TenderDekho Logo
Closed GEM

Open Tender for Calibration of pressure gauge,Calibration of DPG,Calibration of Vaccum gauge,Calibration of 6 inch in KRISHNA, ANDHRA PRADESH

Bid Publish Date

15-May-2025, 6:32 pm

Bid End Date

26-May-2025, 7:00 pm

EMD

₹52,000

Progress

Issue15-May-2025, 6:32 pm
Technical24-05-2025 12:46:09
Award11-Jul-2025, 12:46 am
Explore all 5 tabs to view complete tender details

Quantity

3910

Category

Maintenance of earthpit

Bid Type

Two Packet Bid

Categories 79

Public procurement opportunity for Hindustan Petroleum Corporation Ltd Calibration of pressure gauge, Calibration of DPG, Calibration of Vaccum gauge, Calibration of 6 inch PV vent, Calibration of 4 inch PV vent, Calibration of 3 inch PV vent, Calibration of TSV PRVs, Calibration of Pressure Transmitter, Testing and Calib protection relay, Transformer Oil testing, Transformer Oil Filteration, Supply and fixing of mesh fixed funnels, HT breakers maintenance, LT breakers maintenance, Testing of current transformer, Maintenance of earthpit, Calib of Ele measuring instrument, Testing of elec Hand gloves 22 KV, Testing of elec Hand gloves 36 KV, AMC of air conditioner, Testing and Calib of ACB overload relay, Testing and Calib of Auxilary Relay, Testing and Calibration of Thermal relay, AMC Testing and calib of soft starters, Testing of Insulation Mat, Cas charging for AC, Thermography of Panels, Healthiness of 11 KV VCB Bottles, Transformer WTI and OTI Calibration, High Mast steel wire rope testing, TTG Steel wire rope testing, TWG Steel wire testing in KRISHNA, ANDHRA PRADESH. Quantity: 3910 issued by. Submission Deadline: 26-05-2025 19: 00: 00. View full details and respond.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Calibration of pressure gauge , Calibration of DPG , Calibration of Vaccum gauge , Calibration of 6 inch PV vent , Calibration of 4 inch PV vent , Calibration of 3 inch PV vent , Calibration of TSV PRVs , Calibration of Pressure Transmitter , Testing and Calib protection relay , Transformer Oil testing , Transformer Oil Filteration , Supply and fixing of mesh fixed funnels , HT breakers maintenance , LT breakers maintenance , Testing of current transformer , Maintenance of earthpit , Calib of Ele measuring instrument , Testing of elec Hand gloves 22 KV , Testing of elec Hand gloves 36 KV , AMC of air conditioner , Testing and Calib of ACB overload relay , Testing and Calib of Auxilary Relay , Testing and Calibration of Thermal relay , AMC Testing and calib of soft starters , Testing of Insulation Mat , Cas charging for AC , Thermography of Panels , Healthiness of 11 KV VCB Bottles , Transformer WTI and OTI Calibration , High Mast steel wire rope testing , TTG Steel wire rope testing , TWG Steel wire testing

Authority Records

MINISTRY OF PETROLEUM AND NATURAL GASHINDUSTAN PETROLEUM CORPORATION LTD

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-7846837.pdf

Main Document

Other Documents

OTHER

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 32 Items Sign in for GEM prices

#1

Calibration of pressure gauge

As mentioned in tender

1,200 each Delivery: 730 days
#2

Calibration of DPG

As mentioned in tender

300 each Delivery: 730 days
#3

Calibration of Vaccum gauge

As mentioned in tender

180 each Delivery: 730 days
#4

Calibration of 6 inch PV vent

As mentioned in tender

140 each Delivery: 730 days
#5

Calibration of 4 inch PV vent

As mentioned in tender

6 each Delivery: 730 days
#6

Calibration of 3 inch PV vent

As mentioned in tender

8 each Delivery: 730 days
#7

Calibration of TSV PRVs

As mentioned in tender

560 each Delivery: 730 days
#8

Calibration of Pressure Transmitter

As mentioned in tender

96 each Delivery: 730 days
#9

Testing and Calib protection relay

As mentioned in tender

60 each Delivery: 730 days
#10

Transformer Oil testing

As mentioned in tender

4 each Delivery: 730 days
#11

Transformer Oil Filteration

As mentioned in tender

2 each Delivery: 730 days
#12

Supply and fixing of mesh fixed funnels

As mentioned in tender

400 each Delivery: 730 days
#13

HT breakers maintenance

As mentioned in tender

4 each Delivery: 730 days
#14

LT breakers maintenance

As mentioned in tender

40 each Delivery: 730 days
#15

Testing of current transformer

As mentioned in tender

40 each Delivery: 730 days
#16

Maintenance of earthpit

As mentioned in tender

4 each Delivery: 730 days
#17

Calib of Ele measuring instrument

As mentioned in tender

12 each Delivery: 730 days
#18

Testing of elec Hand gloves 22 KV

As mentioned in tender

4 each Delivery: 730 days
#19

Testing of elec Hand gloves 36 KV

As mentioned in tender

10 each Delivery: 730 days
#20

AMC of air conditioner

As mentioned in tender

60 each Delivery: 730 days
#21

Testing and Calib of ACB overload relay

As mentioned in tender

6 each Delivery: 730 days
#22

Testing and Calib of Auxilary Relay

As mentioned in tender

20 each Delivery: 730 days
#23

Testing and Calibration of Thermal relay

As mentioned in tender

102 each Delivery: 730 days
#24

AMC Testing and calib of soft starters

As mentioned in tender

30 each Delivery: 730 days
#25

Testing of Insulation Mat

As mentioned in tender

400 each Delivery: 730 days
#26

Cas charging for AC

As mentioned in tender

20 each Delivery: 730 days
#27

Thermography of Panels

As mentioned in tender

4 each Delivery: 730 days
#28

Healthiness of 11 KV VCB Bottles

As mentioned in tender

2 each Delivery: 730 days
#29

Transformer WTI and OTI Calibration

As mentioned in tender

4 each Delivery: 730 days
#30

High Mast steel wire rope testing

As mentioned in tender

56 each Delivery: 730 days
#31

TTG Steel wire rope testing

As mentioned in tender

120 each Delivery: 730 days
#32

TWG Steel wire testing

As mentioned in tender

16 each Delivery: 730 days

Required Documents

1

Bidder Turnover

2

Additional Doc 1 (Requested in ATC)

3

Additional Doc 2 (Requested in ATC)

4

Additional Doc 3 (Requested in ATC)

5

Additional Doc 4 (Requested in ATC)

6

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

7

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Technical Results

S.No Seller Item Date Status
1
ADNA TECHNOLOGY SERVICES   Under PMA
-24-05-2025 12:46:09
2
FLUTECH ENGINEERING PRIVATE LIMITED   Under PMA
-24-05-2025 16:30:27
3
SV RAD INSPECTION SERVICES   Under PMA
-26-05-2025 10:17:56
4
TVL ELECTRICALS   Under PMA
-26-05-2025 17:56:22

Contract / Result Documents 2

Please sign in or create an account to view contract details and download result documents.

Frequently Asked Questions

Key insights about ANDHRA PRADESH tender market

What are the eligibility requirements for tender GEM/2025/B/6236933?

The eligibility requirements include being a registered entity with appropriate licenses, and experience in calibration and maintenance of mechanical and electrical equipment. Bidders must also meet any additional criteria defined by the Ministry of Petroleum and Natural Gas to qualify for participation.

What certifications are required for participating in this tender?

Bidders must possess relevant certifications that affirm their capability to perform calibration and maintenance activities. These may include ISO certifications or specific industry accreditations that demonstrate compliance with quality standards and regulations.

What is the registration process for this tender?

The registration process involves creating an account on the designated electronic tendering platform. Registration typically requires providing company details, uploading relevant documents, and accepting terms and conditions associated with this tender.

What document formats are accepted for submission?

Submissions must be made in specified document formats such as PDF or DOCX. Bidders are encouraged to ensure all files are clear and accessible, adhering to any size or format specifications provided in the tender documentation.

How will the evaluation and selection process be conducted?

The evaluation and selection process will involve a systematic review of each bid against the technical and financial criteria outlined in the tender. Bidders will be assessed based on their qualifications, past performance, and alignment with the project goals, ensuring transparency and competitiveness.