TenderDekho Logo
Active GEM

Aeronautical Development Agency CADENCE DESIGN SYSTEMS MBD Simulations MSC MasterKey Tender Bangalore 2026

Bid Publish Date

09-Sep-2026, 9:10 am

Bid End Date

24-Sep-2026, 5:00 pm

Location

BANGALORE , KARNATAKA

Progress

Issue09-Sep-2026, 9:10 am
AwardPending

Key Highlights

  • Brand/OEM requirement: CADENCE DESIGN SYSTEMS or authorized OEM vendors; OEM certificate mandatory
  • Delivery/installation: 15 days post PO; installation at ADA, Bangalore within 1 week of delivery
  • Training: 2 days for 6 ADA employees at Campus 1 or 2
  • Payment terms: 100% within 30 days after final acceptance and GRAN

Tender Overview

The Aeronautical Development Agency (ADA) invites bids for a CADENCE DESIGN SYSTEMS-based MSC MasterKey Plus Base token-Perpetual-Lic (ADAMS) intended for MBD simulations in store separation analysis. The scope covers supply, installation, testing, commissioning, operator training, and statutory clearances as required. Brand authorization must come from CADENCE DESIGN SYSTEMS or its OEM vendors, with OEM certificate uploaded. Delivery is 15 days post PO, installation in ADA, Bangalore, with a 1-year warranty and 10-year product support terms. Training comprises 2 days for 6 ADA staff. A 30-day payment window follows final acceptance. Bidder must provide a bid security declaration in lieu of EMD and adhere to installation/commissioning timelines.

Technical Specifications & Requirements

  • Product/service: CADENCE DESIGN SYSTEMS-based MSC MasterKey Plus Base token-Perpetual-Lic (ADAMS) for MBD simulations used in store separation analysis.
  • Delivery/installation: 15 days after Purchase Order; Installation & Commissioning at ADA, Bangalore within 1 week of delivery; Training: 2 days for 6 employees at ADA Campus 1 or 2.
  • Training & support: 2 days training; LICENSING: perpetual base token; License management across machines with alternate-machine license provision during warranty/ post-warranty. 10-year product support and license rectification obligations apply.
  • Documentation: OEM certificate required; final acceptance requires OEM warranty certificates; vendor must have established India-based after-sales support centers.
  • Payment: 100% payment within 30 days after final supply, installation, commissioning, and training, on submission of dispatch documents and GRAN.
  • Warranty & license: 1-year warranty from final acceptance; licenses to be available on alternate machines if primary machine fails; OEM-based rectification during warranty; post-warranty support guaranteed.

Terms, Conditions & Eligibility

  • EMD/bid security: Bid Security Declaration in lieu of EMD is required; if withdrawn or contract not signed after award, bidder may be suspended for up to 2 years.
  • Authorization: Brand on PAC basis; CADENCE DESIGN SYSTEMS OEM certificate must be uploaded; non-certified bids will be rejected.
  • Delivery term: 15 days from PO; installation/completion within ADA Bangalore jurisdiction; testing and training completion mandated.
  • Payment: 100% on completion within 30 days of final acceptance and GRN.
  • Warranty & service: 1-year warranty; 10-year license & license-tracking support; India-based service centers with prompt response.
  • Documentation: OEM certificates, training records, installation reports, and GRANDs to be submitted with final invoice.
  • Compliance: Supplier must show capability for installation, commissioning, training, and statutory clearances if applicable; adherence to ADA terms and conditions is mandatory.

Key Specifications

  • Product/service name: CADENCE DESIGN SYSTEMS-based MSC MasterKey Plus Base token-Perpetual-Lic (ADAMS)

  • Scope: MBD simulations for store separation analysis

  • Delivery: 15 days after Purchase Order

  • Installation: ADA, Bangalore within 1 week of delivery

  • Training: 2 days for 6 employees at ADA Campus 1 or 2

  • Warranty: 1 year from final acceptance; OEM certificates required

  • Licensing: Perpetual base token; licenses to alternate machines if primary machine fails

  • Support: 10-year product support by vendor; India-based service centers

  • Payment: 100% within 30 days after final supply and GRAN

Terms & Conditions

  • Brand authorization via PAC for CADENCE DESIGN SYSTEMS with OEM certificate

  • Delivery within 15 days; installation in Bangalore within 1 week

  • 100% payment within 30 days after final acceptance and GRAN

Important Clauses

Payment Terms

100% payment within 30 days after final supply, installation, commissioning, and training, upon submission of dispatch documents and GRAN.

