TenderDekho Logo
Active GEM

Goa Shipyard Limited Portable Nitrogen Charging Panel Tender South Goa 2026 – N2 Cylinders & SOTR Compliance

Bid Publish Date

03-Oct-2026, 4:13 pm

Bid End Date

24-Oct-2026, 4:00 pm

EMD

₹70,000

Progress

Issue03-Oct-2026, 4:13 pm
AwardPending

Tender Overview

Goa Shipyard Limited invites bids for a Portable Nitrogen Charging Panel with N2 cylinders and all accessories as per SOTR for yards 1258 and 1259, located in South Goa, Goa. The scope includes technical documentation soft and hard per SOTR, and service engineer charges totaling 14 man-days across 7 days in 4 sorties (1258) and 3 sorties (1259), plus preservation and depreservation operations. The tender lists an EMD of ₹70,000 and an eight-item BOQ with unspecified quantities. A bid may include option quantities up to 50% of the contracted quantity. The project references Buyer-added terms and PBG submission requirements. The opportunity requires adherence to SOTR for yard 1258 and 1259 and includes delivery and performance terms aligned with defence procurement norms.

Technical Specifications & Requirements

  • Product name: Portable Nitrogen Charging Panel with N2 cylinders and all accessories as per SOTR for yards 1258 and 1259
  • Service scope: 7 man-days in 4 sorties (1258) and 7 man-days in 3 sorties (1259)
  • Documentation: Technical Documentation Soft and Hard per SOTR for each yard
  • Preservation/Depreservation: Included for both yards
  • EMD: ₹70,000 to be submitted with bid
  • BOQ: 8 total items; specific quantities not disclosed
  • Delivery terms: As per option clause; delivery period will be governed by contract and last delivery order date
  • ATC/PBG: PBG to be submitted per Buyer Added Commercial Terms and Conditions
  • Standards: Not specified in tender; bidders must reference SOTR and applicable defence procurement norms
  • Location: Yard 1258 and Yard 1259, SOUTH GOA, GOA 403105
  • Tender type: Defence production procurement through GEM portal guidelines

Terms, Conditions & Eligibility

  • EMD: ₹70,000 to be submitted with bid
  • Delivery flexibility: Option to increase quantity up to 50% of bid quantity during contract; extended delivery time may apply
  • PBG: Performance Bank Guarantee required as per Buyer Added Terms
  • Service commitments: 7 man-days per yard across specified sorties; inclusion of preservation/depreservation
  • Documentation: Include GST registration and other mandated bid documents per T&C; OEM authorizations may be required via ATC
  • Payment terms: Not explicitly stated in data; refer to commercial terms in ATC for specifics
  • Compliance: Bid must satisfy Buyer Added ATC; adhere to SOTR for yards 1258 and 1259
  • Warranty/penalties: Not specified in available data; penalties would be per ATC and contract terms

Key Specifications

  • Portable Nitrogen Charging Panel with N2 cylinders and accessories

  • Service engineer allocation: 7 man-days per yard

  • Sorties: 4 sorties for yard 1258, 3 sorties for yard 1259

  • Preservation and depreservation included

  • Technical Documentation: Soft and Hard copies per SOTR for both yards

  • EMD amount: ₹70,000

Terms & Conditions

  • Delivery quantity may increase up to 50% under option clause

  • PBG to be submitted as per commercial terms

  • Technical documentation per SOTR for two yards is mandatory

Important Clauses

Payment Terms

Payment terms not explicitly stated; follow Buyer Added ATC terms and contract

Delivery Schedule

Delivery period governed by last delivery order date; extended time may apply with option quantities

Penalties/Liquidated Damages

Penalties to be defined in ATC/contract; ensure compliance with SOTR timing and performance

Bidder Eligibility

  • Must comply with Buyer Added ATC terms and conditions

  • Submit PBG as per contractual terms

  • Demonstrate capability to provide N2 nitrogen charging panels with required SOTR documentation

Advertisement

Tender Data

Bid Details

Quantity

28

Category

Portable Nitrogen Charging Panel with N2 cylinders and all accessories as per SOTR for yard 1258

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

11

Past Performance

30 %

Experience Required

3 Year (s)

Arbitration Clause

Yes (Arbitration clause document) as per DoE OM No.F.1/2/2024-PPD dated 03.06.2024 Arbitration should not be routinely included in contracts

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Portable Nitrogen Charging Panel with N2 cylinders and all accessories as per SOTR for yard 1258 , Technical Documentation Soft and Hard as per SOTR for Yard 1258 , Service Engineer Charges Total 7 mandays in 04 sorties as per SOTR for yard 1258 , Preservation and Depreservation for yard 1258 , Portable Nitrogen Charging Panel with N2 cylinders and all accessories as per SOTR for yard 1259 , Technical Documentation Soft and Hard as per SOTR for Yard 1259 , Service Engineer Charges Total 7 mandays in 03 sorties as per SOTR for yard 1259 , Preservation and Depreservation for yard 1259

Advisory Bank

State Bank of India

Payment Timelines

Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

90

Delivery Locations

1

Delivery Cities

SOUTH GOA

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-SOUTH GOASOUTH GOA--490-

Authority Records

MINISTRY OF DEFENCEDEFENCE PRODUCTION DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-9981261.pdf

Main Document

Other Documents

OTHER

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Goa Shipyard Limited

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Bill of Quantities (BOQ) 8 Items Sign in for GEM prices

#1

Portable Nitrogen Charging Panel with N2 cylinders and all accessories as per SOTR for yard 1258

4074200150

4 set Delivery: 90 days
#2

Technical Documentation Soft and Hard as per SOTR for Yard 1258

4074200151

4 set Delivery: 90 days
#3

Service Engineer Charges Total 7 mandays in 04 sorties as per SOTR for yard 1258

4074200152

4 lump Delivery: 90 days
#4

Preservation and Depreservation for yard 1258

4074200153

4 set Delivery: 90 days
#5

Portable Nitrogen Charging Panel with N2 cylinders and all accessories as per SOTR for yard 1259

4074200150

3 set Delivery: 150 days
#6

Technical Documentation Soft and Hard as per SOTR for Yard 1259

4074200151

3 set Delivery: 150 days
#7

Service Engineer Charges Total 7 mandays in 03 sorties as per SOTR for yard 1259

4074200152

3 lump Delivery: 150 days
#8

Preservation and Depreservation for yard 1259

4074200153

3 set Delivery: 150 days
Advertisement

Categories 2

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates showing relevant quantity of similar projects

4

Financial statements or balance sheets to demonstrate financial capability

5

EMD submission proof (DD or online payment receipt)

6

Technical bid documents demonstrating compliance with SOTR for yards 1258 & 1259

7

OEM authorization letters (if proposing OEM products)

8

PBG/Performance Guarantee as per Buyer Added Commercial Terms

Frequently Asked Questions

Key insights about GOA tender market

What documents are required for the South Goa nitrogen panel tender?

Bidders must submit GST, PAN, financial statements, experience certificates, EMD ₹70,000, technical bid with SOTR compliance, and OEM authorizations if applicable. Also include PBG as per ATC and ATC-specified bid documents for Goa Shipyard Limited procurement.

How to meet the PBG requirements for this tender in Goa 2026?

Submit the prescribed Performance Bank Guarantee as per Buyer Added Commercial Terms. Ensure the PBG amount aligns with contract value, is issued by a eligible bank, and remains valid through delivery and warranty periods as defined in ATC.

What are the service man-day requirements for yards 1258 and 1259?

Yard 1258 requires 7 man-days across 4 sorties, and yard 1259 requires 7 man-days across 3 sorties. Documentation must reflect allocation per yard, including preservation/depreservation activities as per SOTR.

What is the EMD amount for this Goa Shipyard Limited tender?

The EMD amount is ₹70,000. Submit via DD or online payment as per portal guidelines and attach payment proof with the bid submission.

Are there any delivery-time extensions for option quantities in Goa tenders?

Yes. The option clause allows quantity changes up to 50% of the bid quantity, with delivery time adjusted using the calculation and minimum 30 days, subject to contract terms and last delivery date.

What standards or SOTR references apply to the nitrogen panel tender in South Goa?

Tender requires SOTR compliance for yards 1258 and 1259; while no explicit ISI/ISO is listed, bidders should align with defence procurement norms and include soft/hard technical documentation per SOTR.

What are the procurement locations for this Goa Shipyard Limited bid?

The procurement locations are Yard 1258 and Yard 1259, South Goa, Goa 403105. Bidders must ensure site access and delivery scheduling meets these yard-specific requirements.

How to prepare technical documentation for SOTR compliance in this tender?

Prepare complete soft and hard copies of all technical documentation per SOTR for each yard, ensuring alignment with N2 cylinder panels, accessories, and preservation/depreservation activities; include installation and maintenance procedures as specified by ATC.

Advertisement