TenderDekho Logo
Active GEM

Indian Army Dozer BD80 Spare Parts Tender Assam 2026 - BD80 NK 7 Oil Filter, Water Gauge, Transmission Filter & More

Bid Publish Date

07-Oct-2026, 7:16 pm

Bid End Date

19-Oct-2026, 10:00 am

Progress

Issue07-Oct-2026, 7:16 pm
AwardPending

Key Highlights

  • • Critical brand/OEM alignment required for BD80 spare parts
  • • IS0/IS standards not specified; ensure data-sheet parity with BD80 components
  • • Option clause allowing up to 25% quantity variation during contract
  • • Nominated Inspection Agency for product verification

Tender Overview

Organization: Indian Army (Department of Military Affairs) seeks procurement of BD80 spare parts for Dozer BD80 series, listing 15 items in the Bill of Quantities. Location: Dhemaji, Assam 786110. Product scope includes oil filters, fuel filters, water temperature gauge, oil pressure gauge, transmission oil filter, electrical cables, end bits, belts, and related elements. Estimated value and EMD are not disclosed in the data; however, the tender references a multi-item supply against potential bulk orders. A data-sheet verification requirement and a single Nominated Inspection Agency condition are noted, with standard GeM data handling practices. The unique aspect is a combined batch of BD80 components across multiple sub-skus, requiring OEM data-sheet alignment and non-obsolescence assurance.

Technical Specifications & Requirements

  • Product names and categories: DOZER BD80 NK oil/ fuel/ cooling/ electrical components; Dozer BD80 NK21200 HRS MTR CABLE; WATER TEMP GAUGE, OILPRESSURE GAUGE; FUEL FILTERS, OIL FILTERS, BIT END RH/LH, ACC CABLE; 15 total items in BOQ.
  • Deliverables & documentation: Data Sheet uploaded with bid; GST registration and company PAN/EFT mandates to be verified; Nominated Inspection Agency designated for inspection.
  • Quality/compatibility: Items must be compatible with BD80 excavator platform; no obsolescence claims beyond 1 year residual market life; non-end-of-life confirmation required from OEM.
  • Submission controls: GST invoice copy through GeM; BOM/data-sheet match critical to avoid rejection; bid should reflect non-obsolescence and required warranty/after-sales terms, if any.
  • Compliance/records: BIDDER must ensure data-sheet alignment with offered parameters and maintain standard GST practices; non-disclosure clause applies to bid contents.

Terms, Conditions & Eligibility

  • EMD and financial standing: No explicit EMD amount provided in the data; bidder must not be under liquidation or bankruptcy and may be required to upload an affirmative undertaking.
  • Delivery/option clause: Purchaser reserves right to increase/decrease quantity up to 25% of bid quantity at contract; extended delivery period calculations apply with a minimum of 30 days unless original period exceeds that.
  • GST and invoicing: GST applicability to be determined by bidder; GST reimbursement as per actuals or applicable rates; GST invoice and GST portal payment evidence to be uploaded on GeM.
  • Submission documents: Copy of PAN, GSTIN, cancelled cheque, EFT mandate; data sheets; Non-Disclosure certificate; OEM authorizations (if required); experience credentials and financials sometimes requested.
  • Inspection: Nominated Inspection Agency to perform verification on behalf of the Buyer; data sheet consistency required for bid acceptance.
  • Other compliance: Bidders must ensure products are not obsolete; data-sheet match critical; ensure non-disclosure and contractual terms are adhered to; data and documentation must be supplied in full with bid.

Key Specifications

  • BD80 spare parts: oil/fuel filters, water temp gauge, oil pressure gauge, transmission oil filter, filters & elements (inner/outer), end bits RH/LH, ACC cables, belts

  • 15 items in BOQ; no explicit numerical specs provided in the data

  • Data-sheet alignment with offered parameters is mandatory

  • Nominated Inspection Agency to inspect supplied items

Terms & Conditions

  • Option quantity variation up to 25% during contract with staged delivery

  • GST handling responsibility on bidder; GST invoice and portal evidence required

  • Data-sheet alignment mandatory; non-disclosure and vendor code requirements

Important Clauses

Payment Terms

GST payable per actuals or applicable rate; payment terms tied to invoicing via GeM with GST compliance

Delivery Schedule

Delivery period extends from last date of original DO; extended period guided by option clause with minimum 30 days

Penalties/Liquidated Damages

Not explicitly stated; implied LD if delivery/execution not met per contract terms

Bidder Eligibility

  • Not under liquidation, no court receivership, or bankruptcy

  • Own GSTIN and PAN; compliant financials

  • Offer not obsolete in the market; minimum 1 year residual market life

  • OEM data-sheet availability; non-disclosure terms accepted

Advertisement

Tender Data

Bid Details

Quantity

17

Category

DOZER BD80 NK 7 OIL FILTER

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

50% Lowest Priced Technically Qualified Bidders

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Past Performance

70 %

Warranty Period

1 years

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

DOZER BD80 NK 7 OIL FILTER , DOZER BD80 41Z7181545 FUEL FILTER , DOZER BD80 NK21200 HRS MTR CABLE , DOZER BD80 NK8 FAN BELT , DOZER BD80 116AD51254 BIT END RH , DOZER BD80 116AD51246 BIT END LH , DOZER BD80 NK21206 COTTON FUEL FILTER , DOZER BD80 30Z7181024 WATER TEMP GAUGE , DOZER BD80 NK12 OILPRESSURE GUAGE , DOZER BD80 NK21201 TRANSMISSION OIL , DOZER BD80 110TM03085 OIL FILTER , DOZER BD80 NK202612 FUEL FILTER , DOZER BD80 NK202615 ELEMENT OUTER , DOZER BD80 NK202614 ELEMENT INNER , DOZER BD80 NK202616 ACC CABLE

