TenderDekho Logo
Active GEM

Bids are Invited For 1. Cease Fire Alarm System,1.1 Drawings and Documentation,1.2 Any other Installation and Commission

Bid Publish Date

24-Aug-2026, 3:14 pm

Bid End Date

03-Sep-2026, 4:00 pm

EMD

₹37,500

Progress

Issue24-Aug-2026, 3:14 pm
AwardPending

Public procurement opportunity for Hindustan Shipyard Limited (hsl) 1. Cease Fire Alarm System, 1. 1 Drawings and Documentation, 1. 2 Any other Installation and Commissioning Material, 1. 3 OBS, 1. 4 Certification Charges, 1. 5 Cost of Extended warranty, 2. Armoury Alarm System, 2. 1 Drawings and Documentation, 2. 2 Any other Installation and Commissioning Material, 2. 3 OBS, 2. 4 Certification Charges, 2. 5 Cost of Extended warranty. Quantity: 108 issued by. Submission Deadline: 03-09-2026 16: 00: 00. View full details and respond.

Tender Data

Bid Details

Quantity

108

Category

1. Cease Fire Alarm System

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Group wise evaluation

Inspection Required

No

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

Yes (Arbitration clause document) as per DoE OM No.F.1/2/2024-PPD dated 03.06.2024 Arbitration should not be routinely included in contracts

Mediation Clause

Yes (Mediation clause document) as per DoE OM No.F.1/2/2024-PPD dated 03.06.2024 mediation clause should not be routinely included in contracts and pre- litigation mediation can be taken up without any such clause also

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

1. Cease Fire Alarm System , 1.1 Drawings and Documentation , 1.2 Any other Installation and Commissioning Material , 1.3 OBS , 1.4 Certification Charges , 1.5 Cost of Extended warranty , 2. Armoury Alarm System , 2.1 Drawings and Documentation , 2.2 Any other Installation and Commissioning Material , 2.3 OBS , 2.4 Certification Charges , 2.5 Cost of Extended warranty

Advisory Bank

State Bank of India

ePBG Percentage

5%

ePBG Duration (Months)

24

Payment Timelines

Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

950

Delivery Locations

1

Delivery Cities

VISHAKHAPATNAM CITY

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-VISHAKHAPATNAM CITYVISHAKHAPATNAM CITY--5950-

Authority Records

MINISTRY OF DEFENCEDEFENCE PRODUCTION DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 7

GeM-Bidding-9799469.pdf

Main Document

Other Documents

OTHER

Other Documents

OTHER

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Bill of Quantities (BOQ) 12 Items Sign in for GEM prices

#1

1. Cease Fire Alarm System

Cease Fire Alarm System as per Chapter 3 of Tender Technical Speciifctaion (TTS) including P&F, Freight, Insurance and GST

5 ship set Delivery: 950 days
#2

1.1 Drawings and Documentation

Drawings and Documentation (09 sets for 1st ship and 05 Sets each for balance 4 ships) as per TTS including P&F, Freight, Insurance and GST.

29 sets Delivery: 950 days
#3

1.2 Any other Installation and Commissioning Material

Any other Installation and Commissioning Material not mentioned above but required for system completion shall also be indicated and quoted. (for Cease Fire Alarm System)

5 ship set Delivery: 950 days
#4

1.3 OBS

On Board Spares as per TTS including P&F, Freight, Insurance and GST.

5 ship set Delivery: 950 days
#5

1.4 Certification Charges

Certification Charges as Para 1.5 (c)(vii) of TTS including lodging, boarding and GST.

5 ship set Delivery: 950 days
#6

1.5 Cost of Extended warranty

Cost of extended warranty for 12 months, which shall be placed by yard if required, but Cost of 12 months extended warranty will be considered for determination of L1 as per TTS and Price format including P&F, Freight, Insurance and GST.

5 ship set Delivery: 950 days
#7

2. Armoury Alarm System

Armoury Alarm System as per Chapter 4 of Tender Technical Specification (TTS) including P&F, Freight, Insurance and GST

5 ship set Delivery: 950 days
#8

2.1 Drawings and Documentation

Drawings and Documentation (09 sets for 1st ship and 05 Sets each for balance 4 ships) as per TTS including P&F, Freight, Insurance and GST.

29 sets Delivery: 950 days
#9

2.2 Any other Installation and Commissioning Material

Any other Installation and Commissioning Material not mentioned above but required for system completion shall also be indicated and quoted. (for Cease Fire Alarm System)

5 ship set Delivery: 950 days
#10

2.3 OBS

On Board Spares as per TTS including P&F, Freight, Insurance and GST.

5 ship set Delivery: 950 days
#11

2.4 Certification Charges

Certification Charges as Para 1.5 (c)(vii) of TTS including lodging, boarding and GST.

5 ship set Delivery: 950 days
#12

2.5 Cost of Extended warranty

Cost of extended warranty for 12 months, which shall be placed by yard if required, but Cost of 12 months extended warranty will be considered for determination of L1 as per TTS and Price format including P&F, Freight, Insurance and GST.

5 ship set Delivery: 950 days

Categories 18

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Additional Doc 1 (Requested in ATC)

2

Additional Doc 2 (Requested in ATC)

3

Additional Doc 3 (Requested in ATC)

4

Additional Doc 4 (Requested in ATC)

5

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

6

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer