Progress
Product: RO Plant with Genset and Trolley
Warranty: on spare parts and on whole items
Quantity variance: ±25% during contract
Delivery: timeline calculated as (increased quantity / original quantity) × original delivery period; minimum 30 days
Turnover: bidder and OEM must meet last 3-year average turnover criteria
Scope: supply, installation, testing, commissioning, operator training, statutory clearances
BOQ: No items specified
EMD amount not disclosed; bidders must meet turnover criteria with audited balances or CA/CMA certificates
Delivery extensions allowed with a minimum 30 days; quantity adjustments up to 25% during contract
Warranty terms cover both spare parts and whole equipment; terms to be detailed in final bid
Not specified in data; bidders should align with standard government procurement payment norms and final bid terms
Delivery period commences from last date of original delivery order; option quantities allow extension with calculated timelines and minimum 30 days
Not specified in data; penalties would be as per standard contract terms and tender document
Bidder must not be under liquidation or similar proceedings
Bidder must meet average turnover criteria for last 3 financial years
OEM of offered product must meet turnover criteria and provide OEM authorization
Quantity
1
Bid Type
Two Packet Bid
Bid Validity
100 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
No
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Min. Avg. Annual Turnover
25
OEM Avg. Turnover
10
Past Performance
50 %
Warranty Period
2 years
Experience Required
1 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
RO Plant with Genset and Trolley (Q3)
Payment Timelines
Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
PANCHAYAT BHAWAN
Delivery Pincodes
854206
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Parwaz Ahmad | 854206,PANCHAYAT BHAWAN, GIYANGAJ, BANMANKHI, PURNIA | PANCHAYAT BHAWAN | - | 854206 | 1 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
CATALOG Specification
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Audited balance sheets for last 3 financial years or CA/CMA turnover certificate
OEM authorization for the offered RO plant with genset model
Experience certificates for similar RO plant supply and installation
Bank solvency certificate or financial statement
Technical bid documents showing compliance with warranty terms
Undertaking of non-liquidity/bankruptcy status
| Category | Specification | Requirement |
|---|---|---|
| Warranty/Services | Warranty on spare parts | 0, 6, 12, 18, 24 Or higher |
| Warranty/Services | Warranty on whole items supplied | 1, 2, 3, 4, 5 Or higher |
Key insights about BIHAR tender market
To bid for the PURNIA RO plant tender, bidders must meet bidder and OEM turnover criteria, submit GST, PAN, audited balances or CA/CMA certificates, OEM authorization, and experience certificates; include warranty terms for spare parts and whole equipment, and comply with installation, testing, commissioning, and operator training requirements.
Required documents include GST certificate, PAN card, audited balance sheets or CA/CMA turnover certificate for last 3 years, OEM authorization for the offered model, experience certificates for similar projects, bank solvency document, technical bid, and undertaking of non-liquidity status.
The tender requires warranty on spare parts and warranty on the entire items supplied; detailed warranty period and coverage will be specified in the final bid documents, with OEM responsibility for parts replacements and defects.
Delivery extensions may be granted for quantity changes up to 25% at contracted rates; the added time is calculated as (increased quantity / original quantity) × original delivery period, with a minimum extension of 30 days.
Bidders must demonstrate a minimum average annual turnover for the last three financial years ending 31st March; if the bidder is newly incorporated, turnover is calculated from completed years post-constitution; the OEM must also meet a similar three-year turnover criterion.
Scope includes supply, installation, testing, commissioning, operator training, and providing statutory clearances if any; the bid price must cover all cost components, with no separate BOQ items specified in the data.
The tender emphasizes warranty terms and OEM turnover criteria; while explicit ISI/ISO standards are not listed in the data, bidders should anticipate standard compliance as per procurement norms and OEM specifications for RO plants with genset.