Pre-Bid & Qualification

Pre-Bid Date

09-10-2026 09:00:00

Pre-Bid Venue

874 field workshop coy c/o 99 APO, Pin - 906874

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

Dhemaji

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-DhemajiDhemaji--115-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9995818.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Indian Army

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Bill of Quantities (BOQ) 15 Items Sign in for GEM prices

#1

DOZER BD80 NK 7 OIL FILTER

DOZER BD80 NK 7 OIL FILTER

1 nos Delivery: 15 days
#2

DOZER BD80 41Z7181545 FUEL FILTER

DOZER BD80 41Z7181545 FUEL FILTER

2 nos Delivery: 15 days
#3

DOZER BD80 NK21200 HRS MTR CABLE

DOZER BD80 NK21200 HRS MTR CABLE

1 nos Delivery: 15 days
#4

DOZER BD80 NK8 FAN BELT

DOZER BD80 NK8 FAN BELT

2 nos Delivery: 15 days
#5

DOZER BD80 116AD51254 BIT END RH

DOZER BD80 116AD51254 BIT END RH

1 nos Delivery: 15 days
#6

DOZER BD80 116AD51246 BIT END LH

DOZER BD80 116AD51246 BIT END LH

1 nos Delivery: 15 days
#7

DOZER BD80 NK21206 COTTON FUEL FILTER

DOZER BD80 NK21206 COTTON FUEL FILTER

1 nos Delivery: 15 days
#8

DOZER BD80 30Z7181024 WATER TEMP GAUGE

DOZER BD80 30Z7181024 WATER TEMP GAUGE

1 nos Delivery: 15 days
#9

DOZER BD80 NK12 OILPRESSURE GUAGE

DOZER BD80 NK12 OILPRESSURE GUAGE

1 nos Delivery: 15 days
#10

DOZER BD80 NK21201 TRANSMISSION OIL

DOZER BD80 NK21201 TRANSMISSION OIL

1 nos Delivery: 15 days
#11

DOZER BD80 110TM03085 OIL FILTER

DOZER BD80 110TM03085 OIL FILTER

1 nos Delivery: 15 days
#12

DOZER BD80 NK202612 FUEL FILTER

DOZER BD80 NK202612 FUEL FILTER

1 nos Delivery: 15 days
#13

DOZER BD80 NK202615 ELEMENT OUTER

DOZER BD80 NK202615 ELEMENT OUTER

1 nos Delivery: 15 days
#14

DOZER BD80 NK202614 ELEMENT INNER

DOZER BD80 NK202614 ELEMENT INNER

1 nos Delivery: 15 days
#15

DOZER BD80 NK202616 ACC CABLE

DOZER BD80 NK202616 ACC CABLE

1 nos Delivery: 15 days
Advertisement

Categories 9

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Copy of PAN Card

2

Copy of GSTIN

3

Copy of Cancelled Cheque

4

Copy of EFT Mandate certified by Bank

5

Data Sheet of offered product(s)

6

Non-Disclosure Declaration Certificate

7

GST invoice copy and GST portal payment screenshot (during invoice generation on GeM)

Frequently Asked Questions

Key insights about ASSAM tender market

What are the eligibility criteria for BD80 spare parts tender in Assam 2026?

Bidders must not be in liquidation or bankruptcy, possess valid PAN and GSTIN, submit EFT mandate and cancelled cheque, and provide a data sheet for each offered BD80 component. OEM authorizations and non-disclosure declarations may be required; ensure products are not obsolete with at least 1 year residual market life.

How to participate in Indian Army Dozer BD80 procurement in Dhemaji?

Register on GeM, upload PAN, GSTIN, cancelled cheque, EFT mandate, and product data sheets. Ensure GST is calculated per current rates, and comply with the 25% quantity option clause. Submit NDA and OEM data as applicable; ensure items match BD80 part numbers listed.

What documents are required for BD80 spare parts submission in Assam?

Required documents include PAN, GSTIN, cancelled cheque, EFT mandate, product Data Sheets, Non-Disclosure Declaration, and GST invoice copies during invoicing. OEM authorizations or service certificates may be requested to verify authenticity and compatibility with BD80 components.

What are the technical specifications for BD80 components in this tender?

The tender lists BD80 oil filters, fuel filters, water temperature gauge, oil pressure gauge, adjustments for transmission oil filter, end bits, belts, ACC cables, and related elements. Exact dimensions are not provided; bidders must rely on OEM data sheets to confirm compatibility with BD80 equipment.

When is the delivery window for BD80 parts under this procurement?

Delivery timing is governed by the original delivery order date with potential extension for quantity variations up to 25%. If extended, the additional time equals (increased quantity/original quantity) times the original delivery period, with a minimum of 30 days.

What is required for GST compliance in the BD80 tender in Assam?

Submit GSTIN and ensure GST invoice is uploaded on GeM; GST reimbursement is as per actuals or applicable rates, not exceeding the quoted GST percentage. Maintain GST portal payment screenshots for verification.

What is the payment structure for BD80 spare parts supply contract?

The tender specifies GST-based invoicing and portal payment practices; explicit advance or milestone payments are not detailed in the data. Ensure invoices align with supplied data sheets and are accompanied by GST documentation for timely processing.

How to verify product data sheets for BD80 components in this bid?

Data sheets must match offered BD80 component specifications; suppliers should ensure model numbers, end finishes, and performance metrics align with OEM documents. Any mismatch can lead to bid rejection; attach datasheets with clear part numbers and material specs.

Advertisement