Progress
Quantity
3345
Category
SOFTWARE
Bid Type
Two Packet Bid
The procurement is led by the Forensic Science Laboratory Madhuban (Karnal) under the Police Department Haryana for a comprehensive security equipment and installation package. The scope spans CAMERA, NVR, LED, POE, ACCESS CONTROL, SOFTWARE, LOCK, EXIT BUTTON, WIRE, UPS, MAT, INSTALLATION and related services. Delivery flexibility exists with a 25% quantity variation allowance and extended delivery timelines aligned to the original period, subject to contract terms. The bid includes supply, installation, testing, commissioning, operator training, and any statutory clearances required. This package targets a multi-category security deployment in Karnal, with emphasis on end-to-end delivery at the specified site, under a single contract framework.
Product/service names: CAMERA, NVR, LED, POE, ACCESS CONTROL, SOFTWARE, LOCK, EXIT BUTTON, WIRE, UPS, MAT, INSTALLATION
Quantities: variations up to 25% allowed; exact quantities subject to final order
Estimated value: Not disclosed in data; consider in bid preparation per package scope
Experience: bidder and OEM turnover criteria referenced; specific years/amounts in bid document
Quality/standards: no explicit standards listed in provided data; verify during bid submission
Key Term 1: Option clause permits up to 25% quantity variation during and after contract
Key Term 2: Scope includes supply, installation, testing, commissioning, and operator training
Key Term 3: Mandatory turnover criteria for bidder and OEM with documentary evidence
Payment terms to be governed by contract; no specific percentages or milestones provided in the data
Delivery period commences from last date of original delivery order; extended time formula provided for option clause with minimum 30 days
Penalties or LD terms are not specified in the provided data; to be defined in the contract or bid document
Minimum average annual turnover over last 3 years as per bid document
OEM turnover criteria met for the offered product
Upload audited balance sheets or CA/Cost Accountant turnover certificate
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
CAMERA , NVR , LED , POE , ACESS CONTROL , SOFTWARE , LOCK , EXIT BUTTON , WIRE , UPS , MAT , INSTALLATION
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
CAMERA
5MP IP Dome IR Varifocal Camera
CAMERA
5MP Dome PTZ with 38 X Zoom
NVR
32Channel NVR with 4K Support and 2 HDD Slots
LED
Commercial LED Monitor 65INCH 4K
LED
Commercial LED Monitor 85INCH 4K
POE
Enterprise Series PoE Managable Network Switch, 16 PORT
POE
Enterprise Series PoE Managable Network Switch, 8 PORT
ACESS CONTROL
Face and EM Card based Time-Attendance and Access Control Terminal
SOFTWARE
Software for 100 Users with Dongle
LOCK
Electromagnetic/FFGD lock 280 LBS
EXIT BUTTON
Push Exit Button
WIRE
Wire CAT6 SFTP Includes laying in PVC Conduit (305 mtrs)
UPS
UPS 1 KVA
MAT
Resilient Sound Isolation Floor Mat (Sq/ft)
INSTALLATION
Installation,Testing and Commissioning Charges
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | CAMERA | 5MP IP Dome IR Varifocal Camera | 32 | pieces | rajkanojia | 30 | |
| 2 | CAMERA | 5MP Dome PTZ with 38 X Zoom | 4 | pieces | rajkanojia | 30 | |
| 3 | NVR | 32Channel NVR with 4K Support and 2 HDD Slots | 2 | pieces | rajkanojia | 30 | |
| 4 | LED | Commercial LED Monitor 65INCH 4K | 5 | pieces | rajkanojia | 30 | |
| 5 | LED | Commercial LED Monitor 85INCH 4K | 2 | pieces | rajkanojia | 30 | |
| 6 | POE | Enterprise Series PoE Managable Network Switch, 16 PORT | 2 | pieces | rajkanojia | 30 | |
| 7 | POE | Enterprise Series PoE Managable Network Switch, 8 PORT | 2 | pieces | rajkanojia | 30 | |
| 8 | ACESS CONTROL | Face and EM Card based Time-Attendance and Access Control Terminal | 12 | pieces | rajkanojia | 30 | |
| 9 | SOFTWARE | Software for 100 Users with Dongle | 1 | pieces | rajkanojia | 30 | |
| 10 | LOCK | Electromagnetic/FFGD lock 280 LBS | 12 | pieces | rajkanojia | 30 | |
| 11 | EXIT BUTTON | Push Exit Button | 12 | pieces | rajkanojia | 30 | |
| 12 | WIRE | Wire CAT6 SFTP Includes laying in PVC Conduit (305 mtrs) | 4 | pieces | rajkanojia | 30 | |
| 13 | UPS | UPS 1 KVA | 4 | pieces | rajkanojia | 30 | |
| 14 | MAT | Resilient Sound Isolation Floor Mat (Sq/ft) | 3,250 | pieces | rajkanojia | 30 | |
| 15 | INSTALLATION | Installation,Testing and Commissioning Charges | 1 | pieces | rajkanojia | 30 |
Discover companies most likely to bid on this tender
GST Registration Certificate
Permanent Account Number (PAN) Card
Audited Balance Sheets for last 3 years or CA/Cost Accountant turnover certificate
Turnover certificates for OEM (if applicable) for last 3 years
EMD payment proof as per bid document
Technical bid documents and compliance certificates
OEM authorizations / dealership certificates
Any statutory clearances relevant to installation and commissioning
Key insights about HARYANA tender market
To bid, ensure you meet bidder and OEM turnover criteria, prepare GST, PAN, and turnover certificates, and upload all required documents as specified in the terms. The scope includes supply, installation, testing, commissioning, and operator training, with quantity variation up to 25%.
Required documents include GST registration, PAN, audited balance sheets or CA turnover certificates (last 3 years), OEM authorizations if applicable, EMD proof, technical bid and compliance certificates, and any statutory clearances related to installation.
The category list covers CAMERA, NVR, LED, POE, ACCESS CONTROL, SOFTWARE, LOCK, EXIT BUTTON, WIRE, UPS, MAT, and INSTALLATION, indicating an integrated security ecosystem procurement.
The contract allows up to a 25% increase or decrease in quantity at placement and during currency. Extended delivery time is calculated by (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days.
Scope includes Supply, Installation, Testing, Commissioning, Operator Training, and provision of statutory clearances if required, ensuring a turnkey deployment of the security system.
Explicit standards are not listed in the provided data; bidders must verify applicable standards and certifications during bid submission and rely on bid document for any ISI/ISO requirements.
OEMs must meet the minimum average annual turnover over the last 3 years as per the bid document, with supporting audited statements or CA/Cost Accountant certificates to demonstrate financial capacity.
Delivery begins after the original order’s last delivery date; if options are exercised, the extended period uses the formula stated with a 30-day minimum, guiding schedule alignment for all items.
Sign up now to access all documents
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS