TenderDekho Logo
GEM

Engineers India Limited TOTAL SUPPLY PRICE for BLOCK B001 & B002 Karnataka 2026 Bid for Pipe-SS MR Project

Bid Publish Date

11-Jul-2026, 2:53 pm

Bid End Date

23-Jul-2026, 12:00 pm

Progress

Issue11-Jul-2026, 2:53 pm
AwardPending
Explore all 6 tabs to view complete tender details

Quantity

1

Bid Type

Single Packet Bid

Key Highlights

  • CPBG requirement: 3% of Total Order Value for contracts above ₹25 Lakh
  • Delivery basis: FOT Site (Block B001+B002) with lump-sum pricing
  • Inspection by EIL-approved TPI agency; inspection charges borne by EIL/Owner
  • Single Lump Sum Supply Price for all MR items; no itemized bid for blocks
  • Bid submissions through GeM portal; non-registrants deemed not interested
  • Suppliers must comply with Bid Specific Additional Scope of Work over GeM GTc
  • No BOQ items available; evaluation focused on bottom-line price

Tender Overview

Organizational name: Engineers India Limited, issuing a lump-sum procurement for the complete MR (Block B001+B002) at the BIO ATF Plant project of MANGALORE REFINERY AND PETROCHEMICALS LIMITED, Dakshina Kannada, Karnataka 574109. Scope is defined as Total Supply Prices for all items of MR, delivered to the site (FOT site basis) with inclusive GST and all taxes. The tender requires a single global price for both blocks, with detailed itemized breakups in Annexure-1. EIL reserves inspection via an approved TPI Agency; bid evaluation is on bottom-line price. A CPBG of 3% applies for orders above ₹25 Lakh, due within 30 days of GeM contract.

Technical Specifications & Requirements

  • Item focus: PIPE-SS (as per MR requirements) under the Project: BIO ATF PLANT OF MANGALORE REFINERY AND PETROCHEMICALS LIMITED.
  • Bidding must reflect a Single Lump Sum Supply Price for all items in Block B001 and B002, not item-wise.
  • Delivery terms: FOT Site; installation and testing, if required, per the Bidding Document and MR scope.
  • Inspections: to be conducted by EIL approved TPI agency; inspection charges borne by EIL/Owner, not to be included in bidder offer.
  • No BOQ items listed; evaluation emphasizes total order value and conformity to the GeM contract terms.
  • Compliance with the attached Bid Specific Additional Scope of Work supersedes GeM GTc.

Terms, Conditions & Eligibility

  • CPBG: 3% of Total Order Value; performance guarantee within 30 days of contract against an order above ₹25 Lakh.
  • Delivery timeline not specified; inspection governed by MR terms and TPI agency.
  • Submissions via GeM portal; if bidder has not registered, they will be deemed uninterested per terms.
  • Prices must be quoted as a single lump-sum supply price for Block B001+B002; breakups follow Annexure-1.
  • All relevant documents to be furnished per Bidding Document; failure may lead to rejection.
  • Payment terms align with GeM contract conditions; TPI charges not included in quoted price.

Key Specifications

  • Product focus: PIPE-SS (stainless steel piping) for BIO ATF Plant project

  • Scope: Total Supply Price for blocks B001+B002 (lump-sum)

  • Delivery: FOT Site basis; exact quantities and breakdown per Annexure-1

  • Inspection: by EIL approved TPI agency; charged to EIL/Owner, not included in bid

  • Standards/Compliance: Bid Specific Additional Scope of Work supersedes GeM GTc

Terms & Conditions

  • 3% CPBG for total order value above ₹25 Lakh; BG to be furnished within 30 days

  • Single lump-sum pricing for Blocks B001+B002; itemized breakup in Annexure-1

  • Inspection by MR-appointed TPI agency; inspection costs borne by owner

Important Clauses

Payment Terms

Contract cum Performance Bank Guarantee at 3% of Total Order Value; due within 30 days from GeM contract for orders >₹25 Lakh

Delivery Schedule

Delivery basis is FOT Site; no explicit delivery timeline provided in summary; follow MR bid terms

Penalties/Liquidated Damages

Not explicitly provided in data; CPBG implies performance risk; refer to Bidding Document for LD terms

Bidder Eligibility

  • Experience in supplying stainless steel piping or related MR scope

  • Financial capability to support lump-sum contract for Blocks B001+B002

  • Ability to comply with GeM portal submission and MR’s Scope of Work

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

TOTAL SUPPLY PRICE FOR BLOCK B001 AND B002

Advisory Bank

State Bank of India

ePBG Percentage

3%

ePBG Duration (Months)

40

Payment Timelines

Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

60

Delivery Locations

1

Delivery Cities

Dakshina Kannada

Delivery Pincodes

575030

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
TRILOCHAN NAIK575030,Engineers India Limited BBU & Slope stabilization Project, MRPL PO Kuthethoor via Katipalla, Manglore - 575030 Dakshina Kannada, KarnatakaDakshina KannadaKarnataka575030160-

Authority Records

MINISTRY OF PETROLEUM AND NATURAL GAS

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 11

GeM-Bidding-9593817.pdf

Main Document

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

Total Price for MR Block no. B001,Total Price for MR Block no. B002,Total Price for MR Block no. B0

Engineers India Limited

DAKSHINA KANNADA, KARNATAKA

Posted: 18 July 2025
Closed: 18 August 2025
GEM

Total Supply price for Block: B001 of MR,Total Supply price for Block: B002 of MR,Total Supply pric

Engineers India Limited

DAKSHINA KANNADA, KARNATAKA

Posted: 14 July 2025
Closed: 4 August 2025
GEM

Total Price for MR Block no. B001,Total Price for MR Block no. B002,Total Price for MR Block no. B0

Engineers India Limited

DAKSHINA KANNADA, KARNATAKA

Posted: 24 July 2025
Closed: 19 August 2025
GEM

Engineers India Limited Fasteners Tender Pune Maharashtra TNT MIL KHADKI 2025

Engineers India Limited

PUNE, MAHARASHTRA

Posted: 22 November 2025
Closed: 8 December 2025
GEM

Engineers India Limited Flanges CS Tender Pune Maharashtra 2025 TNT MIL KHADKI – CPBG SFMS & GST Clause

Engineers India Limited

PUNE, MAHARASHTRA

Posted: 7 November 2025
Closed: 21 November 2025
GEM

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates demonstrating relevant supply experience

4

Financial statements or proof of financial capability

5

Bid security or CPBG-related documents as applicable

6

Technical compliance certificates or OEM authorizations, if required

7

Any required certifications linked to PIPE-SS components

Frequently Asked Questions

Key insights about KARNATAKA tender market

How to bid for stainless pipe tender in Karnataka with EIL MR scope

To bid, register on GeM, quote a single lump-sum supply price for Blocks B001+B002, include GST, and comply with the Bid Specific Additional Scope of Work. Provide CPBG details if total value exceeds ₹25 Lakh and submit all required documents (GST, PAN, experience, financials).

What documents are required for the pipe-SS MR tender in Dakshina Kannada

Bidders must submit GST registration, PAN card, experience certificates, financial statements, and any OEM authorizations or technical compliance records. Include CPBG documentation if applicable and ensure all documents align with the MR Bid Specific Scope and GeM submission rules.

What is the CPBG amount for this EIL tender in Karnataka

Contract cum Performance Bank Guarantee is 3% of the Total Order Value for orders above ₹25 Lakh. The guarantee must be furnished within 30 days from the GeM contract, ensuring bidder compliance with performance obligations through MR terms.

What delivery terms apply to Blocks B001+B002 in this tender

Delivery is on a FOT Site basis for all MR items in Blocks B001 and B002. The vendor must align with the MR scope and pay attention to inspection by the approved TPI agency, with charges borne by EIL/Owner and not included in the bid price.

What standards or approvals are required for pipe-SS components

While explicit standards are not listed, the tender references a Bid Specific Additional Scope of Work superseding GeM terms. Vendors should prepare to demonstrate compliance via MR documentation, and supply chain certifications for stainless steel piping where applicable.

How is the price evaluated for Blocks B001+B002 in this MR tender

Evaluation uses a bottom-line lump-sum price for the entire Blocks B001+B002. Individual item rates are not evaluated separately; Annexure-1 provides a breakup for internal reference, while the bidder’s total quoted price governs acceptance.

When does the CPBG need to be valid and renewed

The CPBG must be valid for the contract duration, with a 30-day window to submit post-GeM contract. This ensures coverage for performance and any potential extension under the MR project terms.

What is required if inspection is needed for MR items

An EIL-approved TPI agency will conduct inspections; inspection charges are borne by EIL/Owner. Bidders should not include TPI charges in their quoted price and must provide access for inspection per MR terms.

Similar Tenders

5 found

Engineers India Limited Pipe-SS Tender for Blocks B001+B002 Dakshina Kannada Karnataka 2026

Engineers India Limited

📍 DAKSHINA KANNADA, KARNATAKA

⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM

Engineers India Limited MR Block B001 Pipe Procurement Tender Karnataka 2026 GST/EMD CPBG 3%

Engineers India Limited

📍 DAKSHINA KANNADA, KARNATAKA

⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM
Urgent

Total Price for MR Block no. B001,Total Price for MR Block no. B002,Total Price for MR Block no. B0

Engineers India Limited

📍 DAKSHINA KANNADA, KARNATAKA

⏰ Deadline: 7 days left
🛒 Type: Goods
View GEM
Urgent

Total Price for MR Block no. B001,Total Price for MR Block no. B002,Total Price for MR Block no. B0

Engineers India Limited

📍 DAKSHINA KANNADA, KARNATAKA

⏰ Deadline: 6 days left
🛒 Type: Goods
View GEM
Urgent

Total Price for MR Block no. B001,Total Price for MR Block no. B002,Total Price for MR Block no. B0

Engineers India Limited

📍 DAKSHINA KANNADA, KARNATAKA

⏰ Deadline: 7 days left
🛒 Type: Goods
View GEM