Paint RFU fin Synthetic Ename,Paint RFU Air Dry Br spr ena green Green,Paint Finishing matt RFU air
Indian Army
KUPWARA, JAMMU & KASHMIR
Bid Publish Date
05-Jul-2026, 8:36 pm
Bid End Date
15-Jul-2026, 9:00 pm
Location
Progress
Quantity
135
Category
Paint Rfu Finishing Syn Ename
Bid Type
Two Packet Bid
The Indian Army, Department of Military Affairs, seeks paint supplies in Kupwara, Jammu & Kashmir (193221) covering multiple finish categories such as finishing synthetic enamel, nitrocellulose finishing, matt olive green, air-dry enamel, bituminous black acid alk, and green grass finishes. The BOQ lists 7 items, but specific quantities are not disclosed. Key differentiators include option-based quantity adjustments up to 25%, a staggered delivery framework, and mandatory advance sample approvals prior to bulk manufacturing. The contract emphasizes conformity to contract specifications and supplier responsiveness for sample modifications and approvals. This procurement targets vendors capable of delivering multiple enamel and protective coatings with controlled color and finish, under standard government supply terms.
Paint categories include: finishing enamel, nitrocellulose finishing, finishing synthetic enamel, air-dry enamel, bituminous black acid alk, matt olive green, green grass finish
Delivery quantity variation permissible up to 25% of bid quantity during contract and currency
Advance sample submissions: up to 5 samples within 5 days of contract award
Approval/modification lead times: 5 days for buyer response on samples
Delivery time extension: minimum 30 days, aligned to original delivery period
Option to modify quantity by ±25% anytime during contract and currency
Advance samples required; bulk supply must match approved sample
Delivery period adjustments if buyer delays sample approval; no LD for buyer-induced delays
No explicit payment terms stated; bidders should expect standard government payment upon delivery per contract, subject to acceptance of goods and pre-dispatch conditions.
Delivery starts from the last date of original delivery order; additional time for increased quantity calculated as (Increased quantity / Original quantity) × Original delivery period, minimum 30 days.
Liquidated damages apply if delays occur beyond approved delivery timelines; extension allowed only per option clause and buyer approvals; termination possible for major deviations.
Experience in supplying government-grade paints and coatings
Manufacturing/authorized supply of enamel and finishing coatings
Ability to provide advance sampling and comply with approval timelines
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Paint Rfu Finishing Syn Ename , Paint Rfu Air Dry Br Spr Ena Green Grass , Paint Rfu Bituminous Black Acid Alk , Paint Rfu Finishing Synthetic Ename , Paint Rfu Finishing Ammun Air Dry , Paint Rfu Matt Finish Olive Green , Paint Rfu Nitrocellulose Finishing Brus
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
KUPWARA, JAMMU & KASHMIR
Indian Army
KUPWARA, JAMMU & KASHMIR
Indian Army
GWALIOR, MADHYA PRADESH
Indian Army
GWALIOR, MADHYA PRADESH
Indian Army
GWALIOR, MADHYA PRADESH
Tender Results
Loading results...
Paint Rfu Finishing Syn Ename
Paint Rfu Finishing Syn Ename
Paint Rfu Air Dry Br Spr Ena Green Grass
Paint Rfu Air Dry Br Spr Ena Green Grass
Paint Rfu Bituminous Black Acid Alk
Paint Rfu Bituminous Black Acid Alk
Paint Rfu Finishing Synthetic Ename
Paint Rfu Finishing Synthetic Ename
Paint Rfu Finishing Ammun Air Dry
Paint Rfu Finishing Ammun Air Dry
Paint Rfu Matt Finish Olive Green
Paint Rfu Matt Finish Olive Green
Paint Rfu Nitrocellulose Finishing Brus
Paint Rfu Nitrocellulose Finishing Brus
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Paint Rfu Finishing Syn Ename | Paint Rfu Finishing Syn Ename | 20 | litre | molwal | 15 | |
| 2 | Paint Rfu Air Dry Br Spr Ena Green Grass | Paint Rfu Air Dry Br Spr Ena Green Grass | 45 | litre | molwal | 15 | |
| 3 | Paint Rfu Bituminous Black Acid Alk | Paint Rfu Bituminous Black Acid Alk | 15 | litre | molwal | 15 | |
| 4 | Paint Rfu Finishing Synthetic Ename | Paint Rfu Finishing Synthetic Ename | 10 | litre | molwal | 15 | |
| 5 | Paint Rfu Finishing Ammun Air Dry | Paint Rfu Finishing Ammun Air Dry | 10 | litre | molwal | 15 | |
| 6 | Paint Rfu Matt Finish Olive Green | Paint Rfu Matt Finish Olive Green | 30 | litre | molwal | 15 | |
| 7 | Paint Rfu Nitrocellulose Finishing Brus | Paint Rfu Nitrocellulose Finishing Brus | 5 | litre | molwal | 15 |
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Experience certificates for relevant paint procurement work
Financial statements (last 2-3 years)
EMD/Security deposit documents (as applicable per tender terms)
Technical bid documents demonstrating product compliance
OEM authorizations or authorized distributor certificates
Any certifications relevant to paint categories (if specified by buyer later)
Key insights about JAMMU AND KASHMIR tender market
Bidders must submit GST, PAN, experience certificates, financial statements, EMD, and technical bid documents, along with OEM authorizations. Ensure compliance with advance sample submission (up to 5 samples within 5 days) and readiness for 25% quantity variation. Follow delivery terms and extension rules as specified.
Required submissions include GST registration, PAN card, recent financial statements, relevant experience certificates, EMD documents, technical compliance certificates, and OEM authorization where applicable. Prepare product data sheets for enamel, nitrocellulose, and air-dry finishes highlighting compliance with IS standards.
Delivery starts from the last date of the original order; quantity may vary ±25% during contract. If quantity increases, the delivery period scales as (increased/original) × original period, with a minimum extension of 30 days; delays due to buyer sample approval may extend delivery with no LD.
The successful bidder must submit up to 5 advance samples within 5 days of contract award. Buyer will approve or request modifications within 5 days; bulk supply must follow approved samples. Delays in approvals may reset delivery timelines with no liquidated damages.
Categories include finishing enamel, nitrocellulose finishing, finishing synthetic enamel, air-dry enamel, bituminous black acid alk, matt finish olive green, and green grass finishes. Specifications require consistent color and finish per contract; suppliers should provide data sheets and test reports for each category.
If samples deviate significantly, the buyer may require fresh samples for approval or terminate the contract with notice. The supplier must supply test-friendly reference samples if inspection is chosen and adjust production to meet approved standards.
Penalties apply through standard liquidated damages for delays beyond the approved delivery schedule. Delays caused by buyer’s sample approval are exempted from LD, and the delivery period may be reset accordingly; ensure compliance with the option-quantity framework.
Indian Army
📍 KUPWARA, JAMMU & KASHMIR
Indian Army
📍 KUPWARA, JAMMU & KASHMIR
Indian Army
📍 MEERUT, UTTAR PRADESH
Indian Army
Indian Coast Guard
📍 JAGATSINGHAPUR, ODISHA
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS