TenderDekho Logo
Active GEM

BHEL Ready Assembly for Heat Compensating Nut with Eye Bolt and Pin for 4QC Slide Gate System Tender 2026

Bid Publish Date

29-Jul-2026, 8:11 am

Bid End Date

01-Aug-2026, 1:00 pm

Location

HARIDWAR , UTTARAKHAND

Progress

Issue29-Jul-2026, 8:11 am
AwardPending
Explore all 6 tabs to view complete tender details

Quantity

50

Bid Type

Two Packet Bid

Tender Overview

Bharat Heavy Electricals Limited (BHEL), under the Department of Heavy Industry, calls for a ready assembly of heat compensating nut with eye bolt and pin for a 4QC slide gate system. Scope is procurement of goods with flexible quantity options up to 25% additional quantity at contracted rates. Location details are not specified; inspection is via a nominated agency with pre‑dispatch inspection. The tender implements MSE purchase preference and requires bidders to consider GST implications independently. The scope is limited to supply of goods with no service components, and the option clause governs delivery timelines relative to the original order and extended periods.

Technical Specifications & Requirements

  • Product/service: Ready assembly for heat compensating nut, eye bolt and pin for 4QC slide gate system. No technical specs provided in the tender data.
  • Delivery concepts: Quantity may be increased by up to 25% during contractual period; delivery time scales from the last date of the original delivery order with minimum 30 days, subject to extension rules.
  • Inspection: Pre‑dispatch inspection to be conducted by a nominated agency on behalf of the buyer.
  • Purchase preference: MSEs may receive preference if the bidder is the manufacturer of the offered product; traders are excluded.
  • GST handling: Bidder to determine GST impact; reimbursement is as per actuals or applicable rates, whichever is lower.
  • Payment/Scope: Scope of supply includes only goods, with no ancillary services; PAN, GSTIN, and EFT mandate documentation may be required for vendor setup.

Terms, Conditions & Eligibility

  • Option Clause: Purchaser may increase/decrease quantity up to 25% at contracted rates; delivery period adjusts proportionally with a minimum of 30 days.
  • GST: Bidders must assess GST; reimbursement as per actuals or lower applicable rate.
  • Vendor code & documents: Required submission includes PAN card, GSTIN, cancelled cheque, and EFT mandate certified by bank.
  • MSE Preference: Available if bidder is manufacturer; sub‑limits apply to percentage of contract value and collaboration with MSEs.
  • Inspection: Pre‑dispatch inspection by a nominated agency; acceptance based on inspection outcome.
  • Scope: Bid price must cover all cost components for the supply of goods only.

Key Specifications

  • Product: heat compensating nut with eye bolt and pin for 4QC slide gate system

  • Quantity: not specified; option to increase by 25%

  • Delivery: proportional extension with minimum 30 days

  • Standards: Not specified in tender

  • Inspection: Pre‑dispatch inspection by nominated agency

Terms & Conditions

  • Option to increase/decrease quantity up to 25% at contracted rates

  • GST to be calculated by bidder; reimbursement as actuals or applicable rate

  • MSE purchase preference available if bidder is manufacturer

Important Clauses

Payment Terms

GST handling and vendor payment terms to be as per actuals or lower applicable rate; no explicit payment schedule described

Delivery Schedule

Delivery period calculated from last date of original delivery order; extended period based on increased quantity with minimum 30 days

Penalties/Liquidated Damages

Not specified in the available terms

Bidder Eligibility

  • Manufacturer of the offered product to avail MSE preference

  • Submit PAN, GSTIN, and EFT mandate with bid

  • Pre‑dispatch inspection approval from nominated agency

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

READY ASSEMBLY FOR HEAT COMPENSATING NUT WITH EYE BOLT AND PIN FOR 4QC SLIDE GATE SYSTEM

Payment Timelines

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

50

Delivery Locations

1

Delivery Cities

Haridwar

Delivery Pincodes

249403

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Kumar Siddhartha249403,Central Foundry Forge Plant, BHEL, Ranipur, HaridwarHaridwarUttarakhand249403-50-

Authority Records

MINISTRY OF HEAVY INDUSTRIESHEAVY INDUSTRY DEPARTMENTBHARAT HEAVY ELECTRICALS LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-9670920.pdf

Main Document

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST certificate

2

PAN card

3

Cancelled cheque

4

EFT mandate certified by bank

5

Any OEM authorizations (if applicable)

6

Experience certificates (if available)

Frequently Asked Questions

How to bid for BHEL heat compensating nut assembly tender 2026

To bid, bidders must supply PAN, GSTIN, cancelled cheque, and EFT mandate; ensure the product is manufacturer‑supplied for MSE preference, and be prepared for pre‑dispatch inspection by a nominated agency. Quantities can vary up to 25% with contracted pricing.

What documents are required for vendor setup by BHEL

Submit PAN, GSTIN, cancelled cheque, EFT mandate, and any OEM authorizations. Also provide GST compliance details and prior supplier experience certificates if available; ensure these match the scope of supply for ready assembly components.

What are the delivery and extension terms for quantity adjustments

Delivery begins from the last date of the original delivery order; quantity can rise up to 25% during contract, with extended time calculated as (increased/ original) × original days, minimum 30 days; extension may reach the remaining original period.

What inspection occurs before acceptance of goods

A nominated inspection agency will perform pre‑dispatch inspection on behalf of BHEL; passing inspection enables acceptance and release for dispatch; any non‑conformance may require corrective action per contract terms.

How does GST impact the bidding for this procurement

GST is to be assessed by the bidder; reimbursement will be at actuals or the lower applicable rate, not exceeding quoted GST percentage; bidders should price GST accordingly.

What is the scope of supply for this tender

Scope covers only supply of goods (ready assembly components for heat compensating nut with eye bolt and pin) with no service components; bidders must price all cost components within the bid price.

What is the MSE preference criterion for this bid

MSE preference applies if the bidder is the manufacturer of the offered product; traders are excluded; price matching within L1+15% may be allowed to secure up to 25% of the contract value for the MSE responder.

What is the tender category and organization involved in this bid

This tender is issued by Bharat Heavy Electricals Limited under the Department of Heavy Industry for ready assembly components used in a 4QC slide gate system; quantity and delivery terms are governed by the option clause and inspection requirements.