Delivery Schedule

Delivery within 15 days of PO; installation and commissioning at ADA, Bangalore within 1 week of delivery.

Penalties/Liquidated Damages

Not specified in available data.

Bidder Eligibility

  • Authorized OEM certification from CADENCE DESIGN SYSTEMS or listed vendors

  • Capability to install, commission, train, and provide 10-year support within India

  • Compliance with PAC-based brand authorization and EMD-declaration requirement

Tender Data

Bid Details

Quantity

636

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

5 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

Yes

Bid Splitting Applied

No

Requirements

Warranty Period

1 years

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

MSC MasterKey Plus Base token-Perpetual-Lic-(ADAMS) for MBD Simulations in store separation analysis

Advisory Bank

State Bank of India

ePBG Percentage

5%

ePBG Duration (Months)

15

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

BANGALORE

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-BANGALOREBANGALORE--63615-

Authority Records

MINISTRY OF DEFENCEDEFENCE RESEARCH & DEVELOPMENT DEPARTMENTAERONAUTICAL DEVELOPMENT AGENCY

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9843940.pdf

Main Document

Other Documents

OTHER

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Categories 1

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

OEM certificate from CADENCE DESIGN SYSTEMS or authorized OEM vendor

2

Brand authorization letter (PAC basis) from CADENCE DESIGN SYSTEMS

3

Bid Security Declaration in lieu of EMD

4

Final acceptance certificates and GRAN with invoice

5

OEM warranty certificates for delivered goods

6

Evidence of India-based service centers for installation, commissioning, training, and maintenance

7

Dispatch documents and installation reports

8

Training completion records for 6 ADA staff

Frequently Asked Questions

How to bid for the CADENCE design system tender in Bengaluru 2026?

Bidders must submit OA/ PAC-brand authorization from CADENCE DESIGN SYSTEMS, upload the OEM certificate, and provide a Bid Security Declaration in lieu of EMD. Ensure installation, commissioning, and operator training within ADA Bengaluru timelines, with 15-day delivery and 1-week installation window.

What documents are required for ADA CADENCE tender submission in Bengaluru?

Required documents include OEM certificate from CADENCE DESIGN SYSTEMS, PAC-brand authorization, Bid Security Declaration, final acceptance certificates, GRAN, OEM warranty certificates, and proof of India-based service centers for installation, training, and maintenance.

What are the delivery and installation timelines for the ADA project?

Delivery must occur within 15 days after PO. Installation and commissioning at ADA, Bangalore must be completed within 1 week of delivery, followed by 2 days of operator training for six staff.

What are the payment terms for ADA CADENCE license supply?

Payment is 100% within 30 days after final acceptance, installation, commissioning, and training, contingent on submission of dispatch documents and GRAN.

What warranty and license support are required for the CADENCE system?

A 1-year warranty from final acceptance is required. OEM certificates must be provided at delivery, with 10-year product support and licenses capable of transferring to alternate machines if needed.

Which brands and authorization are acceptable for this ADA tender in Bengaluru?

Only CADENCE DESIGN SYSTEMS or authorized OEM vendors may participate with PAC-based authorization and an OEM certificate; non-certified bids will be rejected.

What after-sales service requirements are specified for this bid?

Vendor must establish India-based service centers offering installation, commissioning, training, troubleshooting, and maintenance. Licenses must be managed to ensure continuity on alternate machines post-warranty.

What is the scope of supply and training coverage in this tender?

Scope includes supply, installation, testing, commissioning, and training of operators. Training covers two days for six ADA staff, with statutory clearances handled if required.

Explore More Opportunities

Quick Access