Airports Authority of India invites bids for the replacement of 11KV HT metering cubical panel with a new cubical panel featuring an ABT meter at Kalaburagi Airport, Karnataka. The scope centers on upgrading existing metering infrastructure to ABT-enabled monitoring at the airport site. The BoQ contains 0 items, indicating a single-line replacement project with potential post-tender clarifications. The procurement emphasizes compliance with ABT metering requirements and safe 11KV installation practices. The tender highlights the option clause allowing variation up to 25% in ordered quantity and additional delivery time formulas, signaling flexibility in quantity and schedule aligned to site needs. This opportunity is positioned under the Airports Authority of India’s electrical infrastructure modernization program for Kalaburagi.
Option clause allowing ±25% quantity variation and extended delivery time
Delivery terminology anchored to last date of original delivery order
Additional time computation with minimum 30 days when exercising option clause
Purchaser may modify ordered quantity by up to 25% during contract at contracted rates.
Additional time = (Increased quantity / Original quantity) × Original delivery period; minimum 30 days.
Not specified in data; bidders should seek explicit LD terms during bid clarification.
Experience in HT electrical panel replacement and ABT meter integration
Demonstrated capability for safe installation of 11KV equipment
Financial capacity and certifications typical for electrical procurement bids
Main Document
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Ans,finance,hr,engineering,tech,ops,commercial,general Store,it
WEST DELHI, DELHI
Tender Results
Loading results...
- GST registration certificate
- PAN card and company details
- Experience certificates for HT panel replacement projects
- Financial statements or bankers’ solvency certificate
- EMD submission documents as per tender (amount not disclosed in data)
- Technical bid documents and any OEM authorizations for ABT meters
- Installation methodology and safety compliance statements
Extended Deadline
21-Jan-2026, 4:00 pm
Opening Date
21-Jan-2026, 4:30 pm
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | BHARAT ELECTRIC Under PMA | Make : NA Model : 11KV HT metering Cubical panel with New Cubical Title : Replacement of 11KV HT metering Cubical panel with New Cubical panel with ABT meter at Kalaburagi Ai | 15-01-2026 15:07:41 | Qualified |
| 2 | ELECTROLINKS Under PMA | Make : Unbranded--VISTA SOLUTIONS Model : 11KV Title : Replacement of 11KV HT metering Cubical panel with New Cubical panel with ABT meter at Kalaburagi Ai | 17-01-2026 18:48:34 | Disqualified |
| 3 | V R ASSOCIATES Under PMA | Make : NA Model : 11KV HT metering Cubical panel Title : Replacement of 11KV HT metering Cubical panel with New Cubical panel with ABT meter at Kalaburagi Ai | 18-01-2026 15:14:37 | Qualified |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | BHARAT ELECTRIC Under PMA | ₹2,58,644 | Item Categories : Replacement of 11KV HT metering Cubical panel with New Cubical panel with ABT meter at Kalaburagi A |
| L2 | V R ASSOCIATES Under PMA | ₹2,66,949 | Item Categories : Replacement of 11KV HT metering Cubical panel with New Cubical panel with ABT meter at Kalaburagi A |
Please sign in or create an account to view contract details and download result documents.
Key insights about KARNATAKA tender market
Bidders should confirm scope with AAI, submit standard documents (GST, PAN, experience certificates, financials), ensure ABT-ready meter integration, and provide installation methodology. Adhere to the option clause allowing ±25% quantity variation and clarify delivery timelines with the last-date-of-original-order reference.
Required documents typically include GST registration, PAN, company details, experience certificates for HT panel work, financial statements, EMD submission proof, OEM authorizations for ABT meters, and installation safety plans; verify exact EMD amount and submission format in bid clarifications.
ABT integration means the new cubical panel must support ABT-enabled energy accounting and remote monitoring. Bidders should provide ABT-compatible metering devices, installation diagrams, interconnection with existing systems, and compliance with ABT interface standards as applicable to high-voltage metering.
Delivery timelines are linked to the original order date; if the option clause is exercised, additional time is calculated using the formula and must meet a minimum of 30 days. Precise delivery dates should be confirmed in the final purchase order.
Payment terms are not specified in the data; bidders should await clarified terms in the tender documents, but typical electrical procurements include milestone payments on delivery and installation with verification by AAI engineers.
No explicit standards are listed; bidders should plan ABT-compliant meters and safe 11KV installation practices, and seek confirmation on IS/IEC standards and ABT interface norms during bid clarification.
Prepare a technical bid with ABT-compatible meter details, installation plan, safety certifications, and a financial bid. Include OEM authorization for ABT meters, prior project experience, and alignment with the option clause for quantity variation and delivery flexibility.
The BOQ lists 0 items, indicating a single-unit replacement scope. Bidders should verify with the purchasing authority whether accessories, cabling, or ancillary components are included or priced separately during bid submission.