; installation, commissioning, and training support implied.
  • Option clause: Quantities may be increased/decreased by up to 25% at contract stage; additional time formula applies with minimum 30 days.
  • GST: Bidders bear GST obligations at quoted rates; reimbursement as per actuals or lower applicable rate.
  • Other terms: No explicit BOQ; ensure products are not end-of-life within three years post-purchase; ensure financial stability and non-liquidation status.

Terms, Conditions & Eligibility

  • Delivery terms: Quantity adjustments allowed up to 25% during contract and extended delivery periods calculated as (Increase/Original) × Original delivery period, min 30 days.
  • OEM/after-sales: For imported items, registered Indian OEM/authorized seller required for service support; submit certificate.
  • Documentation: ISO 9001 certification; OEM authorizations; bidder/installation/training capabilities; GST compliance notes; proof of non-liquidation status.
  • Warranty & service: 3-year warranty; ensure field service capability; provide installation, commissioning, and training as necessary.
  • Financial & compliance: Bidders must disclose GST position and ensure financial standing; no explicit EMD amount listed in data.

Key Specifications

  • Product category: Dehydrator with accessories

  • Scope: Supply, Installation, Testing and Commissioning

  • Warranty: 3 years from final acceptance + installation completion

  • Delivery flexibility: ±25% quantity, minimum 30 days extra time

  • Standards: ISO 9001 certified bidder/OEM

  • Post-sales: Indian OEM/authorized service presence for imported items

Terms & Conditions

  • Delivery quantity flexibility up to 25% with extended delivery period rules

  • ISO 9001 certification mandatory; OEM must provide after-sales support in India

  • 3-year warranty with OEM certificates required at delivery

Important Clauses

Payment Terms

GST to be paid/reimbursed per actuals or lower applicable rate; no fixed EMI details provided

Delivery Schedule

Delivery period calculated from last date of original delivery order; option clause may extend time as per formula with minimum 30 days

Penalties/Liquidated Damages

Not explicitly stated; implied per extension and delivery terms in option clause

Bidder Eligibility

  • Not under liquidation or court receivership

  • Proven experience in SITC of specialized equipment installations

  • Financial capacity to support turnkey delivery and post-sale service

Advertisement

Tender Data

Bid Details

Quantity

1

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Past Performance

40 %

Warranty Period

3 years

Experience Required

2 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

SITC of Dehydrator with Accessories

Advisory Bank

State Bank of India

ePBG Percentage

3%

ePBG Duration (Months)

15

Delivery Details

Max Delivery Days

45

Delivery Locations

1

Delivery Cities

North District

Delivery Pincodes

737103

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Narendra Kumar737103,Doordarshan Kendra, Near Enchey Monastery, TV Tower, P.O. Rajbhawan, GangtokNorth DistrictSikkim737103145-

Authority Records

MINISTRY OF INFORMATION AND BROADCASTINGDOORDARSHAN

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 3

GeM-Bidding-9992154.pdf

Main Document

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Doordarshan

Office Name

North East Zone

Grievance Contact

[email protected]

Categories 1

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

PAN card

3

ISO 9001 certificate (bidder or OEM)

4

OEM authorization / Indian-based after-sales support certificate (for imported items)

5

Experience certificates demonstrating capability for SITC projects

6

Financial statements or equivalent proof of financial standing

7

Due-diligence undertaking on non-liquidation status

8

Technical bid documents showing compliance with above terms

Frequently Asked Questions

Key insights about SIKKIM tender market

How to bid for Doordarshan dehydrator tender in India 2026

Bidders must meet eligibility criteria including ISO 9001 certification, non-liquidation status, and OEM authorization for imported equipment. Prepare GST details, experience certificates, financial statements, and installation/commissioning capabilities. Ensure turnkey delivery with installation and training inclusions, and comply with the 25% quantity option clause.

What documents are required for the Doordarshan dehydration tender

Submit GST registration, PAN, ISO 9001 certificate, OEM authorization, experience certificates, financial statements, non-liquidation undertaking, and installation/commissioning capabilities. Ensure post-sales service proof for imported items and provide OEM warranty documentation at delivery.

What are the technical requirements for the dehydrator tender

The tender emphasizes supply, installation, testing, and commissioning with 3-year warranty. ISO 9001 certification is mandatory; for imported products, an Indian-based OEM/authorized seller with service presence is required. No explicit BOQ but ensure non-obsolescence and post-sale support.

When is delivery expected after order under the Doordarshan tender

Delivery must commence from the last date of the original delivery order; quantity increases/decreases allowed up to 25%, with extended delivery time formula ensuring a minimum of 30 additional days if extended. Plan for turnkey delivery and commissioning within extended schedules.

What are the warranty terms for the dehydration equipment

The supplier must provide a 3-year warranty from final acceptance or after commissioning completion at the consignee location, with OEM warranty certificates submitted at delivery. Repair obligations during the warranty period are to be met by the seller.

What standards and after-sales support are required

Bidder or OEM must hold ISO 9001 certification; imported items require a registered Indian office for post-sales support. Ensure installation, commissioning, and training are deliverable, with service capability demonstrated in the bid.

Advertisement