TenderDekho Logo
GEM

Secretariat Office West Bengal Stock Pot Stove Tender 2025 WB - Stock Pot Stove Q3 Specification

Bid Publish Date

25-Nov-2025, 4:03 pm

Bid End Date

13-Dec-2025, 5:00 pm

Generate Docs

Progress

Issue25-Nov-2025, 4:03 pm
Corrigendum06-Dec-2025
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

2808

Bid Type

Two Packet Bid

Tender Overview

The Secretariat Office, under the West Bengal Land and Land Reforms Department, invites bids for a Stock Pot Stove (Q3). The tender requires bidders to supply, install, test and commission the specified equipment, with an option to increase quantity up to 25% of the bid quantity and to adjust delivery time accordingly. A detailed design drawing must be approved within 7 days of award, with modifications communicated within the same period. The scope includes delivery at project site, installation, testing and commissioning. The bidding process enforces compliance with the option clause, and bidders must maintain financial stability and GST awareness. This opportunity targets vendors capable of rapid design validation, procurement efficiency and on-site deployment under a government procurement framework in West Bengal.

Technical Specifications & Requirements

  • Product: Stock Pot Stove (Q3), organization: Secretariat Office (West Bengal).
  • Key milestones: 7 days for Detailed Design Drawings submission; approvals or modification lists returned within 7 days.
  • Scope: Supply, Installation, Testing and Commissioning (SITC) of the stock pot stoves; delivery period linked to original order with extension mechanics via the option clause.
  • Financials: GST to be determined by supplier; GST reimbursement as per actuals or applicable rates, whichever is lower, capped to quoted GST percentage.
  • Compliance: No explicit BOQ items; turnover criteria reference last three years with annual turnover evidence to be provided in the bid.
  • Risks: If buyer delays drawing approval, delivery timelines may be reset without liquidated damages.

Terms, Conditions & Eligibility

  • Quantity: Option to increase up to 25% during contract; delivery period adjustments follow a defined formula with a minimum of 30 days.
  • Eligibility: Bidder must demonstrate financial standing; not under liquidation or similar proceedings; an undertaking to this effect must be uploaded.
  • Documentation: GST details, turnover certificates, audited financials or CA certificates, and proof of experience in SITC of similar equipment.
  • Scope: The bid price must include SITC costs; no separate charges for installation and commissioning.
  • Payment: GST payable according to actuals; no explicit advance/payment terms stated; delivery linked to approved drawings; penalties not specified.
  • Risk/Dispute: If drawings approval is delayed by Buyer, delivery schedule will be adjusted accordingly with no LD for the delay.

Key Specifications

  • Product name and category: Stock Pot Stove (Q3)

  • Scope: Supply, Installation, Testing and Commissioning (SITC)

  • Delivery terms: Extension as per option clause with minimum 30 days

  • Standards/Compliance: Not explicitly specified in tender; seek confirmation during bid

  • Financials: GST applicable; reimbursement as per actuals or lower of quoted GST rate

  • Drawings: Detailed Design Drawings due within 7 days of award; buyer approval required

Terms & Conditions

  • Option Clause allows ±25% quantity variation and extended delivery time at contract rates

  • Detailed Design Drawings must be submitted within 7 days and approved or modified within 7 days

  • GST responsibility rests with bidder; reimbursement capped to the lower of actuals or quoted GST

  • Supply, Installation, Testing and Commissioning are included in scope and bid price

  • Delivery delay due to buyer drawing approval results in timeline reset without LD

Important Clauses

Payment Terms

GST payable per actuals or lower of quoted GST rate; no explicit advance payment detailed

Delivery Schedule

Delivery period linked to original delivery order; option clause may extend period with minimum 30 days

Penalties/Liquidated Damages

No LD specified if buyer delays drawing approval; delivery schedule will be refixed

Bidder Eligibility

  • Not under liquidation, court receivership, or similar proceedings

  • Demonstrated turnover in the last 3 financial years per bid documents

  • Experience in SITC of similar government procurement equipment

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Stock Pot Stove (Q3)

Authority Records

LAND AND LAND REFORMS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 3

GeM-Bidding-8633605.pdf

Main Document

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

Stock Pot Stove

Kolayad Gramapanchayat

KANNUR, KERALA

Posted: 20 February 2026
Closed: 3 March 2026
GEM

Stock Pot Stove

Indian Institute Of Management (iim)

AHMEDABAD, GUJARAT

Posted: 13 March 2025
Closed: 4 April 2025
GEM

Stock Pot Stove

Indian Army

ALMORA, UTTARAKHAND

Posted: 18 March 2025
Closed: 20 March 2025
GEM

Stock Pot Stove

School Education Portal

SHIVPURI, MADHYA PRADESH

Posted: 8 July 2025
Closed: 28 July 2025
GEM

Stock Pot Stove

Indian Army

EAST SIKKIM, SIKKIM

Posted: 4 July 2025
Closed: 14 July 2025
GEM

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Audited financial statements for the last 3 years or CA certificate indicating turnover

4

Turnover certificate from CA/Cost Accountant

5

Details of experience in SITC of similar equipment

6

Bidder undertaking not to be in liquidation or similar proceedings

7

Detailed Design Drawings submission (within 7 days of award) and approval list

8

Any OEM authorization or collaboration documents (if applicable)

Corrigendum Updates

3 Updates
#1

Update

06-Dec-2025
#2

Update

05-Dec-2025
#3

Update

05-Dec-2025

Extended Deadline

13-Dec-2025, 5:00 pm

Opening Date

13-Dec-2025, 5:30 pm

Frequently Asked Questions

Key insights about WEST BENGAL tender market

How to bid on stock pot stove tender in West Bengal 2025?

Bidders must submit GST, PAN, turnover certificates, and experience proofs; attach Detailed Design Drawings within 7 days of award and obtain buyer approvals. Include SITC scope in the bid price and show turnover meeting last 3 years' criteria. Ensure compliance with the 25% quantity option and delivery extension rules.

What documents are required for WB stock pot stove bidding 2025?

Required documents include GST registration, PAN, audited financials or CA turnover certificate for three years, experience certificates in SITC, and an undertaking that the bidder is not under liquidation. Also include OEM authorizations if applicable and Detailed Design Drawings timelines.

What are the delivery terms for the Secretariat Office stove tender in WB?

Delivery is tied to the original order timeline; option clause allows up to 25% quantity increase with extended delivery time, calculated as (increased/original) × original period, minimum 30 days. If drawings delay, delivery period is reset without LD.

Which GST terms apply to the West Bengal stock pot stove tender?

Bidders must determine GST themselves; reimbursement is either actual GST or the lower quoted rate. The procurement will reimburse GST as per actuals, subject to the maximum of the quoted GST percentage.

What is the scope of supply for the WB stove procurement?

Scope includes Supply, Installation, Testing and Commissioning of the stock pot stoves. The bid price must cover all cost components for SITC, with installation and commissioning included in the contract.

What is the approval timeline for detailed drawings in this tender?

Bidders must submit Detailed Design Drawings within 7 days of award. The buyer will approve or provide modification lists within 7 days; delays by the buyer extend the delivery schedule with no LD.

What are the key eligibility criteria for the West Bengal stove bid 2025?

Eligibility requires no liquidation or similar proceedings, three-year turnover evidence, and relevant SITC experience. Provide CA-certified turnover details and ensure compliance with option-clauses and SITC requirements for government procurement.

Similar Tenders

5 found
Urgent

Border Road Organisation Stock Pot Stove & Bain Marie Tender Imphal Manipur 2026

Border Road Organisation

📍 IMPHAL WEST, MANIPUR

⏰ Deadline: 6 days left
🛒 Type: Goods
View GEM
Urgent

Wick Type Kerosene Oil Heater

Indian Army

📍 BARDHAMAN, WEST BENGAL

⏰ Deadline: 2 days left
🛒 Type: Goods
View GEM
Urgent

LIC Life Insurance Corporation Thermal Casserole and Hotpot Tender Anuppur Madhya Pradesh 9001 ISO 2026

Lic - Life Insurance Corporation Of India

📍 ANUPPUR, MADHYA PRADESH

⏰ Deadline: 6 days left
🛒 Type: Goods
View GEM
Urgent

Indo Tibetan Border Police Thermal Casserole and Hotpot Tender PITHORAGARH Uttarakhand 2026

Indo Tibetan Border Police (itbp)

📍 PITHORAGARH, UTTARAKHAND

⏰ Deadline: 2 days left
🛒 Type: Goods
View GEM
Urgent

Fireclay Bricks (RINL)

Border Security Force (bsf)

📍 BARAMULLA, JAMMU & KASHMIR

⏰ Deadline: 2 days left
🛒 Type: Goods
View GEM