Indian Army采购部 Military Affairs 部门巴拉姆拉 2026 年空气过滤器、发电机等多品类招标
Indian Army
BARAMULLA, JAMMU & KASHMIR
Bid Publish Date
21-Feb-2026, 5:57 pm
Bid End Date
09-Mar-2026, 6:00 pm
Location
Progress
Quantity
2
Bid Type
Single Packet Bid
The Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (UPRVUNL) in Lucknow invites bids for a Blower SR044 package, covering associated inlet silencer, outlet silencer, V-belt, belt guard, blower pulley, motor pulley, as a single procurement. The location is Sonbhadra, Uttar Pradesh (231205). The BOQ shows zero items, indicating potential flexible interpretation of the scope under a single equipment class. The tender uses an option clause allowing +/- 25% quantity changes during and after contract award, with adjusted delivery timelines linked to original delivery periods. This creates a dynamic order quantity, impacting inventory, lead times and pricing certainty. The procurement is distinguished by its emphasis on complete blower assembly subsystems rather than a fixed line-item schedule, with emphasis on component compatibility and delivery flexibility. Unique aspects include the absence of explicit technical specifications in the data and a stringent option-based delivery framework that bidders must confirm to. Overall, the tender centers on a compact but potentially variable order for blower-related components at a government utility site.
Blower components: inlet silencer, outlet silencer, V-belt, belt guard, blower pulley, motor pulley
Location: Sonbhadra, Uttar Pradesh
Delivery terms include: 25% quantity variation and formula-based extended delivery time
BOQ: total items listed = 0; implies bundled scope or future clarification needed
No explicit performance standards or material specifications provided in tender data
Option clause allows ±25% quantity change during contract
Delivery period determined by original and extended period formula
No BOQ items; clarification required on exact component quantities and packaging
Purchaser reserves right to increase/decrease quantity by 25% at contract placement and during currency; extended time calculated as (Increase/Original) × Original delivery period, minimum 30 days
Bidders must comply with option clause and provide pricing and delivery terms accommodating variable quantities
No BOQ items listed; bidders should solicit clarification for exact component quantities and integration with blower SR044
Experience in supplying blower components or related mechanical assemblies
Financial capacity to handle potential quantity fluctuations and extended delivery times
Ability to provide OEM authorization or demonstrated compatibility with specified components
Main Document
TECHNICAL
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
BARAMULLA, JAMMU & KASHMIR
Indian Army
KACHCHH, GUJARAT
Indian Army
BARAMULLA, JAMMU & KASHMIR
Indian Army
BARAMULLA, JAMMU & KASHMIR
Indian Army
LEH, JAMMU & KASHMIR
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST registration certificate
Permanent account number (PAN) card
Experience certificates for similar blower component supply
Financial statements demonstrating financial capacity
EMD documents (if applicable per procurement terms) and payment terms
Technical bid documents showing component compatibility with blower SR044
OEM authorization or manufacturer confirmation for supplied components (if applicable)
Key insights about UTTAR PRADESH tender market
Bidders should submit company details, GST, PAN, experience in similar blower components, and financial statements. Prepare OEM authorizations if required, EMD documents if applicable, and a technical bid showing compatibility with inlet/outlet silencers, pulleys and guards. Ensure understanding of the 25% quantity variation clause.
Required documents include GST certificate, PAN card, experience certificates for similar work, financial statements, EMD (if called for), and OEM authorizations. A technical bid demonstrating compatibility with SR044 components should accompany the bid, with clear delivery timelines under the option clause.
The tender lists components: inlet silencer, outlet silencer, V-belt, belt guard, blower pulley, motor pulley. No IS/ISO standards are specified in the data; bidders should confirm compatibility with the SR044 blower assembly and provide dimensioned drawings or data sheets for all six items.
Delivery timing follows the original delivery period with potential extension via the option clause. If quantity increases, extended time is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days; bidders must price and plan accordingly.
EMD details are not provided in the data. Bidders should verify the exact EMD amount and payment mode during bid submission and ensure compliance with the tender’s payment terms once published.
Prepare a flexible pricing schedule, confirm unit costs for potential quantity changes, and demonstrate capability to deliver up to 25% more or less. Include lead times, packaging, and staging plans to meet variable demand under the extended period.
Submit GST, PAN, experience proofs, financial statements, OEM authorizations, and any relevant certifications for mechanical components. The bid should clearly show past performance in similar blower-related supply and readiness to meet extended delivery timelines.
Sign up now to access all documents
Main Document
TECHNICAL
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS