State Bank of India Inverter Thermal Control Unit & Smart Climate Regulation Module Tender Hanumangarh Rajasthan 2026
State Bank Of India (sbi)
HANUMANGARH, RAJASTHAN
Bid Publish Date
26-Jun-2026, 1:24 pm
Bid End Date
06-Jul-2026, 2:00 pm
Location
Progress
Quantity
6
Category
INVERTER THERMAL CONTROL UNIT
Bid Type
Two Packet Bid
State Bank of India (Department of Financial Services) invites bids for multiple climate-control and thermal management products, including INVERTER THERMAL CONTROL UNIT, SMART CLIMATE REGULATION MODULE, ADVANCED THERMAL MANAGEMENT UNIT, and SMART CLIMATE REGULATION MODULE 2. The procurement scope references six BOQ items, though exact quantities and monetary value are not disclosed. Location details are not provided, but the tender clearly targets SBI procurement of advanced temperature regulation hardware. A key differentiator is the explicit option clause allowing up to 25% quantity variation at contracted rates, with delivery timing adjustments based on the extended period formula. This framework signals flexibility for bulk or phased deployment within the contract term.
Option clause permits ±25% quantity change at bid/contract time
Delivery period recalculation applies with minimum 30 days
No explicit EMD, payment terms, or warranty details disclosed
Not explicitly defined in provided data; bidders should anticipate standard government terms and seek clarification during bid submission
Delivery is extendable via the option clause; additional time = (increased quantity / original quantity) × original delivery period, minimum 30 days
Not detailed in the provided excerpt; bidders should verify LD provisions in final tender documents
Experience in supplying climate-control hardware or thermal management modules
Demonstrated financial capacity to handle SBI procurement values (as disclosed in final bid documents)
Compliance with standard procurement documents (GST, PAN, OEM authorizations)
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
INVERTER THERMAL CONTROL UNIT , SMART CLIMATE REGULATION MODULE , ADVANCED THERMAL MANAGEMENT UNIT , ADVANCED THERMAL MANAGEMENT UNIT 2 , SMART CLIMATE REGULATION MODULE 2
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
State Bank Of India (sbi)
HANUMANGARH, RAJASTHAN
State Bank Of India (sbi)
Ajmer, RAJASTHAN
State Bank Of India (sbi)
Ajmer, RAJASTHAN
State Bank Of India (sbi)
Ajmer, RAJASTHAN
State Bank Of India (sbi)
HANUMANGARH, RAJASTHAN
Tender Results
Loading results...
INVERTER THERMAL CONTROL UNIT
5000W ENERGY EFFICIENT SYSTEM WITH COPPER COIL
SMART CLIMATE REGULATION MODULE
DIGITAL TEMPERATURE CONTROL WITH LOW NOISE DESIGN
ADVANCED THERMAL MANAGEMENT UNIT
HIGH EFFICIENCY INVERTER SYSTEM WITH SMART FEATURES
ADVANCED THERMAL MANAGEMENT UNIT 2
HIGH EFFICIENCY INVERTER SYSTEM WITH SMART FEATURES 2
INVERTER THERMAL CONTROL UNIT
5000W ENERGY EFFICIENT SYSTEM WITH COPPER COIL
SMART CLIMATE REGULATION MODULE 2
DIGITAL TEMPERATURE CONTROL WITH LOW NOISE DESIGN 2
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | INVERTER THERMAL CONTROL UNIT | 5000W ENERGY EFFICIENT SYSTEM WITH COPPER COIL | 1 | pieces | sbiro62375.buy_con1 | 30 | |
| 2 | SMART CLIMATE REGULATION MODULE | DIGITAL TEMPERATURE CONTROL WITH LOW NOISE DESIGN | 1 | pieces | sbiro62375.buy_con1 | 30 | |
| 3 | ADVANCED THERMAL MANAGEMENT UNIT | HIGH EFFICIENCY INVERTER SYSTEM WITH SMART FEATURES | 1 | pieces | sbiro62375.buy_con1 | 30 | |
| 4 | ADVANCED THERMAL MANAGEMENT UNIT 2 | HIGH EFFICIENCY INVERTER SYSTEM WITH SMART FEATURES 2 | 1 | pieces | sbiro62375.buy_con1 | 30 | |
| 5 | INVERTER THERMAL CONTROL UNIT | 5000W ENERGY EFFICIENT SYSTEM WITH COPPER COIL | 1 | pieces | sbiro62375.buy_con1 | 30 | |
| 6 | SMART CLIMATE REGULATION MODULE 2 | DIGITAL TEMPERATURE CONTROL WITH LOW NOISE DESIGN 2 | 1 | pieces | sbiro62375.buy_con1 | 30 |
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar climate-control equipment bids
Financial statements (last 2-3 years)
EMD or security deposit documentation (per bid terms)
Technical bid documents demonstrating compliance with product categories
OEM authorisation letters (if bidding as an authorized reseller/partner)
Any existing certifications or quality assurance documentation relevant to inverter/thermal modules
Bidders must submit GST, PAN, experience certificates, financial statements, and EMD documentation. The tender includes an option clause allowing up to 25% quantity variation and a minimum 30-day delivery extension. Ensure OEM authorizations are attached and that you meet SBI procurement requirements for inverter and thermal management equipment.
Required documents include GST certificate, PAN card, experience certificates for similar projects, financial statements, EMD documentation, technical bid, and OEM authorizations. Prepare installation or service capability proof and any product certifications relevant to inverter thermal control units.
Delivery terms hinge on the option clause: quantity may vary by up to 25% with corresponding delivery time adjustment. The extended delivery period uses the formula (increased quantity/ original quantity) × original delivery period, with a minimum of 30 days added.
The tender data does not specify standards; bidders should confirm IS/ISO certifications during final bid submission and provide any relevant quality assurances, OEM certifications, and compliance documents to demonstrate product reliability.
The provided data does not disclose estimated contract value or EMD amount. Bidders should refer to the final tender documents for exact EMD percentages, payment terms, and contract value guidance for inverter and thermal management equipment.
Respond with scalable production plans to accommodate up to 25% additional quantity. Align delivery schedules to the extended period rules and include buffer stock, ensuring readiness for phased deployments across SBI sites.
The tender references six items, including INVERTER THERMAL CONTROL UNIT and SMART CLIMATE REGULATION MODULE variants. Specific quantities and models are not disclosed in the data; bidders should await final BOQ details and confirm compatibility with site infrastructure.
Final terms, quantities, and schedules will appear in the official bid documents. Bidders should monitor SBI procurement notices for the complete BOQ, EMD requirements, warranty terms, and delivery milestones.
State Bank Of India (sbi)
📍 Sri Ganganagar, RAJASTHAN
Hindustan Petroleum Corporation Ltd
📍 PUNE, MAHARASHTRA
Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (uprvunl) Lucknow
📍 SONBHADRA, UTTAR PRADESH
Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (uprvunl) Lucknow
📍 SONBHADRA, UTTAR PRADESH
Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (uprvunl) Lucknow
📍 SONBHADRA, UTTAR PRADESH
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS