Bid Publish Date
03-Oct-2026, 2:21 pm
Bid End Date
19-Oct-2026, 9:00 am
Location
Progress
The Indian Army, under the Department Of Military Affairs, invites bids for the preparation and submission of detailed architectural drawings and structural design. The scope includes detailed design drawings with approvals from the buyer within 7 days of contract award, and potential quantity adjustments up to 25% during contract execution. Bidders must submit PAN, GSTIN, cancelled cheque, and EFT mandate with the bid. The process accommodates extended delivery time if the option clause is exercised, with a minimum 30-day increment rule. The contract emphasizes adherence to buyer-directed design changes and NDA obligations.
Detailed architectural drawings
Structural design drawings
7-day submission window for Detailed Design Drawings after contract award
Approval or modification list provided by buyer within 7 days
NDA to be uploaded with bid
PAN, GSTIN, cancelled cheque, EFT mandate with bid
Option to increase/decrease quantity up to 25%
Option clause allows ±25% quantity change during contract
7-day approval window for detailed drawings post-award
NDA and financial docs required at bid submission
Not explicitly stated; ensure compliance with standard NDA and performance-based payments per contract.
Delivery period may extend if buyer delays drawing approvals; additional time calculated with formula, minimum 30 days.
Not specified in tender; monitor for LD terms in final contract and option clause implementation.
Must submit PAN, GSTIN, cancelled cheque, and EFT mandate
Must upload NDA on bidder letterhead
Must comply with buyer-approved design modifications within specified timelines
Quantity
1
Bid Type
Two Packet Bid
Bid Validity
150 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
Min. Avg. Annual Turnover
135
OEM Avg. Turnover
5
Past Performance
80 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Preparation and submission of detailed Architectural drawing of building & structural design
Max Delivery Days
30
Delivery Locations
1
Delivery Cities
ALLAHABAD
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | ALLAHABAD | ALLAHABAD | - | - | 1 | 30 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Extended Deadline
19-Oct-2026, 3:30 am
Opening Date
20-Oct-2026, 3:30 am
Extended Deadline
17-Oct-2026, 3:30 am
Opening Date
18-Oct-2026, 3:30 am
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Annual Turnover *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Key insights about UTTAR PRADESH tender market
Bidders must submit PAN, GSTIN, cancelled cheque, and EFT mandate with the bid, plus an NDA on the bidder's letterhead. Ensure Detailed Design Drawings are prepared and submitted within 7 days of contract award, and be ready for buyer-approved modifications within 7 days. The option clause allows ±25% quantity changes during contract execution.
Required documents include PAN Card copy, GSTIN, cancelled cheque, EFT Mandate certified by bank, and a Non-Disclosure Declaration. These must accompany the bid, along with any technical drawings and design qualifications demonstrating capability to deliver detailed architectural and structural drawings.
The purchaser can increase quantity up to 25% of contracted quantity. Delivery time extends using the formula (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum extension of 30 days. Original delivery period cannot be reduced by the option clause.
Detailed Design Drawings must be submitted within 7 days of contract award. The buyer will approve or provide a list of modifications within 7 days. If the buyer delays approval, the delivery period is refixed without LD for the delay period.
Bidders must upload a Non-Disclosure Declaration on the bidder’s letterhead, committing not to disclose contract details, designs, or specifications to third parties during or after contract execution, with potential legal action for violations.
If the buyer delays approval, the delivery period is re-fixed without liquidated damages for the delay period. The bidder must proceed according to the redefined schedule once approvals are granted and modifications communicated.
Yes, a mandatory NDA must be uploaded. Bid details and drawings are confidential; disclosure to third parties is prohibited. Non-compliance may trigger legal action under prevailing rules and jeopardize bid validity.
Scope includes preparation and submission of detailed architectural drawings and structural design documentation for government buildings, with approvals required within 7 days of award and potential design modification cycles as directed by the buyer.